Claim Missing Document
Check
Articles

Found 3 Documents
Search

PREDIKSI KEBUTUHAN AIR BERSIH PDAM PUSAT PULANG PISAU DAN UNIT DESA MANTAREN I TAHUN 2029 Andri Priyanto; Allan Restu Jaya; Hendro Suyanto
Spektrum Sipil Vol 8 No 2 (2021): SPEKTRUM SIPIL
Publisher : Jurusan Teknik Sipil Fakultas Teknik Universitas Mataram

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.29303/spektrum.v8i2.220

Abstract

PDAM Kota Pulang Pisau merupakan Badan Usaha Milik Daerah di Kota Pulang Pisau yang menyediakan jasa pelayanan dan pendistribusian air bersih ke konsumen di wilayahnya. Penelitian bertujuan untuk mengetahui kemampuan layanan PDAM Pulang Pisau dan Unit Desa Mantaren I terhadap jumlah penduduk Kota Pulang Pisau pada tahun 2029. Penelitian diharapkan dapat membantu PDAM Kota Pulang Pisau mengetahui besar kebutuhan air bersih serta prediksi jumlah penduduk pada tahun 2020 sampai tahun 2029. Penelitian ini bersifat studi kasus dengan melakukan analisis data. Pengolahan data menggunakan metode aritmatik. Data-data yang digunakan adalah data jumlah penduduk serta data produksi air PDAM Kota Pulang Pisau dari tahun 2020 sampai dengan tahun 2029. Tahapan penelitian meliputi proyeksi penambahan jumlah penduduk, dan analisis kebutuhan air serta kemampuan layanan air bersih PDAM Kota Pulang Pisau tahun 2020 sampai dengan tahun 2029. Hasil penelitian menunjukkan bahwa kebutuhan air yang diperlukan PDAM Kota Pulang Pisau pada tahun 2029 sebesar 26,630 lt/dt. Tingkat pelayanan penduduk dari tahun 2020 sampai dengan tahun 2029 mengalami peningkatan, akan tetapi jika ditinjau dari aspek kebutuhan air bersih yang harus dipenuhi oleh PDAM kota Pulang Pisau masih mencukupi setiap tahunnya, karena kapasitas IPA saat ini 60 lt/dt dan kapasitas intake 70 l/dt.
Inovasi Dan Desain Turbin Hidrokinetik Darrieus Berdasarkan Bentuk Distribusi Kecepatan Aliran Citra Sari Wardani; Dwi Anung Nindito; Allan Restu Jaya
Media Ilmiah Teknik Sipil Vol 9 No 1 (2020): Media Ilmiah Teknik Sipil
Publisher : ​Institute for Researches and Community Services Universitas Muhammadiyah Palangkaraya

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33084/mits.v9i1.1771

Abstract

Darrieus turbine use blades with a hydrofoil shape, so the rotational ability is influenced by lift force. This caused the initial rotation capability to be very low when compared to the drag turbine type. The flow velocity distribution in the vertical direction indicates a small cross-sectional speed of flow approaching the base of the flow channel, then rising towards the surface. Darrieus Spinning Top turbine is the result of innovation and design based on the concept of flow velocity distribution. Darrieus Spinning Top turbine’s blade shapes are circular-arc and straight-line, adjusting flow velocity distribution of 0.2H, 0.6H and 0.8H from the top of the turbine. In this study, a performance comparison was conducted between Darrieus turbine and Spinning Top Darrieus. Darrieus turbines produce RPM and torque values of 54.59 – 67.90 and 0.014 – 0.029 Nm, respectively. Darrieus Spinning Top turbines produce RPM values and torque of 69.24 – 82.02 and 0.012 – 0.020 Nm respectively. RPM improvements in Darrieus Spinning Top turbine design increase the influence of lift force (increased λ value). This results in a high lap rate, but requires a high self starting to perform the turbine rotation cycle.
Perencanaan Instalasi Pengolahan Air Limbah (IPAL) UPT Laboratorium Kesehatan dan Kalibrasi Dinas Kesehatan Provinsi Kalimantan Tengah Muhammad Iqbal Maulana Rusmadi; Hendro Suyanto; Allan Restu Jaya
PUBLIKASI RISET ORIENTASI TEKNIK SIPIL (PROTEKSI) Vol 5 No 1 (2023): Vol. 5 No. 1 (2023)
Publisher : Universitas Negeri Surabaya

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.26740/proteksi.v5n1.p7-12

Abstract

Laboratorium merupakan wadah untuk membuktikan sesuatu yang harus dilakukan melalui suatu percobaan, yang menghasilkan limbah cair maupun limbah padat yang seharusnya diolah di Instalasi Pengolahan Air Limbah (IPAL) terlebih dahulu sebelum dibuang kembali. Limbah yang tidak tertangani dengan baik akan mencemari lingkungan di sekitar Laboratorium tersebut. Laboratorium ini sudah memiliki Instalasi Pengolahan Air Limbah (IPAL) yang dibangun tahun 2021, namun pengolahan tidak optimal dikarenakan aliran debit air limbah di laborarotium terlalu rendah sehingga perlunya perencanaan ulang pada IPAL. Tahapan perencanaan ini meliputi pada analisis perhitungan air bersih, perhitungan air limbah yang dikeluarkan, perhitungan desain kapasitas Instalasi Pengolahan Air Limbah (IPAL), dan perhitungan rencana anggaran biaya. Dari hasil perencanaan didapat kapasitas Instalasi Pengolahan Air Limbah (IPAL) sebesar 3 m3/hari, dilakukan perbandingan dengan kondisi eksisting, sedangkan untuk biaya yang telah direncanakan sebesar Rp.88.680.000,00 dengan perencanaan ini diharapkan hasil olahan dapat memenuhi standar baku mutu yang telah ditetapkan.