Teguh Taruna Utama
UIN Sunan Ampel Surabaya

Published : 2 Documents Claim Missing Document
Claim Missing Document
Check
Articles

Found 2 Documents
Search
Journal : Al-Ard: Jurnal Teknik Lingkungan

Sistem Penyediaan Air Minum Kabupaten Manggarai dengan Sistem Zonasi di Desa Bangka Kenda Teguh Taruna Utama
Al-Ard: Jurnal Teknik Lingkungan Vol. 5 No. 2 (2020): Maret
Publisher : Department of Environmental engineering, Faculty of Science and Technology, Islamic State University Sunan Ampel Surabaya

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (1359.035 KB) | DOI: 10.29080/alard.v5i2.871

Abstract

Water resources in Manggarai Regency are mostly supplied from springs. One of the villages in Manggarai Regency that uses springs is Bangka Kenda Village. Bangka Kenda Village requires drinking water of 10.41 Liters/second. This need for water is the result of drinking water projections in Manggarai Regency in 2037. Pressure values obtained from the results of manual calculations range from 5.63 meters to 93.82 meters. While the simulation results using the EPANET program, the pressure value is at 5.69 meters up to 93.84. The value of the manual calculation pressure with EPANET is not much different so that the pipe diameter selection is appropriate according to plan. The selected pipe is HDPE. The selected pipe diameter is 1.5 "; 2 "; 3 "; 4 and 5 ", respectively. The pipe has a water pressure resistance of 12.5 bar.
Perencanaan Instalasi Pengolahan Air Limbah (IPAL) Domestik Central Processing Plant (CPP) Gundih PT. Pertamina EP Asset 4 Cepu Field Aviandini Galih Hanuranti; Sulistiya Nengse; Arqowi Pribadi; Dyah Ratri Nurmaningsih; Teguh Taruna Utama
Al-Ard: Jurnal Teknik Lingkungan Vol. 6 No. 1 (2020): September
Publisher : Department of Environmental engineering, Faculty of Science and Technology, Islamic State University Sunan Ampel Surabaya

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.29080/alard.v6i1.983

Abstract

Central Processing Plant (CPP) Gundih is one of the production facilities of natural gas processing Blok Gundih PT. Pertamina EP Asset 4 Cepu Field from Kedungtuban, Randublatung, and Kedunglusi structure. Main activities of CPP Gundih consist production and operational activities. Production activities produces produced water. The water treatment of produced water processed by a production system and process. Operational activities of CPP Gundih produces wastewater from domestic activities (office) by 161 workers/day. The quantity of domestic wastewater are 21,896 m3/day, and the quality of Biological Oxygen Demand (BOD), Chemical Oxygen Demand (COD), and Total Suspended Solid (TSS) are 9,8 mg/L, 100 mg/L, and 33 mg/L. Grey water and black water currently accommodated in septic tanks. Runoff from the septic tank flowed through drainage without treatment. Therefore, sewerage treatment plant planned with anaerobic-aerobic biofilter. The cost needed for the construction are Rp. 13.590.441,80-.