p-Index From 2019 - 2024
0.408
P-Index
This Author published in this journals
All Journal Rekayasa Mesin
Anggara, Teuku
Unknown Affiliation

Published : 1 Documents Claim Missing Document
Claim Missing Document
Check
Articles

Found 1 Documents
Search

PENJADWALAN PERAWATAN DENGAN METODE CAMPBELL DUDEL SMITH (CDS) UNTUK MENINGKATKAN PRODUKSI MESIN RECYCLE WASTE TEMBAKAU Anggara, Teuku; Pratikto, Pratikto; Sonief, Achmad As?ad
Rekayasa Mesin Vol 11, No 1 (2020)
Publisher : Jurusan Teknik Mesin, Fakultas Teknik, Universitas Brawijaya

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.21776/ub.jrm.2020.011.01.12

Abstract

The Campbell Dudek Smith (CDS) method is commonly used by large companies to help them make Flowshop schedules. The purpose of this study is to design a more effective maintenance scheduling sequence in order to increase the amount of production with the most efficient use of time without having to stop production and be able to calculate the productivity of the machine it self. Partial Productivity (PP) analysis is used to determine the level of machine productivity by proving Partial Productivity (PP) after is better than Partial Productivity (PP) before. This research was conducted at PT. X, one of the leading national companies in producing cigarette products such as SKT cigarettes, SKM and SPM. As a result, this study has performed calculations using the Campbell Dudek Smith (CDS) algorithm and calculates the productivity of each iteration using Partial Productivity (PP). The recommended improvement of the engine maintenance scheduling sequence is by applying the scheduling sequence to the 5th iteration, J2-J4-J3-J1-J5.