SISTEM INFORMASI JARINGAN IRIGASI (SIJARI) KABUPATEN SUKOHARJO BERBASIS PROGRAM ARCVIEW GIS 3.3. Sriyana, Sriyana
TEKNIK Volume 31, Nomor 1, Tahun 2010
Publisher : Diponegoro University

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (821.588 KB) | DOI: 10.14710/teknik.v31i1.1760

Abstract

Data availability of irrigation area authority, discharge data, physical condition of weir, channel condition,hydraulic structure damage, finance needed for recovery etc are sometimes unclear, invalid and lost in data,low service and poor performance, resulting planning interest, monitoring implementation and controlunfulfilled. The purpose of this thesis is to make SIJARI software (Sistem Informasi Jaringan Irigasi )whichcontains data base information of Irrigation in Geographic Information System(SIG), based on Arcviewprogram GIS 3.3. The result of SIJARI software contains all data base information starting from irrigationarea authority, structures damage, channel condition, crop pattern etc, where all data can be fast andaccurately accessible and can be used for pre-plan, planning, implementation, monitoring and control.
PERENCANAAN EMBUNG CABEAN DI KABUPATEN SUKOHARJO Himawan, Edo; Kusumo N., Muhammad Donny; Sriyana, Sriyana; Sugiyanto, Sugiyanto
Jurnal Karya Teknik Sipil Volume 3, Nomor 4, Tahun 2014
Publisher : Departemen Teknik Sipil, Fakultas Teknik Universitas Diponegoro

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (593.007 KB)

Abstract

The construction of small dams Cabean is an effort in order to meet the water needs of the textile industry in Nguter Subdistrict, Sukoharjo Regency. The first step to design Cabean Small Dam is hidrology analysis such as: dependable discharge and water requirement. The dam is projected to supply  water requirement in one subdistricts, water requirement for irrigation which has 50 ha of areas. Dependable discharge is discharge mainstay 80% fulfilled. Flood discharge plan of The Cabean Small Dam is calculated from rainfall data and the result of flow is 393.86  m3/s which taken from HSS Gamma 1 with PMF. Cabean Small Dam is designed with rock fill dam type. The height of the dam is 18 meters with slope ratio 1:2.25 at the upper course and 1:1.75 at the lower course. For 25 years lifetime and storage capacity 113,625 m3. The spillway design is choosen with 30 m wide and  with stilling basin (USBR Type IV) which use 30 m of wide and 15 m of length as the dimension. The diversion tunnel design takes 150 m of length and 5 m of diameter. The cost of Cabean Small Dam Project  is about Rp 21,343,482,440.00 (Twenty One Billion Thirty Hundred Fourty Three Million Four Hundred Eighty Two Thousand Four Hundred Fourty Rupiahs) with 48 weeks as time target of this project.
PERENCANAAN EMBUNG TAMBAKROMO UNTUK MEMENUHI KEBUTUHAN AIR BAKU Fahmi, Mushafa; Halim, Fandy; Atmojo, Pranoto Samto; Sriyana, Sriyana
Jurnal Karya Teknik Sipil Volume 2, Nomor 4, Tahun 2013
Publisher : Departemen Teknik Sipil, Fakultas Teknik Universitas Diponegoro

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (551.857 KB)

Abstract

The increasing scarcity of water resources, there needs to be an effort that must be implemented to meet the needs of the water. One way PT. Indocement to meet the water requirement of 60 liters / second to harness the potential of Beku river with Tambakromo Embung development plan, in Wukirsari Village, District Tambakromo, Pati. Based on the mainstay discharge analysis by the method of FJ mock obtained the discharge of 120 liters / sec. For the body design of the small dam used the flood discharge hydrological data with HSS Gamma I method with flood discharge plan 1000 years return period amounted 116.92 m3/second. Tambakromo Small Dam capacity is 5,000,000 m3. Tambakromo Small Dam height is 20 meters, 7 meters wide summit reservoir, spillway width of 15 meters, spillway height is 2 meters. Estimated cost to build Tambakromo Small Dam amounted Rp.33.874.000.000, 00.
REKAYASA NILAI PEMBANGUNAN GEDUNG SERBA GUNA UNIVERSITAS NEGERI SEMARANG Jatmiko, Jatmiko; Wibowo, Ary; Sriyana, Sriyana; Dwi H., Jati Utomo
Jurnal Karya Teknik Sipil Volume 2, Nomor 1, Tahun 2013
Publisher : Departemen Teknik Sipil, Fakultas Teknik Universitas Diponegoro

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (14.692 KB)

Abstract

Value engineering of multipurpose building project Semarang State University conducted for optimization of cost and functionality. Value engineering is used to evaluate the project plan in order to save the budget costs, optimize performance and efficiency of time but still consider the quality of the work. Application of value engineering aims to obtain high-cost work items, bring alternative design ideas to replace the original design on selected work items and calculate the cost savings from the application of value engineering. Stages of this value engineering plans that include; stages of information, creative stage, analysis stage and the stage of recommendations. Identification of high-cost items of work with cost breakdown model and Pareto charts. Potential work item function analysis is performed to classify the basic functions and secondary functions in order to obtain the ratio of cost / worth, then performed a zero-one matrix analysis to determine the best alternative of testing against several criteria functions presented. Value engineering analysis results indicate that cost savings, for items slab occurred saving the value / cost of Rp. 3.274.245.393, 35 or 51.20 % of the initial cost of Rp. 6,394,649,122.60 and 8.57 % of the total project cost. For items foundations occurred saving the value / cost of Rp. 318,946,000 or 41.27 % of the initial cost of Rp. 772,790,000.00 and 1.19 % of the total project cost. For the cost of the item walls Eco Lite Panel larger Rp. 140,847,906.93 of the cost of masonry, but in terms of execution time Eco Lite Panels faster than bricks with the result of the acceleration time fee of Rp. 224.734.555,16 or 21,82 % of the cost of the wall work and 0.59 % of the total project cost. Physical Eco Lite Panel calsiboard coated on both sides to make more smooth and flat surface so that the surface can be directly painted. So the total cost savings after the engineering value is equal Rp. 3.817.926.101,65 or by 9.99 % of the total cost of the overall work of Rp. 38,199,420,000.00.
KAJIAN KARAKTERISTIK DAS TUNTANG DAN MODEL PENGELOLAAN DAS TERPADU Sriyana, Sriyana
TEKNIK Volume 32, Nomor 3, Tahun 2011
Publisher : Diponegoro University

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (592.578 KB) | DOI: 10.14710/teknik.v32i3.1742

Abstract

A low carrying capacity of drainage basin or watershed may cause several problems, where floods occur inrainy season and droughts occur in dry season, also the occurrence of erosion, sedimentation and so on, hasbeen government’s problem in watershed management all along. In order to anticipate this condition,characteristic data of a watershed are required, so that it can be used as basic reference of watershedmanagement.The purpose of this paper is to conduct a study on the characteristics of Tuntang watershed of Central JavaProvince and watershed management model.The method of approach uses aspects of watershed geomorphology such as the shape of watershed, elongationratio and circularity ratio approaches, order of river using Strahle method, watershed density using Lynsleyformula, and river gradient calculated based on the comparison between elevation difference and length of mainrivers.Results show that magnitude index of Tuntang Sub watershed has elongated shape with Rc value between 0.27 to0.46, which means that the longer concentration time needed, the lower flood fluctuation. And relatively roundedshape with Rc value between 0.57 to 1.00, which means that the shorter concentration time needed, the higherflood fluctuation occurs. Sub watershed order range from 4 to 6 order, which means that river basins have floodwater level increase (moderately quick to fast), likewise water level decrease. Level slope between 0 - 8 % (lowflow velocity) with an area of 117605.56 Ha, and very steep slope > 40 % (very high flow velocity) with an areaof 4219.09 Ha. The highest drainage density occurs in Sub watershed of Tuntang downstream 1.88 Km / Km²,and lowest Sub watershed of Blorong 1.01 Km / Km². Based on both magnitudes, the water being stored is inmedium category and floods and droughts occur. The flow pattern has the shape of rectangular dendritic anddendritic medium, showing that soil characteristics is limestone and shale. To obtain optimal performance resultof Tuntang watershed, integrated watershed management program is needed in watershed managementintegration by involving various associated parties.
KAJIAN PEMANFAATAN POTENSI SUMBER DAYA AIR TERPADU ( STUDI KASUS MATA AIR INGAS (COKRO), KEC. COKRO TULUNG KABUPATEN KLATEN – JAWA TENGAH) Sriyana, Sriyana
TEKNIK Volume 32, Nomor 1, Tahun 2011
Publisher : Diponegoro University

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (394.743 KB) | DOI: 10.14710/teknik.v32i1.1686

Abstract

Potential exploitation of Ingas (Cokro) water resource is currently less than optimal, there are still manywasted water flows and there is still no coordination in planning. The objective of this research is to reviewwater resource potential integratedly, by measuring the spring discharge in real terms, analyzing the utilizationof water source and water balance. The method used in this thesis is by measuring the discharge using currentmeter, analyzing water requirements for plants using Penman method, and analyzing data with the help ofMicrosoft Exel. It is resulted that the total potential of Ingas (Cokro) water resource is 1297 l/dt, utilized fordrinking water (PDAM Surakarta) at 400 l/dt, drinking water for Cokro Village at 4 l/dt, and the remainder isused for irrigation and moving a turbine with 50 Watt electric power. Water demand for irrigation is 995 l/dt,fullfilled from Ingas (Cokro) source discharge at 593 l/dt plus surface water discharge as a result frommeasurment of pulsur river (Plosowareng weir) at 696 l/dt, from the total water resource potential of 1289 l/dt.Water balance of Ingas (Cokro) water resource has already balanced or optimal, while residual discharge of294 l/dt is obtained at measurement point (Plosowareng weir)
Pendekatan Model Pengendalian untuk Mengurangi Risiko Akibat Gelombang Tsunami Sriyana, Sriyana
MEDIA KOMUNIKASI TEKNIK SIPIL Volume 13, Nomor 2, Edisi XXXII, JUNI 2005
Publisher : Department of Civil Engineering, Diponegoro University

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (669.141 KB) | DOI: 10.14710/mkts.v13i2.3914

Abstract

Impact happened waving tsunami result very big loss of soul good and material and damage of nature and by psycology very harming for hit by society is accident. As does which have experienced of State of specially at Provinsi of Nangroe Darusalam, Sumatra North, Banyuwangi Ciity which have experienced of earthquake disaster and wave of tsunami. With existence of mentioned of hence needing the existence of effort which must be done to lessen risk of effect of earthquake disaster and wave of tsunami. Intention of this article is to give input of in the form of operation model alternatively to lessen risk of effect of wave of tsunami. Approach of operation model cover Early Information System warning, House Podium, Infill Escape Hill, Green Belt, Sea Wall or Dam, with approach of the model if executed hence risk faced will decrease. Keywords: approach of operation model, tsunamiPermalink: http://ejournal.undip.ac.id/index.php/mkts/article/view/3914[How to cite: Sriyana, 2005, Pendekatan Model Pengendalian untuk Mengurangi Risiko Akibat Gelombang Tsunami, Jurnal Media Komunikasi Teknik Sipil, Volume 13, Nomor 2, pp. 106-113]
Uji Kriteria Manajemen dalam Pengelolaan Air Limbah Domestik Terpusat Siswati, Muji; Syafrudin, Syafrudin; Sriyana, Sriyana
MEDIA KOMUNIKASI TEKNIK SIPIL Volume 23, Nomor 1, JULI 2017
Publisher : Department of Civil Engineering, Diponegoro University

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (277.222 KB) | DOI: 10.14710/mkts.v23i1.12780

Abstract

Sanitation infrastructure is one of the basic needs of society and has a strategic role in improving the health and welfare of the community. The Indonesian government has built centralized domestic waste water infrastructure in 13 cities until 2014. According to USAID (2006) and AusAID (2013), idle capacity and cost recovery in the centralized domestic waste water system is still a major problem. Therefore, it needs to be done assessment management criteria of centralized domestic waste water management. This research is done by three-stage, that is construction models of a relationship of interdependence between management criteria; assessment of model suitability that has been constructed using SEM method; and calculate the weight of each management criteria using ANP method. The management criteria used on this study consist of: performance management, technical, institutional, regulatory, financing, and public participation. The weight of each criteria using models that have been assessment for their suitability, are: performance management (75.37%), financing (8.83%), public participation (8.39%), technical (3.56%), regulatory (2.36%) and institutional (1:49%). The global weight of sub criteria with most critical weight and should be a priority concern are sustainability (48.20%), public acceptance (14.90% 0, reliability (9.30%), willingness to pay (5.20%), and cost recovery (4.62%).
PENELITIAN KERUSAKAN UNIT LAPIS LINDUNG PEMECAH GELOMBANG TERHADAP BERBAGAI SPEKTRUM GELOMBANG Sriyana, Sriyana; Hadihardaja, Iwan K.
MEDIA KOMUNIKASI TEKNIK SIPIL Tahun 15, Nomor 1, PEBRUARI 2007
Publisher : Department of Civil Engineering, Diponegoro University

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (793.428 KB) | DOI: 10.14710/mkts.v15i1.12818

Abstract

Determination of the amount of damage in the armour layer unit of breakwater is highly affected by wave spectrum generated. This research is aimed at knowing the influence of many kind of wave spectrum toward the amount of damage in the armour layer unit. This study is carried out by means of irregular non-breaker waves on physical modeling. The spectrums used on irregular waves are Pierson Moskowitz, Bretschneider, Jonswap, and Darbyshire, employing tetrapod, cubes, and rubble mound as the armour layer. The result of the test model indicate that Darbyshire spectrum have largest potential to destroy the stability of armour layer more than spectrum Jonswap, Pierson Moskowitz, Bretschneider.
USING STORY MAPPING TECHNIQUE TO IMPROVE STUDENTS’ PARTICIPATION IN READING COMPREHENSION OF NARRATIVE TEXT Sriyana, Sriyana; Ikhsanudin, Ikhsanudin; Bunau, Eusabinus
Jurnal Pendidikan dan Pembelajaran Khatulistiwa Vol 7, No 12 (2018): Desember 2018
Publisher : Jurnal Pendidikan dan Pembelajaran Khatulistiwa

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (217.518 KB)

Abstract

AbstractThis research was conducted on the eleventh grade students of MAS Raudhatul Ulum Merantiin academic year 2018/2019. The aim of this research was to improve the students? participation in reading comprehension class in term of paying attention, answering question, and joining the discussion. This research used a classroom action research. The research was done in two cycles. The observation technique was used to gathered the data. The tools of data collection were observation checklist and field notes. The result showed that Story Mapping Technique was able to improve students? participation in term of paying attention, answering question, and joining the discussion. It was showed by the percentage of paying attention improved from 70% (cycle 1) to 85% (cycle 2). Meanwhile, the percentage of answering the question was improved from 65% (cycle 1) to 75% (cycle 2). And the percentage of joining the discussion was improved from 70% (cycle 1) to 80% (cycle 2). It could be concluded that the students? participation in reading comprehension class has improved through the use of Story Mapping Technique.Keywords: Participation, Story Mapping Technique, Reading Comprehension