Claim Missing Document
Check
Articles

Found 15 Documents
Search

Performa Metode Aliran Daya Fast Decoupled di Jaringan Distribusi Setia, Giri Angga; Haz, Fauzia; Sianipar, Gibson Hilman Maruhum
JTERA (Jurnal Teknologi Rekayasa) Vol 3, No 2: December 2018
Publisher : Politeknik Sukabumi

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (337.911 KB) | DOI: 10.31544/jtera.v3.i2.2018.249-254

Abstract

Makalah ini menyajikan suatu performa metode aliran daya fast decoupled di jaringan distribusi. Karakteristik jaringan distribusi diantaranya rasio saluran R/X tinggi, struktur radial, saluran terdiri dari 1, 2, dan 3 fasa, serta beban tidak seimbang. Permasalahan mengenai kompleksnya karakteristik jaringan tersebut menuntut para peneliti untuk mengembangkan metode aliran daya konvensional agar dapat diterapkan. Metode aliran daya fast decoupled dapat bekerja dengan baik di jaringan transmisi. Karakteristik jaringan distribusi dengan rasio saluran R/X yang tinggi mengurangi kemampuan konvergensinya dan bahkan terjadi divergensi. Oleh karena itu, makalah ini mengajukan pengembangan metode fast decoupled berupa rotasi sumbu yang dilakukan di setiap bus. Pengujian dilakukan pada standar jaringan distribusi IEEE 13 dan 34 bus. Performa pada jaringan distribusi 13 bus membutuhkan 3,5 iterasi dengan waktu komputasi 0,049 detik dan sudut rotasi optimal -43,4°, sedangkan performa pada jaringan distribusi 34 bus membutuhkan 4 iterasi dengan waktu komputasi 0,152 detik dan sudut rotasi optimal -61,4°. Ketika dibandingkan dengan metode Backward-Forward Sweep (BFS) yang merupakan metode favorit dalam melakukan perhitungan aliran daya di jaringan distribusi radial, menunjukkan bahwa keduanya memiliki performa yang sama baiknya. Oleh karena itu, metode rotasi sumbu fast decoupled layak diterapkan dengan variasi karakteristik jaringan distribusi. Selain itu, metode ini dapat diterima secara umum karena tidak hanya dapat diterapkan dengan baik di jaringan transmisi, tetapi di jaringan distribusi.
Optimasi Operasi Pembangkit Listrik Tenaga Air (PLTA) Menggunakan Linear Programming Dengan Batasan Ketersediaan Air Winasis Winasis; Hari Prasetijo; Giri Angga Setia
Dinamika Rekayasa Vol 9, No 2 (2013): Jurnal Ilmiah Dinamika Rekayasa - Agustus 2013
Publisher : Jenderal Soedirman University

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.20884/1.dr.2013.9.2.67

Abstract

One of hydro power plant operational problem is how to maximize available water resouces to gather optimal electric power generation. Water availability which is limited and can be stored in a reservoir will influence electrical energy generated by the plant. This paper present a new approach of short term optimization of hydro power plant operation. The objective function is to maximize energy which is produced by power plant on scheduling operation period, with consider water resource availability in reservoir as operational constraint. The optimization problem is formulated in Linear Programming Method, in which this method is a commonly used to solve optimization problem in hydro power plant. Based on simulation results on Ketenger Hydro Power Plant using water flow data on June 1st 2013 shows that this method can be used to solve hydro power plant operation optimization problem well. Electrical energy as main objective function is maximized and all prevailing constrain is satisfied. On this short term operation (24 hour) simulation, total energy can be produced is 96121,55 kWh, or 1427 kWh (1,51%) greater comparing with real generation condition with 96694 kWh.
Optimalisasi Pembangkitan Energi Listrik PLTA Jatiluhur Menggunakan Pemrograman Linier Giri Angga Setia; Rafly Sulthan Mahdy; Winasis Winasis; Hari Prasetijo
JTERA (Jurnal Teknologi Rekayasa) Vol 6, No 2: December 2021
Publisher : Politeknik Sukabumi

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31544/jtera.v6.i2.2021.313-320

Abstract

Permintaan energi listrik yang semakin meningkat berakibat pada meningkatknya kebutuhan terhadap pembangkit sebagai penyedia energi listrik. Salah satu sumber potensi energi listrik terbesar yang dimiliki Indonesia adalah energi air. Pemanfaatan air yang tepat sebagai sumber energi listrik pada pembangkit listrik tenaga air (PLTA) merupakan tugas penting terutama pada PLTA yang menggunakan reservoir. Beberapa kendala yang dihadapi PLTA tersebut mengacu pada ketersedian air dan kapasitas pembangkitannya. Dengan demikian optimasi pada PLTA perlu dilakukan untuk menghadapi masalah tersebut. Optimasi yang dilakukan pada penelitian ini menggunakan data debit PLTA Jatiluhur selama bulan Mei 2020. Metode optimasi pemrograman linier digunakan sebagai solusi terhadap permasalahan operasional pembangkitan daya pada penelitian ini. Fungsi objektif dari optimasi ini adalah untuk memaksimalkan pembangkitan energi listrik unit generator. Adapaun fungsi kendalanya yaitu dengan mempertimbangkan ketersediaan air dan kapasitas pembangkitan. Hasil perhitungan dalam periode operasi satu bulan menunjukkan bahwa PLTA berpotensi memproduksi energi listrik lebih besar 11,14% dibandingkan kondisi existing atau dengan selisih 7.938,6 MWh. Selain itu rata-rata efisiensi mengalami kenaikan sebesar 0,7%. Dengan demikian hasil tersebut dapat mengindikasikan bahwa implementasi metode pemrograman linier berjalan baik dan efektif dalam memecahkan masalah operasi pembangkitan daya PLTA.
Performa Metode Aliran Daya Fast Decoupled di Jaringan Distribusi Giri Angga Setia; Fauzia Haz; Gibson Hilman Maruhum Sianipar
JTERA (Jurnal Teknologi Rekayasa) Vol 3, No 2: December 2018
Publisher : Politeknik Sukabumi

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31544/jtera.v3.i2.2018.249-254

Abstract

Makalah ini menyajikan suatu performa metode aliran daya fast decoupled di jaringan distribusi. Karakteristik jaringan distribusi diantaranya rasio saluran R/X tinggi, struktur radial, saluran terdiri dari 1, 2, dan 3 fasa, serta beban tidak seimbang. Permasalahan mengenai kompleksnya karakteristik jaringan tersebut menuntut para peneliti untuk mengembangkan metode aliran daya konvensional agar dapat diterapkan. Metode aliran daya fast decoupled dapat bekerja dengan baik di jaringan transmisi. Karakteristik jaringan distribusi dengan rasio saluran R/X yang tinggi mengurangi kemampuan konvergensinya dan bahkan terjadi divergensi. Oleh karena itu, makalah ini mengajukan pengembangan metode fast decoupled berupa rotasi sumbu yang dilakukan di setiap bus. Pengujian dilakukan pada standar jaringan distribusi IEEE 13 dan 34 bus. Performa pada jaringan distribusi 13 bus membutuhkan 3,5 iterasi dengan waktu komputasi 0,049 detik dan sudut rotasi optimal -43,4°, sedangkan performa pada jaringan distribusi 34 bus membutuhkan 4 iterasi dengan waktu komputasi 0,152 detik dan sudut rotasi optimal -61,4°. Ketika dibandingkan dengan metode Backward-Forward Sweep (BFS) yang merupakan metode favorit dalam melakukan perhitungan aliran daya di jaringan distribusi radial, menunjukkan bahwa keduanya memiliki performa yang sama baiknya. Oleh karena itu, metode rotasi sumbu fast decoupled layak diterapkan dengan variasi karakteristik jaringan distribusi. Selain itu, metode ini dapat diterima secara umum karena tidak hanya dapat diterapkan dengan baik di jaringan transmisi, tetapi di jaringan distribusi.
Optimalisasi Jangka Menengah PLTA Memperhatikan Ketersediaan Air Menggunakan Linear Programming Winasis; Hari Prasetijo; Giri Angga Setia
Jurnal Nasional Teknik Elektro dan Teknologi Informasi Vol 3 No 2: Mei 2014
Publisher : Departemen Teknik Elektro dan Teknologi Informasi, Fakultas Teknik, Universitas Gadjah Mada

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (250.636 KB)

Abstract

Hydro power plant is kind of electric power generation which utilize energy from water fall to produce electricity. One of its operational problem is limited water supply and available water which can be stored in reservoir. This limitation will affect the electrical energy can be generated by the hydro power plant. This paper present a methodology of medium term optimization of hydro power plant operation to maximize its energy production with considering water availability in reservoir as operational constraint. Operation optimization problem is formulated in Linear Programming model and then solved using Tomlab optimization software. Simulations using water flow data of Ketenger Hydro Power Plant on June 2013 show that this method can be used to solve hydro power plant operation optimization problem well. Based on the simulation results with a period of 720 hours (1 month) the total electrical energy that can be generated is equal to 2990.8 MWh. This value is 69,6 MWh (or 2,3%) greater when compared to the real condition of electrical power generated in June with ammount of 2921,2 MWh.
Diagnosis Kondisi Minyak Tranformator Menggunakan Teknik Dissolved Gas Analysis Fauzia Haz; Muhammad Rizki Akbar; Giri Angga Setia
Jurnal Teknik: Media Pengembangan Ilmu dan Aplikasi Teknik Vol 21 No 1 (2022): Jurnal Teknik - Media Pengembangan Ilmu dan Aplikasi Teknik
Publisher : Fakultas Teknik - Universitas Jenderal Achmad Yani

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

At the Cikalong hydropower plant there are 3 power transformers with a voltage rating of 6.3/77 kV, because of their long life, it is necessary to analyze the condition of the transformer oil. One way to determine the level of fault gas contained in transformer oil is the DGA (Dissolved Gas Analysis) test. DGA will extract the gas to find out indications of disturbance based on the interpretation of the dissolved gases data, namely the Total Dissolved Combustible Gas (TDCG), Key Gas, Roger's Ratio, Doernenberg's Ratio and Duval's Triangle methods. This method is in order to determine the condition of the transformer oil is normal or not, measure the breakdown voltage value and calculate the correlation value between operating hours and the amount of power production. The results of the DGA analysis on transformer units 1, 2, and 3 of the Cikalong hydropower sub-unit show the TDCG value in condition 1, which includes all transformers in good condition. The value of the correlation coefficient between hours of operation and the number of kWh production with TDCG is 0.267 and 0.297, respectively, which indicates the relationship between these variables is a weak relationship (standard value is close to 1).
PARAMETRIC STUDY OF NATURAL DIELECTRIC MATERIALS THICKNESS IN WAVEGUIDE ANTENNA MODE TE10 COASTAL RADAR 3 GHz ANTENNA M. Reza Hidayat; Hidayat Ramdan; Handoko Rusiana Iskandar; Giri Angga Setia
JMECS (Journal of Measurements, Electronics, Communications, and Systems) Vol 8 No 2 (2021): JMECS
Publisher : Universitas Telkom

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.25124/jmecs.v8i2.4068

Abstract

Manufacturing process was important in the development of antenna technology in order to obtain the antenna optimal performance. One of the approaches to increase the antenna performance was to use a natural dielectric material. In this research, a waveguide antenna was designed by inserting a natural dielectric material, an FR-4-Epoxy (? = 4,3 in the simulator) into a waveguide with a width of 72 mm, a height of 34 mm, and a length of 50 mm. The properties of the mode waveguide antenna were modified by slightly varying the position of the dielectric material and adding an initial thickness of 1.6 mm. The excitation of the waveguide was configured using mode. The Observed paramters in this research are (return loss) and radiation parameters (gain and directivity). On the simulation shows that the best performance of the waveguide antenna was obtained when the dielectric position is 2 mm from the connector and thickness 3,2 mm. The simulation also generates the parameter of -22,8 dB with gain and directivity was 5,77 and 1,799 respectively at a frequency 3 of GHz while from measurement the frequency was shifted at 3,15 GHz with -23,05 . The result of this research shows that the addition of dielectric material to the waveguide antenna as a resonator will affect the antenna parameters this is due to the nature of the dielectric material which has a special permittivity value that changes the nature of the medium of wave propagation propagating on the antenna. From the observations in the simulation stage, the closer the position of the material to the connector and the thicker the material, the better the return loss, even though it slightly shifts the working frequency of the antenna from the initial frequency. Manufacturing process was important in the development of antenna technology in order to obtain the antenna optimal performance. One of the approaches to increase the antenna performance was to use a natural dielectric material. In this research, a waveguide antenna was designed by inserting a natural dielectric material, an FR-4-Epoxy (? = 4,3 in the simulator) into a waveguide with a width of 72 mm, a height of 34 mm, and a length of 50 mm. The properties of the mode waveguide antenna were modified by slightly varying the position of the dielectric material and adding an initial thickness of 1.6 mm. The excitation of the waveguide was configured using mode. The Observed paramters in this research are (return loss) and radiation parameters (gain and directivity). On the simulation shows that the best performance of the waveguide antenna was obtained when the dielectric position is 2 mm from the connector and thickness 3,2 mm. The simulation also generates the parameter of -22,8 dB with gain and directivity was 5,77 and 1,799 respectively at a frequency 3 of GHz while from measurement the frequency was shifted at 3,15 GHz with -23,05 . The result of this research shows that the addition of dielectric material to the waveguide antenna as a resonator will affect the antenna parameters this is due to the nature of the dielectric material which has a special permittivity value that changes the nature of the medium of wave propagation propagating on the antenna. From the observations in the simulation stage, the closer the position of the material to the connector and the thicker the material, the better the return loss, even though it slightly shifts the working frequency of the antenna from the initial frequency.
Analisis Ketidakseimbangan Fasa Dan Harmonisa Pada Sistem Air Handling Unit (Ahu) Di Pt. Medion Farma Jaya Dewi Purnama Sari; Giri Angga Setia
EPSILON: Journal of Electrical Engineering and Information Technology Vol 18 No 1 (2020): EPSILON: Journal of Electrical Engineering and Information Technology
Publisher : Department of Electrical Engineering, UNJANI

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Salah satu permasalahan yang dihadapi oleh PT Medion Farma Jaya adalah ketidakseimbangan fasa dan harmonisa pada sistem AHU. Permasalahan tersebut akibat dari pembebanan arus masukan untuk fan evaporator yang tidak seimbang, serta penggunaan variable speed drive (VSD) yang merupakan salah satu peralatan non linier yang digunakan untuk mengatur kecepatan motor blower pada sistem AHU. Peralatan ini memberikan arus harmonisa ke jaringan sistem tenaga pada orde harmonisa rendah seperti harmonisa ke-3, 5, 7, 9, 11 dan 13. Oleh karena itu, perlu dilakukan penyeimbangan arus beban perfasa, serta melakukan filterisasi harmonisa untuk mereduksi harmonisa tersebut. Filter yang digunakan adalah filter double tuned yang ditransformasi dari 2 buah filter single tuned yang memiliki 2 frekuensi yang berbeda. Perancangan dan simulasi pemasangan filter pada bus 3 dan bus 5 dilakukan menggunakan software ETAP power station 12.6. Dari hasil penelitian yang telah dilakukan terjadi penurunan nilai THDi pada bus 3 sebesar 74,38% menjadi 12,33%, sedangkan pada bus 5 sebesar 74,71% menjadi 12,39%. Pada akhirnya, nilai THDi pada sistem AHU mendekati nilai standar yang ditetapkan IEEE Standar 519- 1992. Sedangkan untuk ketidakseimbangan fasa mengalami penurunan sebesar 4% dengan penurunan arus beban pada fasa R sebesar 26,1 A.
Desain Sistem Pembangkit Listrik Tenaga Hybrid (Solar Cell dan Wind Turbine) untuk Beban Perumahan Giri Angga Setia; Sutriyadi; Naftalin Winanti; Fauzia Haz; Handoko Rusiana Iskandar
EPSILON: Journal of Electrical Engineering and Information Technology Vol 19 No 2 (2021): EPSILON: Journal of Electrical Engineering and Information Technology
Publisher : Department of Electrical Engineering, UNJANI

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.55893/epsilon.v19i2.58

Abstract

Pembangkit Listrik Tenaga Hybrid (PLTH) merupakan pembangkit listrik yang terhubung dari beberapa jenis sumber pembangkit energi terbarukan atau dengan sumber energi tidak terbarukan. Terbatasnya sumber energi konvensional menjadi penyebab dikembangkannya pemanfaatan energi non konvensional atau energi terbarukan di Indonesia. Salah satu energi yang potensial untuk dikembangkan di Indonesia adalah energi surya dan energi bayu. Penelitian ini bertujuan untuk melakukan desain terhadap PLTH skala kecil, kemudian menganalisis daya keluaran (output) yang dihasilkan ketika pembangkit hybrid bekerja dengan menggunakan baterai sebagai indikator. Proses terjadinya pengontrolan dengan menggunakan display tegangan sebagai media untuk mengetahui tegangan pada masing masing pembangkit dan baterai. Metode pertama yang dilakukan adalah studi potensi kedua energi tersebut. Kemudian melakukan perhitungan kapasitas yang dibutukan oleh setiap komponen. Selanjutnya adalah menyusun desain pembangkit yang telah diperhitungkan kapasitasnya menjadi sebuah pembangkit hybrid. Langkah terakhir adalah mengimplementasikan desain pembangkit tersebut untuk diterapkan ke beban rumah tangga skala kecil 40 Watt diantaranya 2 buah lampu dan 1 buah kipas angin. Berdasarkan hasil desain yang dilakukan pada solar cell didapat kapasitas ukuran modul 40 Wp, fill factor sebesar 0.73 dan efisiensinya 13% sedangkan desain wind turbine didapat daya sebesar 1.169 Watt dengan kecepatan angin 3,5 m/s dan efisiensinya terbesar mencapai 64%. Kemudian kapasitas solar charge controller sebesar 2.32 A, kapasitas inverter 50 Watt, dan energi total baterai 3.33 Ah. Pengisian baterai untuk mencapai 20%-100% kapasitas membutuhkan waktu 6.6 jam saat cuaca cerah dan 8.3 jam saat cuaca mendung.
Perancangan Continuity Tester Pada Proses Pengkabelan Pesawat Fauzia Haz; Arifil Fikri; Giri Angga Setia
EPSILON: Journal of Electrical Engineering and Information Technology Vol 19 No 3 (2021): EPSILON: Journal of Electrical Engineering and Information Technology
Publisher : Department of Electrical Engineering, UNJANI

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.55893/epsilon.v19i3.69

Abstract

In the process of making aircraft, it requires strict standard requirements in accordance with the requirements that have been regulated in the world of aviation. One example is in the manufacture of a series of aircraft harness cables at the Harnessing Shop PT. Dirgantara Indonesia having many stages, including cable marking, looming, connection, continuity, insulation. Of course, for each stage is inspected. In continuity testing, it is done manually using a multimeter so it requires at least 3 people and the testing process is considered quite long. Given these problems, it is necessary to have a replacement multimeter in continuity testing to speed up and simplify the testing process. The continuity testing tool uses the Arduino Mega 2560, IC LM317T microcontroller, relay as the main component. The microcontroller is used to process the reading data according to the datasheet drawing, the LM317T IC is used to regulate the output voltage from the Arduino which will be converted to a resistance value, the relay is used to detect the position of the second end point in continuity testing. A user interface web browser is used to operate the tool and display data from the results of continuity testing. From the test results, it is found that the readings of the suitability of the installation point are in accordance with the actual cable harness and the resistance value is close to the same compared to using a multimeter. The passed statement will appear when the actual point reading of the cable harness is in accordance with the datasheet drawing, while the failed statement will appear when the actual point on the wiring harness does not match the datasheet drawing. The test results are in the form of excel data which can be easily stored by the operator.