PENELITIAN AWAL PENENTUAN WAKTU PENYELESAIAN PROYEK DENGAN METODE PERT PROJECT EVALUATION AND REVIEW TECHNIQUE Sentosa Limanto; Tirta Djusman Arief
Civil Engineering Dimension Vol. 4 No. 1 (2002): MARCH 2002
Publisher : Institute of Research and Community Outreach - Petra Christian University

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (134.079 KB) | DOI: 10.9744/ced.4.1.pp. 25-29

Abstract

Construction involves many activities. Every activity need a portion of time which is defined as duration. Duration is a statistic probabilistic variable, which is expressed in a range of values. So the total time required to complete a construction project is also expressed in a range of times, thus the use of PERT to evaluate construction time is considered to be more realistic. An observation on a construction of a warehouse in steel structure in Surabaya shows that this method gives a tendency of good result. Abstract in Bahasa Indonesia : Pembangunan melibatkan banyak aktivitas. Tiap aktivitas memerlukan sejumlah waktu, yang didefinisikan sebagai durasi. Durasi adalah sebuah besaran statistik probabilistik, yang dinyatakan dalam satu interval nilai. Maka total waktu yang diperlukan untuk menyelesaikan pembangunan juga dinyatakan dalam satu interval waktu, sehingga penetapan waktu penyelesaian proyek dengan metode PERT dirasakan lebih realistis. Pengamatan atas pelaksanaan sebuah gudang yang terbuat dari struktur baja, di Surabaya, menunjukkan bahwa metode ini memberikan kecenderungan hasil yang baik.
STUDI AWAL APLIKASI TEORI FUZZY SET PADA PERUSAHAAN READYMIX CONCRETE DALAM MEMILIH PEMASOK MATERIAL BETON Sentosa Limanto; Adi Sanjaya; Tirta Djusman Arief; Josep Buntoro
Civil Engineering Dimension Vol. 7 No. 1 (2005): MARCH 2005
Publisher : Institute of Research and Community Outreach - Petra Christian University

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (194.666 KB) | DOI: 10.9744/ced.7.1.pp. 46-56

Abstract

Material supply has a very important role in construction process. Material supply process require suitable and reliable supplier. In this study, fuzzy set theory is used as the appraisal and selection process of material suppliers to supply materials needed to produce concrete mix in a ready mix company. Sinusoidal, Blockley, and Baldwin models are used. This research uses three variables as qualifications, which are quality, performance, and payment. With these qualifications, ready mix concrete company can appraise material suppliers to be selected. It is shown that quality can be represented by Sinusoidal model, performance by Blockley model, and payment by Baldwin model, while the appropriate defuzzification method is maximum composite method. Abstract in Bahasa Indonesia : Aktivitas yang mempunyai peranan penting dalam proses pelaksanaan proyek konstruksi adalah penyediaan material. Proses penyediaan material memerlukan pemasok yang sesuai dan dapat diandalkan. Dalam studi ini dicoba untuk menggunakan teory fuzzy set dalam proses penelitian dan pemilihan pemasok material untuk adonan beton suatu perusahaan readymix concrete. Model yang dipergunakan adalah model Sinusoidal, Blockley dan Baldwin. Kualifikasi yang digunakan dipengaruhi oleh tiga variabel penentu yaitu variabel kualitas, performa dan pembayaran. Dengan kualifikasi tersebut perusahaan readymix concrete bisa menilai para supplier material yang akan dipakai perusahaan. Penelitian ini menunjukkan bahwa penilaian melalui variabel kualitas dapat diwakili oleh model Sinusoidal, untuk variabel performa diwakili oleh model Blockley dan variabel pembayaran diwakili oleh model Baldwin, sedangkan metode defuzifikasi yang sesuai adalah metode maksimum komposit.