Claim Missing Document
Check
Articles

Found 2 Documents
Search
Journal : Jurnal Talenta Sipil

Analisis Pemilihan Moda Transportasi Untuk Perjalanan Ke Kampus (Studi Kasus: Civitas Akademik Politeknik Negeri Bali) Fransiska Moi; Ni Putu Indah Yuliana
Jurnal Talenta Sipil Vol 5, No 2 (2022): Agustus
Publisher : Universitas Batanghari Jambi

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33087/talentasipil.v5i2.38

Abstract

In carrying out the daily movement of man from one place to another requires a mode of transportation. In this context, the ownership and use of private and public vehicles can be said to be one of the alternatives for society in meeting the demands of the movement. Specifically in the travel pattern there is information about the characteristics of the traveler and the type of activity of the individual or person per person. Jimbaran area as a tourist area  and synonymous with educational institutions and campuses, of course there are many tourist attractions and campuses, one of which is the Bali State Polytechnic. Along with this, research on the preference behavior of the use of student transportation vehicles, aims  to analyze the choice of modes on daily trips to PNB, using the Analytic Hierarchy Process  method with expert choice software version 11.  to find out the most influential factors. The instrument includes a questionnaire form as well as conducting observations and direct interviews with the  PNB academic community to identify the characteristics of  the PNB academic community in the selection of transportation modes, analyzing the factors that most influence the use of transportation modes, both private vehicles and public vehicles. The results showed that the first priority for undergraduate students at the criteria level was the criteria for getting the highest weight of 36.4% followed by the cost criteria of 34.1%, and finally the safe criteria of 2 9.5%, with an inconsistency value of  0.00096 . From the results of the expert assessment through the questionnaire given, the alternative mode of transportation chosen was motorcycles by 46.4% as the first alternative in the selection of transportation modes, followed by private cars by 35.7% and finally public transportation by  17.9%.
Analisis Biaya Pembangunan Site Facilities Proyek Revetment dan Retaining Wall Dermaga Benoa I Gede Bambang Wahyudi; Kadek Adi Parthama; I Wayan Sujahtra; Ni Kadek Sri Ebtha Yuni; Ni Putu Indah Yuliana
Jurnal Talenta Sipil Vol 6, No 2 (2023): Agustus
Publisher : Universitas Batanghari Jambi

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33087/talentasipil.v6i2.317

Abstract

Process of a construction project is knowing how much a building will cost. Like the main building, the project site facilities also require costs that are not included in the direct financing of the project. The goal is to provide detailed information on the cost of building site facilities and to serve as reference material for the preparation of RAB site facilities. Implemented in the Revetment dan Retaining Wall Harbor Benoa project, the survey it was found that this project had built a number of temporary facilities but did not clearly detail the cost requirements. The research used descriptive quantitative methods and data collection in the form of surveys, observations and interviews. Survey to measure temporary buildings at the project site and find unit prices of tools, materials and labor at shops or foremen around the project area. Observation observes the layout of the building which will be outlined in the field layout drawing.An interview with the project manager was conducted to find out the total cost of the project and the costs incurred by the contractor for construction. Data analysis using Microsoft Excel by entering all components to be analyzed. Based on the results, it is concluded that the site facilities that are built are the contractor's office, health room, motorcycle and car parking, workers' toilets, directors' and consultants' offices, LAB rooms, cement and plywood warehouses, mechanical warehouses, security and K3 posts, workers' beds, trash bins, and water reservoirs. The comparison of site facilities cost to contract is 0.253%.