Ronald E. Stok
Faculty of Industrial Technology, Petra Christian University

Published : 2 Documents Claim Missing Document
Claim Missing Document
Check
Articles

Found 2 Documents
Search

PENERAPAN MULTI-CRITERIA DECISION MAKING DALAM PENGAMBILAN KEPUTUSAN SISTEM PERAWATAN Jani Rahardjo; Rosa Yustina; Ronald E. Stok
Jurnal Teknik Industri: Jurnal Keilmuan dan Aplikasi Teknik Industri Vol. 2 No. 1 (2000): JUNE 2000
Publisher : Institute of Research and Community Outreach - Petra Christian University

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (60.889 KB) | DOI: 10.9744/jti.2.1.1-12

Abstract

The selecting of the right maintenance system strategy can give an optimum result in achieving productivity of a production process. The right method is needed in choosing this strategy, so that the decision-maker can make the right decision. Methods used in the selecting of the maintenance system strategy is Multi Criteria Decision-Making, especially Analytical Hierarchy Process (AHP), and Heuristic Method. Heuristic method is used to decide the most critical criteria in the choosing of processing system strategy. Abstract in Bahasa Indonesia : Pemilihan strategi sistem perawatan yang tepat dapat memberikan hasil yang optimum dalam pencapaian produktivitas suatu proses produksi. Didalam pemilihan strategi ini diperlukan suatu metode yang tepat agar decision maker dapat membuat keputusan yang tepat. Metode yang digunakan dalam pemilihan strategi sistem perawatan adalah Multi-Criteria Decision Making, khususnya Analytical Hierarchy Process( AHP) dan Metode Heuristic.Metode Heuristic digunakan untuk menetukan kriteria yang paling kritis dalam pemilihan strategi sistem perawatan. Kata kunci: analytical hierarchy process, perawatan
IMPLEMENTASI TOTAL PRODUCTIVE MAINTENANCE DI DEPARTEMEN NON JAHIT PT. KERTA RAJASA RAYA Tanti Octavia; Yenny Amelia; Ronald E. Stok
Jurnal Teknik Industri: Jurnal Keilmuan dan Aplikasi Teknik Industri Vol. 3 No. 1 (2001): JUNE 2001
Publisher : Institute of Research and Community Outreach - Petra Christian University

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (35.615 KB) | DOI: 10.9744/jti.3.1.18-25

Abstract

The effectivity improvement of production facility in factory is not only on facility manitenance but also on human resources. Total Productive Maintenance (TPM) gives an optimal solution to effectivity improvement. A case study of TPM implementation have done in non sewing department of PT Kerta Rajasa Raya. Abstract in Bahasa Indonesia : Peningkatan efektivitas dari fasilitas produksi di suatu perusahaan bukan hanya terbatas pada perawatan fasilitas kerja saja tetapi juga sumber daya manusia. Total Productive Maintenance (TPM) memberikan suatu solusi optimal terhadap peningkatan efektivitas dengan melibatkan semua sumber daya manusia yang bertanggung jawab terhadap fasilitas produksi. Suatu studi kasus terhadap pengimplementasian TPM dilakukan di departemen non jahit PT. Kerta Rajasa Raya. Kata kunci : TPM, MTTF, Autonomous Maintenance.