Wateno Oetomo
Direktorat Jenderal Bina Marga Kementerian Pekerjaan Umum dan Perumahan Rakyat

Published : 1 Documents Claim Missing Document
Claim Missing Document
Check
Articles

Found 1 Documents
Search

Analisis Waktu dan Biaya dengan Metode Crash Duration pada Keterlambatan Proyek Pembangunan Jembatan Sei Hanyu Kabupaten Kapuas Wateno Oetomo; Priyoto Priyoto; Uhad Uhad
Media Ilmiah Teknik Sipil Vol 6 No 1 (2017): Media Ilmiah Teknik Sipil
Publisher : ​Institute for Researches and Community Services Universitas Muhammadiyah Palangkaraya

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (921.159 KB) | DOI: 10.33084/mits.v6i1.262

Abstract

In analyzing the comparison of the cost of acceleration with the acceleration time used by the method Time Cost Trade Off. The analysis is done by using / shortening (crashing) time of implementation by using an alternative to increase working hours (overtime) for 3 hours. With apply the TCTO analysis, the implementation of the construction of the Sei Hanyu Bridge project after its duration performed calculations using the crash duration method, it was found that the time needed to accelerate the construction of the Sei Hanyu Bridge in Kapuas Regency for 1038 calendar days(148 weeks), can be accelerated 44 days from the original planning 1082 calendar days (155 weeks). With the acceleration of the completion of the construction of the Sei Hanyu bridge in Kapuas Regency, an additional fee of Rp. 175,160,710.43 is required with an additional cost (cost slope) of Rp 3,980,925.24 per day for 44 days, so the optimal costs needed to accelerate the construction of the Sei Hanyu bridge in Kapuas Regency was Rp. 45,102,729,928.11 originally planned for Rp.44,927,569,217.68