Perencanaan Geometrik Jalan Menggunakan Autocad Civil 3D Studi Kasus Jalan Duku – Sicincin (Sta 0+000 – Sta 2+700) Provinsi Sumatera Barat Elsa Eka Putri; M Luthvan Syaftria Nanda; Muhammad Aminsyah
Jurnal Rekayasa Sipil (JRS-Unand) Vol 17, No 2 (2021)
Publisher : Civil Engineering Departement, Andalas University

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.25077/jrs.17.2.140-152.2021

Abstract

Perkembangan teknologi yang pesat, menghendaki setiap perencanaan dan perhitungan dilakukan dengan cepat dan akurat. Perencanaan Geometrik Jalan adalah merencanakan trase jalan lengkap dengan alinemennya. Ada beberapa standar dalam perencanaan geometrik jalan diantaranya AASHTO dan Bina Marga. Penelitian ini merencanakan geometrik jalan dengan menggunakan AutoCAD Civil 3D dan hasilnya akan dibandingkan dengan perencanaan manual yang mengacu kepada Bina Marga. Lokasi yang dipilih untuk perencanaan adalah Jalan Duku Sicincin Sta 0+000 – Sta 2+700. Aplikasi Civil 3D menggunakan standar AASHTO dan perencanaan manual menggunakan standar Bina Marga. Kriteria perencanaannya sama untuk kedua metode. Dari hasil perhitungan didapatkan 4 tikungan SCS dan perbedaan hasil antara Civil 3D dengan perhitungan manual sebesar <0,3 m. Penggambaran superelevasi juga terdapat perbedaan pada jarak antara TS – SC (Civil 3D) yang merupakan panjang run out + run off (panjang run off =  Ls desain) sedangkan pada perhitungan manual jarak antara TS – SC pada diagram adalah jarak Ls desain saja. Pada perencanaan alinemen vertikal diperoleh 4 lengkung vertikal yang terdiri dari 2 lengkung cembung dan 2 lengkung cekung dimana hasil keluaran perhitungan Civil 3D dan perhitungan manual hasilnya sama. Dari hasil penelitian ini, AutoCAD Civil 3D dinilai efektif dalam perencanaan geometrik jalan karena membantu proses merencanakan penggambaran secara bersamaan sehingga proses perencanaan akan lebih mudah dan cepat. Hanya terdapat sedikit perbedaan hasil pada parameter tikungan SCS yaitu superelevasi dengan jari-jari 550 m adalah 5,40% pada perhitungan Civil 3D sedangkan pada perencanaan manual adalah 5,55%. Hal ini bisa dilakukan penyesuaian standarnya di bagian desain kriteria ‘xml’ pada Civil 3D, sehingga hasilnya akan sama dengan perhitungan dengan standar Bina Marga.
Evaluasi dan Perencanaan Lampu Lalu Lintas Pada Simpang Jalan Syekh Umar Khalil-Bypass Kota Padang Titi Kurniati; Abdul Latif; Elsa Eka Putri
Jurnal Rekayasa Sipil (JRS-Unand) Vol 16, No 1 (2020)
Publisher : Civil Engineering Departement, Andalas University

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (498.043 KB) | DOI: 10.25077/jrs.16.1.49-64.2020

Abstract

Kemacetan yang sering terjadi pada simpang Jalan Syekh Umar Khalil-Bypass Kota Padang menimbulkan terjadinya antrian dan tundaan pada salah satu simpang yang sangat panjang. Maka dilakukanlah evaluasi dan perencanaan lampu lalu lintas untuk mangatasi permasalahan yang terjadi. Survei dilakukan dengan merekam lalu lintas kendaraan dengan menggunakan kamera yang ditempatkan pada persimpangan. Pengambilan data dilaksanakan selama enam jam setiap hari selama dua hari kerja, yaitu 2 jam pagi hari (pukul 07.00 – 09.00), 2 jam siang hari (pukul 12.00 – 14.00), dan 2 jam sore hari (pukul 16.00 – 18.00) pada hari Senin dan Kamis. Kemudian tiap jalur dibagi menjadi beberapa sektor sesuai dengan arah jalan per 15 menit. Dari data per 15 menit tersebut direkap dalam 1 jam, lalu diambil jam puncaknya untuk dianalisa. Perhitungan parameter perencanaan berdasarkan MKJI 1997. Hasil yang didapat pada kondisi eksisting untuk nilai derajat kejenuhan masing-masing pendekat Utara, Selatan dan Timur telah melewati batas jenuh (DS>0,75), sehingga diusulkan 4 jenis perancangan untuk meningkatkan kinerja simpang. Alternatif 1, pelebaran jalur pendekat, alternatif 2, pengaturan simpang menjadi 2 fase, alternatif 3, pengaturan simpang 2 fase dan pelebaran sedangkan alternatif 4 adalah dengan menutup simpang. Hasil perhitungan menunjukan, perencanaan optimum adalah alternatif 3 dan 4.
KAJIAN PENERAPAN ZONA PENGENDALIAN LALU LINTAS PADA PELAKSANAAN PEKERJAAN JALAN Rio Andika; Purnawan Purnawan; Elsa Eka Putri
Rang Teknik Journal Vol 3, No 2 (2020): Vol. 3 No. 2 Juni 2020
Publisher : Fakultas Teknik Universitas Muhammadiyah Sumatera Barat

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (1580.919 KB) | DOI: 10.31869/rtj.v3i2.1760

Abstract

Road works are almost close with moving traffic and potentially causing traffic disruption, congestion, delay, frustration, and more can cause collisions that would injure or kill road users and road workers. In order to remain resilient, the road worker must apply the zone concept on road works. This study aims to evaluate the application of Safety Technical Guidance on Road Work Location conducted by PT. Citra Muda Noer Bersaudara on Road Reconstruction of Junction (Koto Baru) - Jambi Border segment. So do a direct observation of the road work zone implemented by the contractor and compare it with the applicability in the guide. The implementation of the road work zone carried out by the contractor on the work package under review still lacks. In the implementation, the lack of which always occurs in every job implementation is the absence of a termination zone in all types of work, the transition zone is only applied to asphalt work, the early warning zone is only applied to road concrete work, asphalt overlay work and road shoulder work. Speed survey results show that the implementation of road work zone applied by the contractor can reduce the speed of the vehicle.
PERENCANAAN ULANG GEOMETRIK DAN PERKERASAN JALAN PADA RUAS JALAN BATAS KOTA PADANG – KOTA PAINAN KM 70+000 - KM 72+700 Elsa Eka Putri; Muhammad Iqbal
Rang Teknik Journal Vol 5, No 1 (2022): Vol. 5 No. 1 Januari 2022
Publisher : Fakultas Teknik Universitas Muhammadiyah Sumatera Barat

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (3440.64 KB) | DOI: 10.31869/rtj.v5i1.2813

Abstract

Software bisa membantu pekerjaan menjadi mudah dan cepat. Autodesk Infraworks adalah salah satu software yang dapat mempermudah perencanaan jalan dan merupakan software yang cukup banyak digunakan oleh negara maju. Perencanaan ulang geometrik jalan meliputi perhitungan tebal perkerasan serta anggaran biaya dengan studi kasus pada jalan batas Kota Padang - Kota Painan KM 70+000 - KM 72+700 yang berlokasi di Sago Salido, IV Jurai, Kabupaten Pesisir Selatan, Provinsi Sumatera Barat. Jalan batas Kota Padang - Kota Painan ini merupakan jalur Lintas Sumatra yang menghubungkan antara Provinsi Sumatera Barat dengan Provinsi Bengkulu. Tujuan dari penelitian ini adalah merencanakan ulang geometrik jalan, tebal perkerasan jalan, dan rencana anggaran biaya berdasarkan standar dan peraturan yang berlaku di Indonesia, sehingga dapat bermanfaat sebagai referensi dalam perencanaan jalan dengan menggunakan software Autodesk Infraworks yang disesuaikan dengan peraturan yang berlaku di Indonesia. Perencanaan geometrik jalan menggunakan aplikasi Autodesk infraworks didapatkan hasil untuk jalan kolektor kelas III A ini, sepanjang 2706,38 m yang memiliki 8 tikungan dan 6 lengkung vertikal serta volume galian sebesar 21550,44 m3 dan volume timbunan sebesar 21519,47 m3. Perhitungan tebal perkerasan dilakukan berdasarkan Manual Desain Perkerasan (MDP) tahun 2017 dengan menggunakan struktur perkerasan kaku sehingga didapatkan struktur perkerasan dengan hasil pelat beton dengan tebal 40 mm, lapis fondasi LMC dengan tebal 60 mm dan lapis drainase dengan tebal 145 mm. Dari perencanaan jalan ini diperoleh rencana anggaran biaya sebesar Rp. 43.447.698.000,00 (empat puluh tiga milyar empat ratus empat puluh tujuh juta enam ratus sembilan puluh delapan ribu rupiah). Sehingga dapat disimpulkan aplikasi Autodesk Infraworks dinilai dapat mempermudah pelaksanaan dan penggambaran dalam pekerjaan serta menghemat waktu, dengan standar AASHTO (American Association of State Highway and Transportation Officials) tahun 2011 dengan perbedaan hasil perhitungan  kecil dari 1%.
Classification of Bus Driving Behaviour In Universiti Malaysia Sabah Campus Elsa Eka Putri; Lillian Gungat; Dewi Nur Atieqah Binti Baharun Alam
Sainstek (e-Journal) Vol. 9 No. 2 (2021)
Publisher : Sekolah Tinggi Teknologi Pekanbaru

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Driving behaviour has been studied by numerous researchers for the past few years. It includes the instantaneous driving behaviour observations and the drivers speed which are said to be influenced by many factors, such as the demographic measure of the drivers, environmental, passenger effect, and road characteristics. This paper describes the recent analysis and classification of driver behaviour in actual driving scenarios among the bus drivers in Universiti Malaysia Sabah (UMS) Main Campus, Kota Kinabalu. This research focussed on determining the riderships of bus in UMS campus, to investigate the differences of instantaneous driving behaviours of bus drivers during the acceleration phase when leaving bus stops, and to poduce the classification of the bus driving behaviour in UMS based on the driver’s accelerations. In order to achieve the objective of this study, observations were made for determining the riderships and the differences in instantaneous bus driving behaviour several times for each bus stops. For drivers speed and accelerations, a mobile applications called Speedometer GPS was used to obtain the data. Interview was conducted to a total number of 10 respondents to obtain their demographic measure. The results obtained shows the ridership of UMS bus is the highest in the afternoon peak. The instantaneous driving behaviour produce the head movement as the highest percentage during peak hour, and inattentive behaviour as the highest during the off peak hour. The bus drivers in UMS were classified as Aggressive and Calm Behaviour Category.
Effectiveness Of Portland Cement Type 1 In Stabilizing Soft Clay Soil As Subgrade For Road Construction Dedi Iskandar; Elsa Eka Putri; Abdul Hakam; Arniza Fitri
Jurnal Rekayasa Sipil Vol 19, No 1 (2023)
Publisher : Civil Engineering Departement, Andalas University

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.25077/jrs.19.1.44-53.2023

Abstract

Sawah Lunto – Talawi road segment (STA 139 + 700 m) in Sawah Lunto city, West Sumatera province has sustained major damages and been the scene of several accidents since the past few years. The degression of soft clay subgrade, which has a limited bearing capacity and makes it structurally impractical to sustain road construction, was discovered to be the source of these damages. As a recent option for enhancing soil qualities, soil stabilization by employing a variety of pozzolanic and industrial materials has gained popularity. The objective of this study is to investigate the effectiveness of Portland cement type 1 as stabilizing material in improving the soil properties and carrying capacity requirements for soft clay soil used as subgrade in road construction. To accomplish the objectives of this study, a laboratory testing procedure was implemented. Unconfined Compressive Strength (USC) values on natural soil and treated soil with Portland cement type 1 admixture were measured and compared during laboratory experiments. Soft clay soils were stabilized with varying percentages of Portland cement type 1 with the proportions of approximately 1%, 2%, 3%, 4%, 5%, 6%, 7%, and 10% by dry weight of soil during a 7-days curing period. Laboratory testing were performed in compliance with Indonesian National Standard (SNI): SNI 3420-2008 for testing Unconfined Compressive Strength. According to the results of laboratory testing, the UCS values increased roughly from 0.634 kg/cm2 (undisturbed natural soil) to 2.832 kg/cm2 (treated soil) by adding 3% of Portland cement type 1, and up to 8,024 kg/cm2 (treated soil) by adding 10% of Portland cement type 1. Based on the findings, it can be demonstrated that Portland cement type 1 can enhance clay soil's properties used as a subgrade for road construction, can create more stable road conditions, and can ultimately meet the technical feasibility requirements for the subgrade carrying capacity, particularly at the Sawah Lunto - Talawi road segment (STA 139 + 700 m).
Penggunaan Kapur Palupuh dan Kapur Rao-Rao pada Asphalt Concrete - Wearing Course Elsa Eka Putri; Reza Maulana Arasy; Parasian Oscar Martua
Jurnal Ilmiah Rekayasa Sipil Vol 20 No 2 (2023): Oktober 2023
Publisher : Pusat Penelitian dan Pengembangan Masyarakat (P3M), Politeknik Negeri Padang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.30630/jirs.v20i2.1085

Abstract

Indonesia has the many area of the lime production including in the West Sumatra Province. The use of lime as a filler in asphalt mixtures is expected to improve the performance of asphalt mixtures. There are two types of lime used, namely Palupuh and Rao-Rao limestone. This study aims to see the effect of using these 2 types of lime as a filler on Asphalt Concrete-Wearing Course (AC-WC) pavements mixture. The bitumen used is Pen 60/70. Marshall testing was carried out to see the characteristics of the pavement mixture. From Marshall's testing on a pavement without lime, has an optimum asphalt content of 6.015%. Furthermore, with a variation of lime 0%, 25%, 50%, 75%, 100% by weight of filler for both types of lime gave an optimum lime content yield of 50% with an increase in stability of 12.024% and flow of 19.375% for Palupuh lime. Meanwhile, the use of Rao-Rao lime cannot improve the Marshall stability of the AC-WC pavement mixture
Effects of Filtration Using Soil and Fibre Mediums in Improving The Quality of Stormwater Jodin Makinda; Elsa Eka Putri; Lillian Gungat; Wong Hooi Pin
Jurnal Bangunan: Konstruksi & Desain Vol. 1 No. 1 (2023): Mei 2023
Publisher : Universitas Andalas

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.25077/jbkd.1.1.11-20.2023

Abstract

Water shortage problems occurred when insufficient quantities or only poor quality of water available for consumption . In some places, while fresh water is abundantly available for domestic use, high demand at industrial site and agricultural area requires the need to investigated alternative method of treatment for non-domestic water supply. In this study, effects of treatment unit using Odec and Sulaman soils, fibre and fibre-soil combinations were investigated towards their ability to filtrate and improve the quality of stormwaters collected from SST Lake, Likas River and Odec Sea. For comparison, treatment was also conducted for soy bean water. Stormwater quality tested include the chemical oxygen demand (COD), pH, turbidity and suspended solid. It was found that Sulaman soil medium yielded 100 % removal rate of suspended solid compared to ODEC and fibre medium while fibre medium showed the least effective filter. The removal rate of COD of all medium was low. All the medium failed to filter soya water due to the high concentration of chemical compound. The study concluded that when the parameters measured is chemically-related such as COD and pH, the soil medium filter less effectively. The effectiveness in filtering non-chemical parameter such s suspended solid is affected by the grain size and distribution, texture and the structure of the mediums.
Penggunaan Aspal Karet Pada Campuran Perkerasan Asphalt Concrete – Binder Course (AC-BC) Elsa Eka Putri; Arialde Kaspari
Jurnal Bangunan: Konstruksi & Desain Vol. 1 No. 1 (2023): Mei 2023
Publisher : Universitas Andalas

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.25077/jbkd.1.1.32-43.2023

Abstract

Aspal karet adalah aspal penetrasi 60/70 yang dimodifikasi dengan penambahan bahan aditif berupa karet alam dan dapat menjadi alternative untuk perkerasan lentur (Kurniadji, 1999). Penambahan karet alam (lateks) bertujuan untuk meningkatkan kualitas campuran aspal dan membantu pemanfaatan karet alam (lateks) yang ketersediannya cukup banyak di Indonesia. Penelitian ini bertujuan untuk mengetahui nilai parameter Marshall pada perkerasan Asphalt Concrete - Binder Course (AC-BC) dengan menggunakan bahan pengikat aspal karet 7%. Pengujian Marshall dilakukan di laboratorium Balai Pelaksanaan Jalan Nasional Sumatera Barat. Ada lima parameter Marshall yang diuji berdasarkan standar Spesifikasi Umum Bina Marga 2018 Revisi 2, yaitu Stabilitas, Void in Mixture, Void Filled with Asphalt, Void in Mineral Aggregate, dan Marshall Quotient. Pada penelitian ini diperoleh hasil nilai stabilitas tertinggi terdapat pada kadar aspal 6% sebesar 1290,0 kg. Nilai VFB tertinggi adalah kadar 6,5% sebesar 78,26. Sedangkan nilai Marshall Quotient tertinggi berapa pada kadar 6,5% sebesar 280,980. Sehingga dapat disimpulkan penggunaan aspal karet 7% pada perkerasan AC-BC diperoleh pada kadar aspal 6.75%.
Digitalization of Micro, Small and Medium Enterprises in Nagari Muaro Pingai, Junjung Sirih District, Solok Regency, West Sumatra Elsa Eka Putri; Masyhuri Hamidi
Warta Pengabdian Andalas Vol 31 No 1 (2024)
Publisher : Lembaga Penelitian dan Pengabdian kepada Masyarakat (LPPM) Universitas Andalas

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.25077/jwa.31.1.99-107.2024

Abstract

This program aims to introduce the benefits of science and technology to Micro, Small, and Medium Enterprises (MSMEs) in Nagari Muaro Pingai due to the limited market share and need for more awareness of products produced by these MSMEs. Through this digitalization work program, the community service team from Universitas Andalas assisted five MSME entrepreneurs by strengthening their business branding, providing financial assistance, and digital promotion. The methods employed include direct data collection, interview surveys, and providing training directly to the community. The financial assistance included mobile phones to help them digitize their businesses. The outcomes of those MSME's digitalization work programs included business logos, promotional brochures, and business location registration on the Google Maps platform. The community engagement activities further expanded market reach, increased income, and simplified transaction processes for MSME entrepreneurs in Nagari Muaro Pingai.