Claim Missing Document
Check
Articles

Found 3 Documents
Search

ANALISIS FAKTOR-FAKTOR PENYEBAB TERJADINYA KETERLAMBATAN PENYELESAIAN PEKERJAAN FISIK PADA PROYEK PNPM MANDIRI DI KOTA AMBON Leuhery, Lenora
Jurnal Teknik Sipil Vol 3, No 1 (2014): JURNAL TEKNIK SIPIL
Publisher : Jurnal Teknik Sipil

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (197.103 KB)

Abstract

National Program for Community Empowerment (PNPM Mandiri) that have been implemented in the city of Ambon since 2007, is believed to have contributed greatly to the city government in reducing poverty and improving social welfare. But one of the problems that a lot happening in the field is the delay in the completion of physical work on PNPM Urban city of Ambon, which is not optimal impact on the work and impeding the implementation of PNPM Mandiri, especially in terms of physical work completion PNPM Mandiri. This study aims to analyze the factors that cause delays in the completion of the physical work on the project in the city of Ambon PNPM Mandiri. The analysis was performed on the questionnaire respondents were represented from all parties involved in the project, namely PNPM employer / government (the owner), executing the work / community directly (KSM) and the executive supervisor jobs / employment coordinator (BKM). Performed with SPSS data processing and concluded that the factors that influence the occurrence of delays in completion of the work is the physical aspect Inspection Systems, Control and Evaluation of Work (X5), reporting on the indicators work slow and incomplete, with the percentage of agreement value of the intensity scale and the scale of determine respectively are: intensity scale (BKM 93%; KSM 97%; owners 95%) and determine the scale (BKM 96%; KSM 98%, owner 96%).
ANALISIS FAKTOR-FAKTOR PENYEBAB TERJADINYA KETERLAMBATAN PENYELESAIAN PEKERJAAN FISIK PADA PROYEK PNPM MANDIRI DI KOTA AMBON Leuhery, Lenora
Jurnal Teknik Sipil Vol 3, No 1 (2014): JURNAL TEKNIK SIPIL
Publisher : Jurnal Teknik Sipil

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (197.103 KB)

Abstract

National Program for Community Empowerment (PNPM Mandiri) that have been implemented in the city of Ambon since 2007, is believed to have contributed greatly to the city government in reducing poverty and improving social welfare. But one of the problems that a lot happening in the field is the delay in the completion of physical work on PNPM Urban city of Ambon, which is not optimal impact on the work and impeding the implementation of PNPM Mandiri, especially in terms of physical work completion PNPM Mandiri. This study aims to analyze the factors that cause delays in the completion of the physical work on the project in the city of Ambon PNPM Mandiri. The analysis was performed on the questionnaire respondents were represented from all parties involved in the project, namely PNPM employer / government (the owner), executing the work / community directly (KSM) and the executive supervisor jobs / employment coordinator (BKM). Performed with SPSS data processing and concluded that the factors that influence the occurrence of delays in completion of the work is the physical aspect Inspection Systems, Control and Evaluation of Work (X5), reporting on the indicators work slow and incomplete, with the percentage of agreement value of the intensity scale and the scale of determine respectively are: intensity scale (BKM 93%; KSM 97%; owners 95%) and determine the scale (BKM 96%; KSM 98%, owner 96%).
PERAN POLITEKNIK NEGERI AMBON DALAM MENUNJANG PENGEMBANGAN NEGERI OMA MENUJU DESA WISATA Latuconsina, Rina; Leuhery, Lenora; Saptenno, Sammy; Manuputty, Evandro; Pattiasina, Nanse Henny; Jamlaay, Marselin
Conference on Innovation and Application of Science and Technology (CIASTECH) CIASTECH 2021 "Kesiapan Indonesia Dalam Menghadapi Krisis Energi Global"
Publisher : Universitas Widyagama Malang

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Provinsi Maluku merupakan salah satu provinsi yang terdiri dari gugusan pulau kecil, Negeri Oma merupakan salah satu negeri adat yang berada di Pulau Haruku Kabupaten Maluku Tengah. Negeri Oma sendiri memiliki potensi alam yang melimpah baik di bidang kelautan ataupun perkebunan, selain itu Negeri Oma juga menyimpan pesona alam yang indah dan beberapa lokasi wisata yang alami diantaranya : permandian kolam Air Asol, Batu Kapal serta sumber air panas. Dari potensi alam yang ada dan ekonomi kreatif belum tersentuh secara optimal baik dari segi pengolahan, promosi maupun pemasaran. Pusat Penelitian dan Pengabdian Masyarakat Politeknik Negeri Ambon menjadikan Negeri Oma sebagai Desa Binaan pada tahun 2021. P3M dalam hal ini yang menjembatani para peneliti dan pengabdi untuk berkontribusi dalam pembangunan Negeri Oma. Tujuannya adalah untuk meningkatkan perekonomin masyarakat dan menciptakan kawasan Negeri Oma sebagai desa Wisata yang dinteggrasikan dan disinergikan dengan berbagai program. Kegiatan yang dilakukan adalah memperkenalkan Teknologi Tepat Guna dalam berbagai bidang diantaranya pembuatan Webbsite, perancangan alat pengering otomatis, pembuatan booth untuk tempat jualan, pembuatan tempat cuci tangan semi otomatis, pengembangan SDM melalui berbagai macam pelatihan kepada masyarakat yang berumur produktif serta pengembangan sarana dan prasarana pendukung lokasi wisata. Hasil Kegiatan dilaksanakan di Negeri Oma pada tanggal 11 September 2021 pada Kantor Desa Negeri Oma serta penyerahan alat-alat prasarana pendukung lokasi wisata langsung pada lokasi masing-masing. Dengan adanya pengembangan Pariwisata di negeri Oma, maka akan berdampak terhadap pendapatan masyarakat negeri Oma.