This Author published in this journals
All Journal Foristek
Claim Missing Document
Check
Articles

Found 1 Documents
Search

PROYEKSI KEBUTUHAN DAYA LISTRIK DI PROPINSI SULAWESI TENGAH TAHUN 2007-2020 Hamdany, Tadjuddin
FORISTEK : Forum Teknik Elektro dan Teknologi Informasi Vol 1, No 1 (2011)
Publisher : FORISTEK : Forum Teknik Elektro dan Teknologi Informasi

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (67.188 KB)

Abstract

The study is devoted to  forecast electrical energy demand from 2007 to 2020,  so lack of energy  can be anticipated. The study was conducted in Palu, province of Central Sulawesi. The data is analyzed using linear regression. The result showed that the increasing of load in 2007 is very significant with peak load reached 120,6 MW. In 2020 the peak load reached 196.2 MW. Keywords : electrical energy, load growth, and load forcecasting.