Claim Missing Document
Check
Articles

Found 5 Documents
Search
Journal : Jurnal%20Informasi%20dan%20Teknologi

Implementasi Metode Elimination Et ChoixTraduisant La Realite (ELECTRE) dalam Penentuan Pegawai Berprestasi Vera Delmayanti; Yuhandri Yunus; Julius Santony
Jurnal Informasi dan Teknologi 2020, Vol. 2, No. 1
Publisher : SEULANGA SYSTEM PUBLISHER

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.37034/jidt.v2i1.9

Abstract

The Kerinci Regency Cooperatives, Industry and Trade Office has a variety of employees whose competencies in their fields are for that purpose in improving an employee's performance by determining outstanding employees who aim to motivate and reward them for improving employee work performance. In determining this outstanding employee the data used are 3 samples of employee names as alternatives and some of the criteria on which decisions are made include Service Orientation, Integrity, Commitment, Discipline, and Cooperation. The results of the process of the ELECTRE method is to compare one employee with another employee and provide the results of priority value output in the form of assessment results or based on criteria that have been determined by the Office. The results of this process are recommended as outstanding employees at the Kerinci Regency Cooperatives, Industry and Trade Office.
Model Antrian Multi Channel Single Phase Berdasarkan Pola Kedatangan Pasien untuk Pengambilan Obat di Apotik Devi Yuliana; Julius Santony; Sumijan
Jurnal Informasi dan Teknologi 2019, Vol. 1, No. 4
Publisher : SEULANGA SYSTEM PUBLISHER

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.37034/jidt.v1i4.12

Abstract

The accumulation of queues of prospective patients also results in an inadequate waiting room, which occurs because there is no disciplinary pathway that can provide a form of registration service that is efficient and flexible with time to many entry points and many services so that patients do not have to queue long only to take medicine. The solution to handling the problem of the accumulation of prospective patients in RSI Ibnu Sina Padang is to implement a multi-channel queuing system - Single phase, where there will be more than one entry point to register to RSI Ibnu Sina Padang so that the patient arrival pattern is divided into several times and the path is adjusted with the needs of the patient's desired time and there is more than one stage of service at Ibnu Sina Hospital in Padang. The purpose of this study was to design a php application at the Ibnu Sina Hospital in Padang with the Multi Single Phase Method and find out the time spent by patients in the queue, then it is expected to be useful for the RSI Ibu Sina Padang.
Simulasi Monte Carlo untuk Memprediksi Hasil Ujian Nasional (Studi Kasus di SMKN 2 Pekanbaru) Yusmaity; Julius Santony; Yuhandri Yunus
Jurnal Informasi dan Teknologi 2019, Vol. 1, No. 4
Publisher : SEULANGA SYSTEM PUBLISHER

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.37034/jidt.v1i4.21

Abstract

Basically grades that do not meet graduation criteria are phenomenon for schools. Which can cause a lack of school quality. One such phenomenon is the National examination Score which is the value of determining graduation for students. Vocatonal High School (SMK) Negeri 2 Pekanbaru is a formal education unit as the organizer of the Teaching Learning Process (TLP), for student afterc ompleting education can go directly to employment or the industrial world and can continue their education. Where the test csores obtained by student are inseparable from the school graduation criteria.To deal whith probalytic situations like this we need a method for analyzing or predict likely in the future. One method that can be used is Monte Carlo Simulation. By using Monte Carlo Simulation to the national exam in this study is expected to holp to find out the acquition of student grades for the future. The csores are taken fom the national exam result obtained from the curriculumsection of the last 3 academic years, namely TP 2016/2017 to TP 2018/2019. This scores is simulationted whith PHP programming as a data implementation system. Simulation result from this studyobtained an accuracy level of 86,68%. By getting a greater degree of accuracy, this method is appropriate to be predict the National Exam Scores for the future.
Prediksi Pajak Mineral Non Logam dan Batuan dengan Metode Monte Carlo Julius Santony
Jurnal Informasi dan Teknologi 2019, Vol. 1, No. 4
Publisher : SEULANGA SYSTEM PUBLISHER

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.37034/jidt.v1i4.33

Abstract

Regional government in Indonesia annually sets a target for tax revenues of non-metallic minerals and rocks. Setting targets is very important as a guideline in preparing the current year's budget work plan. So far, the target of non-metal mineral and rock tax revenues has been prepared based on a joint agreement between the regional government and the regional legislature. The prediction of non-metal mineral and rock tax revenues using Monte Carlo simulation can be a solution to predict the next few years. This prediction uses data between 2009 - 2018 taken from the tax and retribution management body one of the districts in Indonesia. Testing the results of predictions is done by comparing the results of predictions with data from 2016 - 2018. The test results show that the average accuracy rate reaches 82.05%. So this study greatly helped the district government in setting the target for the acceptance of non-metal minerals and rock taxes.
Simulasi Penjadwalan Proyek Pembangunan Jembatan Gantung dengan Metode Monte Carlo Julius Santony
Jurnal Informasi dan Teknologi 2020, Vol. 2, No. 1
Publisher : SEULANGA SYSTEM PUBLISHER

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.37034/jidt.v2i1.34

Abstract

The scheduling of a suspension bridge construction project is very influential in determining the success of construction which has risks and uncertainties in the construction of a suspension bridge. So we need a suspension bridge project scheduling to predict the work schedule for each suspension bridge construction activity. To overcome all the risks and uncertainties in the construction of a suspension bridge, a Monte Carlo method simulation is needed to process 10 activities in a suspension bridge construction project. The accuracy rate using Monte Carlo simulation is 93.99% for predictions for 2017, 2018 for 98.77% and 86.75% for 2019. So this Monte Carlo simulation can be used in predicting the scheduling of a suspension bridge construction project.