PERHITUNGAN INDEKS KONDISI BANGUNAN DAN ANALISIS BIAYA PERBAIKAN GEDUNG AKADEMI KEPERAWATAN PANTI RAPIH PASCA GEMPA (Studi Kasus : Bencana Gempa 27 Mei 2006) Suparjo, Iih; Priyosulistyo, Hrc.; Sudarmoko, Sudarmoko
Civil Engineering Forum Teknik Sipil Vol 19, No 1 (2009): JANUARI 2009
Publisher : Civil Engineering Forum Teknik Sipil

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (194.92 KB)

Abstract

Earthquake disaster on May 27, 2006 has forced many buldings to terminate their service due to the severe damage the earthquake caused to the buildings components. Such damage requires renovation in order to restore the building performance and function. This research analyzed the renovation cost analysis for Panti Rapih Nursing Academy in Sleman Regency, Yogyakarta. This research related to building advisability after shaked by earthquacke based on the Condition Index. Analytical Hierarchy Process (AHP) was used for the analysis. Based on this method, the building Condition Index depends on two parameters. The first parameter is building component and sub component weight. The second is the damage degree and quantity, which was obtained by onsite visual assessment. This research included the analysis of renovation cost completed with factors influencing the cost based on the degree of the damage. The renovation cost was calculated by multiplying unit cost and quantity of works, which was obtained from onsite results of the direct survey. The unit cost used refered to official cost in Regency of Sleman, Yogyakarta. Finally, the result obtained were then compared to the cost computed by contractor. Analysis results showed that the Condition Index of Nursing Academy Building was 93,5394%, which was within low damages category. In theory, the cost to restore the building Condition Index (back to 100%) was Rp. 73.160.000,00. This amount was lower than the real cost of Rp 97.680.000,00 calculated by the contractor. Such difference may be due to the different method used when calculating the quantity and unit cost of works.
SISTEM PENDUKUNG KEPUTUSAN ALTERNATIF PEMELIHARAAN GEDUNG SEKOLAH (Studi kasus: SLTP Negeri I Pakem) Priyosulistyo, Hrc.; Sudarmoko, Sudarmoko
Civil Engineering Forum Teknik Sipil Vol 18, No 1 (2008): JANUARI 2008
Publisher : Civil Engineering Forum Teknik Sipil

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (271.959 KB)

Abstract

The performance of the building declines in line with the age of the building. To maintain the performance of the building, the building maintenance should be carried out. For this reason, an adequate program that able to analyze cost as well as condition of the building has been developed in this research. The assessment was carried out in a secondary school building in Pakem Sub Regency of Yogyakarta. The research used Analyzes of Hierarchy Process (AHP). Besides, the maintenance cost was also considered in the analysis. The secondary school has several buildings. Each building consists of structural, architectural and utilities components. This research mainly studied the performance of the architectural components rather than other components. The architectural components consists of classrooms, office rooms and supporting rooms. In every room, architectural element such as ceiling, wall, window, door and floor are subdivided into their accompanying elements. The elements were then weighted in accordance with their functions. The severities of their conditions were assessed in terms of percentage of the deterioration. The residual condition was determined by reducing the index condition (100 is best condition). The accumulative index condition was then represented the condition of every room. The determination of the priority was carried out on the basis of the ratio between increment of the condition (from the existing condition to the best condition) and the cost implied on the maintenance. The priority would go to the highest ratio. An analysis result indicate that among 37 rooms perceived, the class rooms obtained first priority followed by office room and then supporting room. The three first sequence priority among sixteen class rooms are classroom VIIA, the natural science laboratory and classroom IIIA. Among four rooms in office room groups, three first priority are Teacher room, Administration room, Headmaster room, and among seventeen room of supporting room groups, the three first priorities are parking area, canteen room, medical room.
Kontekstualisasi Pilkada Riau: Sosiokultural, Relasi Klientalistik dan Indikasi Politik Uang Misra, Fauzan; Sudarmoko, Sudarmoko; Apriwan, Apriwan; Hakim, Amri; Ichsan Kabullah, Muhammad; Rahman, Fajri
Integritas : Jurnal Antikorupsi Vol. 7 No. 1 (2021): INTEGRITAS: Jurnal Antikorupsi
Publisher : Komisi Pemberantasan Korupsi

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.32697/integritas.v7i1.724

Abstract

The local election as an electoral competition cannot be separated from the threat of money politics. This study tries to identify the amount of money politics received by voters in the Pemilukada. This is important considering that there are no clear parameters in calculating the real costs incurred by candidates in the Pemilukada. The results of the study indicate that sociocultural factors play an important role in the local elections in Riau. This study also found that there are three types of clientelistic relationships that are built, namely ethnicity-based relationships, broker-based relationships, and constituent service-based relationships.