Al-Khani, M. Rizki
Unknown Affiliation

Published : 1 Documents Claim Missing Document
Claim Missing Document
Check
Articles

Found 1 Documents
Search

Analisis Kebutuhan Air Domestik Daerah Aliran Sungai Kampar (Studi Kasus: Pos AWLR Danau Bingkuang) Al-Khani, M. Rizki; Fauzi, Manyuk; Lilis, Yohanna
Jurnal Online Mahasiswa (JOM) Bidang Teknik dan Sains Vol 8 (2021): Edisi 2 Juli s/d Desember 2021
Publisher : Jurnal Online Mahasiswa (JOM) Bidang Teknik dan Sains

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

The Watershed Kampar AWLR Danau Bingkuang (DAS) is a watershed located in the Kampar Regency. The watershed Kampar AWLR Danau Bingkuang has an area of 669.99 km2. Water resource problems occur during the dry season, this watershed experiences drought, while in the rainy season the water discharge will increase and cause flooding. The population in the Kampar river basin has increased every year. This increase in population also increases the amount of domestic water demand. In 2010 domestic water demand was 25,157.6 m3/day, in 2019 it was 34,398.9 m3/day. Meanwhile, the projection for domestic water demand in the next 20 years is 54,935.11 m3/day. Keywords: Danau Bingkuang, Watershed, Domestic Water Needs