Claim Missing Document
Check
Articles

Found 20 Documents
Search

METODE PENGENDALIAN PERSEDIAAN BAHAN BAKU CRUDE COCONUT OIL YANG OPTIMAL PADA PT. PSE Fadlillah, Siti Nur; Andreas, Andreas; Zahedi, Zahedi
Industrial and Systems Engineering Assessment Journal (INASEA) Vol 9, No 2 (2008): INASEA Vol. 09 No. 2
Publisher : Industrial and Systems Engineering Assessment Journal (INASEA)

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

The inventory system is one of the most important managerial functions, since vast majority of companies has large investment involved in this aspect. This also applies to PT. Palko Sari Eka that is big in the field of inventory planning and production control. PT. Palko Sari Eka, as one company in the oil refinery industry, strives to optimize the inventory of raw materials Crude Coconut Oil by trying to compare different methods of inventory control methods such as the EOQ (Economic Order Quantity, method of EOI (Economic Order Interval), Min-Max method. Crude Coconut Oil is one of the major raw material products, which require a good inventory system. From the results of research conducted, it turns out the character of stochastic demand data, it is also necessary to conduct simulations to obtain results closer to the actual conditions. The inventory criteria can be said to be optimal if the total annual cost is minimum. It is concluded that the best method is the Fixed Size Order Systems (EOQ) with an order of 2770 mT per order.
Integer Relaxation on Binary Quadratic Programming for Batching and Sequencing in Single Formulation to Minimize Total Actual Flow Times Criteria Zahedi, Zahedi
ComTech: Computer, Mathematics and Engineering Applications Vol 2, No 2 (2011): ComTech
Publisher : Bina Nusantara University

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.21512/comtech.v2i2.2857

Abstract

This paper examines batch scheduling problem that has batching and sequencing in single formulation for multiple-item case. The first step is to develop a model for single item single resource discussed in Zahedi (2008). The model determined batch sizes and their schedule simultaneously in single item case. This paper develops the model and algorithm for multiple-item case. The model functions to minimize total actual flow times. An algorithm for the model is developed using a relaxation of the binary constraints. The binary values for the decision variables are obtained from steps provided in algorithm. A numerical experience showing characteristics of this problem is presented. 
Integrating Preventive Maintenance Scheduling As Probability Machine Failure And Batch Production Scheduling Zahedi, Zahedi; Salim, Ashadi
ComTech: Computer, Mathematics and Engineering Applications Vol 7, No 2 (2016): ComTech
Publisher : Bina Nusantara University

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.21512/comtech.v7i2.2247

Abstract

This paper discusses integrated model of batch production scheduling and machine maintenance scheduling. Batch production scheduling uses minimize total actual flow time criteria and machine maintenance scheduling uses the probability of machine failure based on Weibull distribution. The model assumed no nonconforming parts in a planning horizon. The model shows an increase in the number of the batch (length of production run) up to a certain limit will minimize the total actual flow time. Meanwhile, an increase in the length of production run will implicate an increase in the number of PM. An example was given to show how the model and algorithm work.
Perancangan Program Aplikasi Market Basket Analysis untuk Mendukung Persediaan Barang dengan Metode Fuzzy C-Covering Zahedi, Zahedi; Chandra, Charies
ComTech: Computer, Mathematics and Engineering Applications Vol 3, No 1 (2012): ComTech
Publisher : Bina Nusantara University

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.21512/comtech.v3i1.2410

Abstract

Any difficulty in analyzing sales transaction data is often faced by a company due to the huge number of sales transactions and the limited tools to process the data. It results in losses for the company since it is difficult to estimate the goods supply for subsequent sales. In this paper a data mining application is designed to analyze sales data. Market Basket Analysis is a data mining application that aims to determine most purchased or used products at once by the consumer. The process of Market Basket Analysis is to analyze consumer buying habits by finding associations among products purchased by different customers. The method used in Market Basket Analysis is a method of Fuzzy c-Covering, which is one method to classify the elements of a universal set into partitions of fuzzy sets. This study found that the value of support and confidence is part of the Market Basket Analysis, computed using the Fuzzy c-Covering. The higher the limit, the more selected the analytical results obtained are.
Model Integrasi Penjadwalan Batch dan Penjadwalan Preventive Maintenance dengan Kriteria Minimisasi Biaya Simpan, Biaya Setup, Biaya Pm, serta Biaya Rework pada Mesin Stabil Zahedi, Zahedi
ComTech: Computer, Mathematics and Engineering Applications Vol 5, No 1 (2014): ComTech
Publisher : Bina Nusantara University

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.21512/comtech.v5i1.2634

Abstract

This study developed a model of batch scheduling involving the unavailability machine to minimize setup costs, cost of preventive maintenance and the cost of rework in a stable machine. This model is considered necessary in order to understand the effect of the unavailability machine for production runs and to understand the effect on the batch production schedule. The results of this study indicate that the first and last run will not give single batch. Given a hypothetical example of how the model and algorithm developed solve the problem instance. 
Perancangan Program Aplikasi Deteksi Iris Mata untuk Absensi Karyawan Menggunakan Metode Gabor Wavelet Zahedi, Zahedi; Janitra, Eka
ComTech: Computer, Mathematics and Engineering Applications Vol 2, No 1 (2011): ComTech
Publisher : Bina Nusantara University

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.21512/comtech.v2i1.2730

Abstract

To take the employees? absences in a company, a variety of invented tools or technologies are and already used, for example, attendance cards, fingerprints attendance tool, and attendance tool that uses facial recognition. Attendance tool with a facial recognition uses iris recognition of those employees. Iris code has many properties that hard to forge. Thus, the detection and iris recognition is one of the most secure and accurate for identification. 
Model Terintegrasi Penjadwalan Batch dan Pm dengan Kriteria Minimalisasi Biaya Simpan, Setup dan Pm pada Mesin dengan Increasing Failure Rate Zahedi, Zahedi
ComTech: Computer, Mathematics and Engineering Applications Vol 4, No 1 (2013): ComTech
Publisher : Bina Nusantara University

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.21512/comtech.v4i1.2690

Abstract

Development of today's manufacturing systems leads to the getting shorter in product life cycle, more variety of products, as well as increasing in consumer demand for quality and timeliness. Thus the accuracy and speed of decision-making within the manufacturing system becomes important. This paper proposes an integrated model of batch scheduling and preventive maintenance scheduling, in assumption no non-conforming parts to the criteria of minimizing the total saving cost, setup cost, preventive maintenance cost in minimizing the actual flow time on a machine with increasing failure rate. An example is provided to show how the model and algorithm work.
Stochastic Bus Dispatching Model untuk Optimalisasi Jumlah Bus Transjakarta Koridor 3 Zahedi, Zahedi; Wijaya, Fredy
ComTech: Computer, Mathematics and Engineering Applications Vol 2, No 2 (2011): ComTech
Publisher : Bina Nusantara University

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.21512/comtech.v2i2.2925

Abstract

The increasing number of road user causing traffic jam finds out a way, busway. However, in its implementation, the number of fleet available does not enough to take the passengers. It results in the an amassed of passengers at several bus stops. This leads to passenger dissatisfaction satisfaction which eventually causes Transjakarta users to reuse private cars. Definitely this situation may builds up traffic jams. Stochastic Bus Dispatching Model is used to simulate public transportation that operates regularly. 
Program Aplikasi Optimalisasi Perencanaan Produksi dengan Metode Goal Programming (Kasus CV. G) Zahedi, Zahedi; Putera, I Wayan Aditya Eka
ComTech: Computer, Mathematics and Engineering Applications Vol 1, No 1 (2010): ComTech
Publisher : Bina Nusantara University

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.21512/comtech.v1i1.2176

Abstract

Indonesia today is still a State agrarian. Thus agriculture in Indonesia always get more attention by the government. Many government programs are rolled out to support the agricultural development of Indonesia, and one of them is the fertilizer subsidy to farmers Indonesia. Fertilizer itself is very useful to nourish the soil and provide vitamins to the plants, thus increasing the amount of production generated. Therefore it is necessary fertilizer for agriculture in Indonesia. CV. G company is one of the companies that produce fertilizer. Fertilizer produced by this company is an organic fertilizer and inorganic fertilizer. Problems faced by these companies are in planning the production of fertilizer produced. Companies want to optimize the amount of production of each fertilizer, maximize revenues, minimize production costs, and simultaneously optimize the working hours of employees. To meet these objectives, this research created program package using goal programming methods. Goal programming method can provide an effective solution / equilibrium toward the goals set, and the calculation will be assisted by using the Simplex method that has been modified. This method is an extension of linear programming, linear programming which can only solve problems with a single goal while the goal programming to solve problems with multiple objectives.
Model Integrasi Penjadwalan Produksi Batch dan Penjadwalan Perawatan dengan Kendala Due Date ., Zahedi; Samadhi, TMA Ari; ., Suprayogi; Halim, Abdul Hakim
Jurnal Teknik Industri Vol 16, No 2 (2014): DECEMBER 2014
Publisher : Institute of Research and Community Outreach - Petra Christian University

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.9744/jti.16.2.73-82

Abstract

This paper discusses the integration model of batch production and preventive maintenance scheduling on a single machine producing an item to be delivered at a common due date. The machine is a deteriorating machine that requires preventive maintenance to ensure the availability of the machine at a desired service level. Decision variables of the model are the number of preventive maintenances, the schedule, length of production runs, as well as the number of batches, batch sizes and the production schedule of the resulting batches for each production run. The objective function of the model is to minimize the total cost consisting of inventory costs during parts processing, setup cost and cost of preventive maintenance. The results show three important points: First, the sequence of optimal batches always follows the SPT (short processing time). Second, variation of preventive maintenance unit cost does not influence the sequence of batches. Third, the first production run length from production starting time is smaller than the next production run length and this pattern continues until the due date. When in process inventory unit cost is increased, the pattern will continue until a specified cost limit, and beyond the limit the pattern will change to be the opposite pattern.