Claim Missing Document
Check
Articles

Found 5 Documents
Search

TINJAUAN ADDENDUM WAKTU PELAKSANAAN PROYEK PEMBANGUNAN JEMBATAN KAMPUNG BARU NAN XX KOTA PADANG Nasrul, Nasrul; Mulyadi, Beni
Rang Teknik Journal Vol 2, No 2 (2019): Volume 2 No 2 Juni2019
Publisher : Fakultas Teknik Universitas Muhammadiyah Sumatera Barat

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (180.224 KB) | DOI: 10.31869/rtj.v2i2.1382

Abstract

Project management is a scientific discipline in terms of planning, organizing, managing (running and controlling) to be able to achieve project objectives. The role of project management in implementing a construction project is very important, considering the process of implementing construction projects is dynamic. The implementation plan for a project is often preceded by normative assumptions, whereas in the implementation process a lot of unexpected things occur that result in the delay of a job resulting in changes, ranging from weather, environmental social factors to the adjustment of contract volume. One of the compensation for the changes is an extension of the time of contract implementation, but this change certainly must be addressed technically and administratively because without a complete document the changes would certainly not be valid. The contract addendum is one of the valid proofs of a change, because the addendum although physically separate from the principal agreement will be legally addendum still attached to the principal agreement itself. This paper contains the mechanism and conditions for submitting an addendum for the extension of the implementation of the contract so that the addendum is eligible to be accepted in the applicable rules.Keywords: project management, addendum contract, extra time
TINJAUAN ADDENDUM WAKTU PELAKSANAAN PROYEK PEMBANGUNAN JEMBATAN KAMPUNG BARU NAN XX KOTA PADANG Nasrul, Nasrul; Mulyadi, Beni
Rang Teknik Journal Vol 2, No 2 (2019): Volume 2 No 2 Juni 2019 Rang Teknik Journal
Publisher : Fakultas Teknik Universitas Muhammadiyah Sumatera Barat

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (180.224 KB) | DOI: 10.31869/rtj.v2i2.1382

Abstract

Project management is a scientific discipline in terms of planning, organizing, managing (running and controlling) to be able to achieve project objectives. The role of project management in implementing a construction project is very important, considering the process of implementing construction projects is dynamic. The implementation plan for a project is often preceded by normative assumptions, whereas in the implementation process a lot of unexpected things occur that result in the delay of a job resulting in changes, ranging from weather, environmental social factors to the adjustment of contract volume. One of the compensation for the changes is an extension of the time of contract implementation, but this change certainly must be addressed technically and administratively because without a complete document the changes would certainly not be valid. The contract addendum is one of the valid proofs of a change, because the addendum although physically separate from the principal agreement will be legally addendum still attached to the principal agreement itself. This paper contains the mechanism and conditions for submitting an addendum for the extension of the implementation of the contract so that the addendum is eligible to be accepted in the applicable rules.Keywords: project management, addendum contract, extra time
Analisa persepsi penerima program BSPS Nagari Bungo Pasang Salido Kecamatan IV Jurai Kabupaten Pesisir Selatan Dian Wahyoni DF; Merry Thressia; Mulyadi Mulyadi
Jurnal Zona Vol 5, No 1 (2021)
Publisher : Pelantar Press

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.52364/zona.v5i1.45

Abstract

The state is responsible for protecting the entire Indonesian nation through the implementation of housing and settlement areas so that people are able to live and occupy decent and affordable houses in a healthy, safe, harmonious and sustainable environment throughout Indonesia. Implementation of Self-Help Housing Stimulant Assistance (BSPS) is carried out through activities to improve the quality of self-help houses and the construction of new self-help houses as well as incentives for the construction of new self-help houses in the form of infrastructure, facilities and public utilities. One of the areas targeted by the BSPS program is Nagari Bungo Pasang Salido. This study aims to 1). evaluate the results of the implementation of the BSPS Program and see the results of its achievements in terms of security and standard housing structures for beneficiaries, 2). improve the quality of basic research results and produce scientific publications in reputable international scientific journals. This research uses the direct method by distributing questionnaires to the recipients of the BSPS program assistance. The results of this research show that the study of the achievement of the BSPS program for the beneficiary community is very good, with a questionnaire result with a percentage of 100%. The study on the safety of beneficiaries in occupying a house that is suitable for habitation with the feasibility of a fairly good structure, where the average percentage is 76.5% consisting of 7 indicators with 6 indicators worth 100% and 1 indicator worth 35.7%. The results of the Achievement of the Standards for Habitable House Structures for the BSPS Program in Structure Development, the average result is 97.19% consisting of 14 indicators.
Gambaran logam berat merkuri (Hg) pada kuku penambang emas di Nagari Koto Tuo, Sijunjung Sumatera Barat Dewi Yudiana Shinta; Herix Sonata MS; Mulyadi Mulyadi; Merry Thressia; Yolanda Oktarina
Jurnal Zona Vol 6, No 1 (2022)
Publisher : Pelantar Press

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.52364/zona.v6i1.55

Abstract

Unlicensed Gold Mining (PETI), was found in 4 districts in West Sumatra including, Dharmasraya covering an area of 1,773 ha, Solok 1,533 ha, Solok Selatan 2,559 ha, and Sijunjung 1,103 ha. PETI is a traditional gold mining activity, the results are processed using the amalgamation method. The amalgamation process in the PETI activity will result in environmental degradation caused by the washing process carried out in the river and the process of refining gold ore by burning which produces mercury vapor (Hg) which evaporates in the air. The amalgamation process can cause negative impacts in the form of environmental pollution by mercury vapor as a result of the process. As much as 10 - 30% of the mercury used in the gold amalgamation process will be released into the environment. The main health problems caused by mercury vapor occur in the brain, lungs, central nervous system and kidneys. The purpose of this study was to describe the level of toxicity that occurs in humans through nails on illegal gold miners in Nagari Koto Tuo Sijunjung, West Sumatra. The benefit of the research is as information that is conveyed to local governments and people who are exposed to heavy metals for the dangers they face. The research method is an observational study with a cross sectional study design, which is a study in which the variables including risk factors and variables including effects are observed simultaneously at the same time. The number of samples used in this study were 13 people. Samples were taken using accidental sampling technique. The method used to determine levels of metallic mercury in nails is wet destruction and examined by AAS. The results of this study used 13 active gold miners with a working period of 20.10 and 5 years with mercury levels of 10.31 mg/kg, 10.04 mg/kg, and 7.30 mg/kg. Based on the results of the standard deviation (SD) test, it was found that the average level of mercury in the nails of gold miner Koto Tuo, Sijunjung was 9.21 mg/kg with an average working life of 34 years and a standard deviation of 1.665. Mercury is a neurotoxin if used in high doses can damage the person's organs.
Evaluasi Penerapan Keselamatan Dan Kesehatan Kerja (K3) Pada Pembangunan Gedung Laboratorium Mulyadi Mulyadi; Dewi Yudiana Shinta; Hendra Mukhlis; Merry Thressia; Herix Sonata MS
Innovative: Journal Of Social Science Research Vol. 3 No. 3 (2023): Innovative: Journal Of Social Science Research
Publisher : Universitas Pahlawan Tuanku Tambusai

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31004/innovative.v3i3.2045

Abstract

Masalah keselamatan dan kesehatan kerja (K3) di Indonesia masih sering terabaikan. Hal ini ditunjukkan dengan masih tingginya angka kecelakaan kerja. Di Indonesia, khususnya dalam dunia usaha yang membutuhkan tenaga kerja yang banyak seperti halnya proyek konstruksi seringkali kesehatan dan keselamatan kerja diabaikan dengan alasan klasik oleh para pemilik usaha bahwa biaya untuk kesehatan dan keselamatan kerja bagi pekerja dianggap mahal. Tujuan penelitian adalah Untuk mengetahui penerapan program Keselamatan dan Kesehatan Kerja (K3) dan Untuk mengevaluasi penerapan program keselamatan dan kesehatan kerja (K3) pada pembangunan gedung laboratorium. Manfaat penelitian sebagai acuan dalam pengambilan keputusan mengenai kewajiban perusahaan atas undang-undang atau pemerintahan sekaligus memenuhi hak karyawan dalam kaitanya dengan keselamatan dan kesehatan kerja (K3) dalam perusahaan (Tempat kerja). Jenis penelitian kualitatif diperoleh data tingkat safety induction, toolbox meeting, dan kepatuhan penggunaan Alat Pelindung Diri (APD) pekerja. Metoda penelitian dalam pengumpulan data primer dilakukan dengan cara wawancara atau diskusi berupa gambaran Keselamatan dan Kesehatan Kerja (K3) di proyek pembangunan gedung Laboratorium Sentral Universitas Andalas Padang. Kesimpulan dari penelitian ini adalah Tingkat kesadaran pekerja dalam penggunaan Alat Pelindung Diri (APD) di Proyek Pembangunan Gedung Laboratorium Central Universitas Andalas Padang berdasarkan hasil Observasi dan wawancara yang  dilakukan termasuk kedalam kategori sudah mencapai tingkat kesadaran yang baik, terbukti dengan jawaban dari wawancara. Alat Pelindung Diri dengan pernyataan memakai helm safety lebih dari 50%, yang memakai kaca mata dibawah 50%, tidak memakai kacamata lebih dari 50% dan memakai kaca mata tergantung jenis pekerjaan dibawah 50%, untuk yang memakai masker dibawah 50%, tidak memakai masker lebih dari 50%, memakai tergantung jenis pekerjaan dibawah 50%, untuk yang memakai sarung tangan lebih dari 50%, tidak memakai sarung tangan dibawah 50% dan yang menjawab kadang – kadang dibawah 50%, untuk yang memakai rompi safety dan sepatu safety lebih dari 50%.Tingkat kesadaran kesadaran pekerja tentang Penggunaan Alat Pelindung Diri (APD) sudah baik hanya saja dalam penerapan sehari – hari masih ada beberapa pekerja yang lalai dalam penggunaan Alat Pelindung Diri (APD) dengan alasan – alasan pribadi.