Claim Missing Document
Check
Articles

Found 3 Documents
Search

Evaluasi Jaringan Listrik Pembangkit Listrik Tenaga Mikrohidro Cokro Tulung Kabupaten Klaten Maimun -; Suharyanto -; M.Isnaeni BS -
MEDIA ELEKTRIKA Vol 6, No 1 (2013): MEDIA ELEKTRIKA
Publisher : PSTE UNIMUS

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (1760.256 KB) | DOI: 10.26714/me.6.1.2013.%p

Abstract

Evaluasi yang dilakukan pada jaringan listrik PLTMh Cokro Tulung bertujuan untuk mengetahui karakteristik jaringan listrik tersebut, khususnya rugi-rugi daya, drop tegangan dan faktor daya sistem. Proses evaluasi dilakukan dengan membuat studi aliran daya pada jaringan listrik PLTMh Cokro Tulung dengan bantuan program ETAP 7.0. Studi aliran daya pada jaringan listrik tersebut dilakukan pada saat beban penuh kondisi tidak standar (tegangan sistem 230/400 V) dan kondisi standar (tegangan sistem 220/380 V). Dari hasil simulasi dapat disimpulkan bahwa rugi-rugi daya total (∆PT) yang timbul pada jaringan listrik PLTMh Cokro Tulung saat beban penuh sebesar 241,768 W atau 0,673 % dari daya total keseluruhan (37,54 kW) pada kondisi tidak standard dan 268,442 W atau 0,715 % dari daya total keseluruhan (37,58 kW) pada kondisi standar. Drop tegangan yang timbul pada Saluran Kabel Tegangan Rendah (SKTR) sebesar 1,07 V atau 0,268 % dari tegangan keja atau tegagan nominalnya (400 V) pada kondisi tidak standard dan 1,123 V atau 0,295 % dari tegangan nominalnya (380 V) pada kondisi standar. Drop tegangan yang timbul pada Saluran Udara Tegangan Rendah (SUTR) masing-masing sebesar 6,198 V atau 2,683 % dari tegangan nominalnya (230 V) pada kondisi tidak standar dan 6,994 V atau 3,193 % dari tegangan nominalnya (220 V) pada kondisi standar. Perbaikan faktor daya sampai dengan 90 % yang dilakukan pada jaringan listrik SKTR PLTMh Cokro Tulung dapat mengurangi rugi-rugi daya aktif total (∆PT) sebesar 12,017 % dan juga dapat mengurangi kebutuhan daya reaktif (Q) dan daya semu (S) masing-masing sebesar 35,66 % dan 11,27 %. Selain analisis aliran daya, juga dilakukan analisis-analisis lainnya. Dari hasil analisis tersebut dapat disimpulkan bahwa tegangan dan frekuensi sistem yang sedang beroperasi sekarang ini tidak standar dan kemampuan PLTMh Cokro Tulung sudah maksimal, dimana daya yang disalurkan kebeban-beban sudah mencapai 37,6 kW atau 80 % dari kapasitas tepasang 47,34 kW dengan efesiensi 79,8 % (motor induksi dioperasikan sebagai generator). Hasil analisis akan dijadikan data rujukan (rekomendasi) untuk perbaikan, sehingga jaringan listrik PLTMh Cokro Tulung dapat beroperasi dengan baik dan sesuai dengan standar yang berlaku di Indonesia (PUIL 2000).
Evaluasi Program Parenting Pada Pendidikan Anak Usia Dini (PAUD) Di Kota Mataram Maimun -
JTP - Jurnal Teknologi Pendidikan Vol 18 No 3 (2016): Jurnal Teknologi Pendidikan
Publisher : Lembaga Penelitian dan Pengabdian kepada Masyarakat, Universitas Negeri Jakarta

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (519.337 KB) | DOI: 10.21009/jtp.v18i3.5368

Abstract

The objective of this research was to understand comprehensively about the enforceability of parenting program on early childhood education (PAUD) in Mataram pre-schools. The study applies qualitative approach the focuses on evaluation in pre- shool education in Mataram. The data were collected through interviews, observation, documentation, and questionnaire. This Study shows that (1) the background of the parenting program implementation was lack of parents' supports of child education; (2) the implementation of parenting program in pre-shools has fulfilled the requirements laid down in the guideline book; (3) most of pre-school institutions have implemented parenting program in accordance with the technical guideline book; and (4) the majority of parents' understandings of child nutrition, treatment, upbringing, and protection have signivicantly increased upon the implementation of the program.
Analisis Unbalanced Load Flow pada Jaringan Listrik Pembangkit Listrik Tenaga Mikrohidro dengan Metode Injeksi Arus (Current Injection) Maimun -; Fauzan -; Radhiah -
Jurnal Teknologi Vol 16, No 1 (2016): April 2016
Publisher : Politeknik Negeri Lhokseumawe

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (439.513 KB) | DOI: 10.30811/teknologi.v16i1.320

Abstract

In this study the unbalanced load flow analysis with current injection method (current injection) is performed on the electrical grid amid lower that in the electricity grid micro hydro power (MHP) plant in order to determine the characteristics and efficiency of the electricity grid. The case studies carried out on the electrical grid  Cokro Tulung Klaten district. MHP Cokro Tulung the MHP stand alone (stand alone) airport beben-load is inductive beruapa AC electric motor 3 (three) phase that is used to pump water to the water-boom and loads such as lighting, also the burden of household appliances. Power flow studies in an unbalanced state or unbalaced load flow analysis with current injection method (current injection) is performed with the aid of a software program ETAP 7.0. Based on the results of the analysis result unbalaced load flow with the current injection method (current injection) has been done on the electrical grid MHP Cokro Tulung, it was found that the active power losses in total (ΔPT) arising on the power grid MHP full load current of 268.442 W or 0.714% of the total power (37.58 kW). Voltage drop occurs in sktr amounted to 1.123 V or 0.295% of its nominal voltage (380 V). Voltage drop occurs in SUTR respectively 6.994 V or 3.179% of its nominal voltage (220 V). So the power loss (ΔP) and the voltage drop (ΔV) arising on the power grid MHP Cokro Tulung is still small, so the efficiency of the electricity network is still quite good