Claim Missing Document
Check
Articles

Found 2 Documents
Search
Journal : Jurnal Optimasi Sistem Industri

Sistem Pengukuran Kinerja Supply Chain Management Pada Proyek Konstruksi Demi Ramadian; Elita Amrina
Jurnal Optimasi Sistem Industri Vol. 18 No. 1 (2019): Published in May 2019
Publisher : The Industrial Engineering Department of Engineering Faculty at Universitas Andalas

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (771.336 KB) | DOI: 10.25077/josi.v18.n1.p75-85.2019

Abstract

Construction project implementation process is often found inefficiency and problems at every stage of the construction process. Inefficiencies are caused because construction projects have high levels of fragmentation. The high level of fragmentation cannot be separated from the complexity and many work items on construction projects. To reduce the problem of inefficiencies in the implementation of construction projects required good supply chain management or better known as supply chain management (SCM) on construction projects. Therefore it is necessary to study the management of SCM in the construction project to reduce the inefficiency that occurred. SCM management of construction projects is done by designing SCM performance measurement systems in construction projects. This performance measurement system produces indicators that are combined with the Supply Chain Operation Reference (SCOR) method. So it helps in performing SCM performance measurement on construction projects. From the design results, obtained 14 SCM performance indicators on construction projects. The performance indicators are then used to perform SCM performance measurement of cement plant construction projects. From the measurement results obtained SCM performance value of 41 from a scale of 100. This shows the performance of SCM on construction projects for the construction of the cement plant is at a marginal level.
Perancangan Standar Penilaian Kinerja Pemeliharaan Lampu Jalan Berdasarkan Key Performance Indicators (KPI’s): Studi Kasus di Kota Padang Nilda Tri Putri; Insannul Kamil; Demi Ramadian
Jurnal Optimasi Sistem Industri Vol. 11 No. 2 (2012): Published in 1st October 2012
Publisher : The Industrial Engineering Department of Engineering Faculty at Universitas Andalas

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (703.674 KB) | DOI: 10.25077/josi.v11.n2.p225-234.2012

Abstract

Sistem transportasi yang baik dan memadai merupakan hal penting yang harus diperhatikan untuk memenuhi kebutuhan pelayanan terhadap keperluan masyarakat dalam menjalankan aktivitasnya setiap hari. Aktivitas transportasi tidak hanya berlangsung pada siang hari, namun juga dilakukan pada malam hari sehingga keberadaan lampu penerangan jalan sangat penting untuk menerangi jalan dan melancarkan kegiatan transportasi tersebut. Saat ini kondisi lampu jalan di Kota Padang banyak yang mengalami kerusakan. Penyebab utama kerusakan lampu jalan adalah tegangan, yaitu beban puncak yang terjadi mulai dari pukul 18.00-23.00 WIB. Berdasarkan hal tersebut, penelitian ini menggunakan Key Performance Indicator (KPI) untuk menghasilkan standar penilaian kinerja dalam melakukan penilaian terhadap pemeliharaan lampu jalan yang ada di kota Padang. Perancangan dimulai dengan mengidentifikasi KPI yang didapatkan dari studi literatur. KPI yang telah didapatkan divalidasi kepada stakeholder untuk mendapatkan KPI yang cocok untuk diterapkan di kota Padang. Setelah itu dilakukan pembobotan KPI melalui perbamdingan berpasangan dengan menggunakan metode AHP.Keywords: penilaian, kinerja, key performance indicators, kinerja pemeliharaan lampu jalan