PENYELIDIKAN POLA ALIRAN EMBUNG SAMIRAN DENGAN UJI MODEL HIDROLIK FISIK Ari Wulandari, Dyah; Kirno, Kirno
TEKNIK Volume 31, Nomor 1, Tahun 2010
Publisher : Diponegoro University

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (2869.163 KB) | DOI: 10.14710/teknik.v31i1.1753

Abstract

Samiran Dam is located in Grawah river, Boyolali Regency, Central Java Province. The aim of Samiran Damis for service water supply. The hydraulic model test are conducted for clarifying the appropriateness ofhydraulic design, to perfect and optimize the hydraulic design of the spillway. One of the main objective is tostudy the flow pattern approaching spillway, at spillway, stilling bazin and river in the downstream of thestilling bazin.The detail model is made as three dimensional model, covering the part of reservoir, spillway, stilling bazin andriver in the downstream of spillway. The hydraulic model test was carried out in The Hydraulic Laboratory ofExperimental Station for River in Surakarta.Base on the study result then there are necessary to modified design of the stilling bazin and to add groundsillconstruction at the river in the downstream of the stilling bazin
Keakuratan Prediksi Inflow Waduk Dengan Neraca Air Waduk Wulandari, Dyah Ari; Budieny, Hary; Kurniani, Dwi
TEKNIK Vol 37, No 2 (2016): (Desember 2016)
Publisher : Diponegoro University

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (287.872 KB) | DOI: 10.14710/teknik.v37i2.12613

Abstract

Dalam perhitungan inflow waduk sering digunakan persamaan neraca air waduk yang menggunakan data seri laporan harian operasi waduk, evaporasi dan curah hujan diwaduk, dan lengkung H-V-A waduk. Pada pengamatan data series laporan harian operasi waduk dan pengukuran kapasitas tampungan waduk, dapat terjadi kesalahan yang disebabkan karena kesalahan faktor manusia maupun faktor alat, hal ini akan menyebabkan kesalahan pula pada besarnya inflow waduk yang dihasilkan. Lebih lanjut di dalam perencanaan, data series inflow waduk ini diperlukan sebagai input pada pemodelan optimasi operasi waduk dan sedimentasi waduk, sehingga keakuratan datanya sangat diperlukan. Tujuan penelitian ini adalah untuk mengevaluasi tingkat akurasi penggunaan neraca air waduk dalam memprediksi inflow waduk. Untuk mengetahui tingkat akurasi dilakukan dengan membandingkan antara inflow waduk dari anak sungai hasil pengukuran dan hasil hitungan dengan persamaan neraca air waduk. Kemudian dilakukan variasi periode pengukuran dan kurva H- V-A yang digunakan. Berdasarkan penelitian yang dilakukan maka pada periode perhitungan yang lebih lama menghasilkan tingkat error yang lebih kecil. Pemakaian kurva waduk yang berbeda menghasilkan inflow yang berbeda. Tingkat error yang didapat masih cukup besar, diatas 30 %, sehingga perhitungan inflow waduk dari anak sungai dengan menggunakan metode neraca air waduk kurang akurat. [Title: Accuracy of Reservoir Inflow Prediction Using Reservoir Water Balance] In the calculation of reservoir inflow often used reservoir water balance equation using the data series of daily reports reservoir operation, evaporation and precipitation, and H-V-A curve. In observation of the data series of daily reports of reservoir operation and measurement of reservoir storage capacity, the errors may occur due to human error factor and factor appliance. This will cause an error on the reservoir inflow generated. Further, in the planning, this series data of reservoir inflow is required as input to the modeling of reservoir operation optimization and reservoir sedimentation, so the accuracy of the data are required. The purpose of this study was to evaluate the use of the reservoir water balance accuracy rate in predicting inflow. To determine the level of accuracy, the effort is done by comparing the inflow tributary reservoirs of measurement and the count with the reservoir water balance. Then perform variations of the measurement period and curves H-V-A is used. Based on the research conducted in the period longer calculation produces a smaller error. The different H-V-A curve results in the different inflow. Error rate obtained is still quite large, above 30%, so the calculation of tributary inflow reservoirs using reservoir water balance method is less accurate.  
Analisis Aplikasi Kantong Lumpur pada Sungai Sebagai Upaya Pengendalian Sedimentasi Waduk Wulandari, Dyah Ari; Ulfiana, Desyta; Parmantoro, Priyo Nugroho
MEDIA KOMUNIKASI TEKNIK SIPIL Volume 26, Nomor 2, DESEMBER 2020
Publisher : Department of Civil Engineering, Diponegoro University

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (595.364 KB) | DOI: 10.14710/mkts.v26i2.28691

Abstract

Sedimentasi waduk dapat diatasi dengan mengurangi jumlah sedimen yang masuk ke waduk, dengan membangun check dam. Akan tetapi check dam lebih banyak mengendapkan muatan sedimen kasar daripada muatan sedimen halus. Sedimen halus yang lolos dari check dam akan ikut aliran lebih lanjut dan akhirnya masuk ke dalam kolam waduk. Oleh karena itu perlu dibuat bangunan yang dapat menangkap sedimen halus. Konstruksi direncanakan seperti sistem kantong lumpur pada saluran irigasi. Tujuan dari penelitian ini adalah menganalisis kemungkinan pengaplikasian sistem bangunan kantong lumpur pada sungai untuk mengendapkan sedimen yang lolos dari chek dam. Analisis dimulai dengan pemilihan lokasi sedimen trap, kemudian dilakukan perhitungan dimensi sediment trap dan jumlah sedimen yang mengendap. Berdasarkan analisis pada dimensi yang dipilih dengan beberapa kombinasi gradasi butiran sedimen, pengendapan sedimen  yang terjadi berkisar antara 42 – 68 %. Sehingga dapat disimpulkan pembuatan sedimen trap di sungai dapat dilakukan. Akan tetapi untuk pengaplikasian sedimen trap ini perlu penelitian lebih lanjut lagi terkait dimensi sedimen trap yang paling optimal mengendapkan sedimen.
PENINGKATAN PEMANFATAAN DANAU RAWA PENING Dyah Ari Wulandari; sriyana sriyana; Salamun Salamun; Dwi Kurniani; Albert Nico Tristanto; Zelly Rinaldi
TERAS JURNAL Vol 11, No 2 (2021): Volume 11 Nomor 2, September 2021
Publisher : UNIVERSITAS MALIKUSSALEH

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.29103/tj.v11i2.477

Abstract

Abstrak Danau Rawa Pening mempunyai peranan sebagai reservoir alami yang dimanfaatkan untuk PLTA, sumber air baku, irigasi, perikanan, dan pariwisata serta pemeliharaan Sungai Tuntang. Salah satu permasalahan di Danau Rawa Pening adalah sedimentasi yang berdampak pada menurunnya kapasitas tampungan, oleh karena kondisi Danau Rawa Pening saat ini maka diperlukan upaya penanganan untuk meningkatkan pemanfaatan Danau Rawa Pening guna mendukung kegiatan irigasi pertanian, perikanan, pariwisata, supply air baku dan pembangkit listrik. Tujuan dari penelitian ini adalah untuk menganalisis peningkatan pemanfaatan Danau Rawa Pening yang merupakan waduk alami, tidak mempunyai intake dan pelimpah seperti waduk – waduk pada umumnya. Pengaturan outflow dari danau ada di Bendung Gerak Jelok yang berjarak ± 5 km dari outlet danau. Oleh karena itu peningkatan pemanfaatan danau akan dilakukan dengan membuat intake dan pelimpah sehingga pengeluaran dapat diatur sesuai kebutuhan yang diperlukan Tahapan analisis yang dilakukan adalah analisis kebutuhan air, analisis ketersediaan air, analisis laju sedimentasi, analisis kebutuhan tampungan dan analisis kinerja. Berdasarkan hasil analisis peningkatan pemanfaatan Danau Rawa Pening dapat dilakukan dengan membuat intake pada elevasi + 460,5 m dan pelimpah pada elevasi puncak + 462,72 m. Pada kondisi ini dapat disediakan tampungan efektif sebesar 31,9 juta m3, tampungan mati sebesar 1,264 juta m3 dan tampungan utk perikanan dan pariwisata sebesar 10,311 juta m3, dengan kinerja pelayanan 89%.Kata kunci: Sedimentasi, peningkatan pemanfataan danau, Danau Rawa Pening Abstract Lake Rawa Pening has a function as a natural reservoir that is used for hydropower plants, raw water, irrigation, fisheries, tourism and maintenance of the Tuntang River. The problems in Lake Rawa Pening is sedimentation which has an impact on decreasing storage capacity. Because of the current condition of Lake Rawa Pening, efforts are needed to improve the use of Lake Rawa Pening to support irrigation, fisheries, tourism, raw water supply and power generation. The purpose of this study was to analyze the increase in the utilization of Lake Rawa Pening. Lake Rawa Pening is a natural reservoir, does not have intake and spillway like ather reservoirs in general. The outflow arrangement from the lake is at Jelok Weir which is ± 5 km from the lake outlet. Therefore, increasing the use of lakes will be carried out by building intake and spillway so that release can be adjusted according to the demand. The stages of the analysis carried out are water demand analysis, water availability analysis, sedimentation rate analysis, storage needs analysis and performance analysis. Based on the results of the analysis of increasing utilization of Lake Rawa Pening, it can be done by building intake at an elevation +460.5 masl and spillway at elevation of +462.72 masl. In this condition, an effective storage capacity of 31.9 million m3, a dead storage capacity of 1,264 million m3 and a storage for fisheries and tourism of 10.311 million m3 can be provided, with performance of 89%.Keywords: Sedimentation, Increased use of the lake, Lake Rawa Pening
PENATAAN DRAINASE DTA WADUK DIPONEGORO (RW 2 KELURAHAN TEMBALANG) Desyta Ulfiana; Suripin Suripin; Dyah Ari Wulandari; Sri Sangkawati Sachro; Suharyanto Suharyanto; Rudi Yuniarto Adi
Jurnal Pasopati : Pengabdian Masyarakat dan Inovasi Pengembangan Teknologi Vol 2, No 2 (2020)
Publisher : Fakultas Teknik Universitas Diponegoro

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

DTA Waduk Pendidikan Diponegoro merupakan wilayah yang berkembang pesat akibat berdirinya Universitas Diponegoro. Hali ini membawa dampak buruk akibat berkurangnya daerah resapan air di wilayah tersebut. Beberapa titik lokasi di DTA sering mengalami genangan air atau banjir saat musim hujan. Hal ini sangat mengganggu aktivitas warga. RW 2 Kelurahan Tembalang merupakan salah satu lokasi di DTA Waduk Diponegoro yang sering mengalami banjir. Berdasarkan hasil survey terdapat tiga titik rawan banjir/genangan di kawasan ini yaitu di Masjid Miftahurrohmah, Gg Maerasari 2 dan Masjid LPPU. Banjir/genangan tersebut disebabkan oleh lokasi titik yang lebih rendah dari kawasan sekitar sehingga menerima limpasan air hujan yang cukup besar saat hujan sedangkan saluran drainase eksisting tidak mampu menampung limpasan air hujan tersebut. Oleh karena itu, perlu dilakukan penataan kembali dan peningkatan fungsi jaringan drainase di DTA Waduk Diponegoro. Penataan drainase dilakukan dengan merencanakan jaringan saluran drainase baru serta melakukan perhitungan dimensi saluran sesuai dengan perhitungan debit limpasan air hujan. Hasil survey dan perencanaan penataan drainase ini kemudian disosialisasikan kepada warga RW 2 Kelurahan Tembalang. Hasil sosialisasi yang dilakukan dapat memberikan informasi terkait kondisi drainase RW 2 Kelurahan Tembalang dan memberikan solusi serta pengarahan kepada masyarakat dalam penataan drainase lingkungan mereka.
Rasionalisasi Pos Curah Hujan Menggunakan Metode Kagan di DAS Ciliwung untuk Operasi Bendungan Ciawi dan Sukamahi Propezite Nurhutama Mustain; Dyah Ari Wulandari; Hari Nugroho; Suripin Suripin
Bentang : Jurnal Teoritis dan Terapan Bidang Rekayasa Sipil Vol 11 No 1 (2023): BENTANG Jurnal Teoritis dan Terapan Bidang Rekayasa Sipil (Januari 2023)
Publisher : Universitas Islam 45

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33558/bentang.v11i1.5614

Abstract

Hydrological stations are an important element in order to provide preliminary information to dam managers in planning and managing dams. Rainfall data generated from rainfall stations is one of the inputs in hydrological analysis that can be used in dam management. To support the hydrological analysis, an appropriate network of rainfall stations is needed, both in terms of the number and location of rainfall stations. Therefore, it is necessary to study the rationalization of the hydrological station network within the Ciliwung Watershed, so that it can be utilized in dam operations. The purpose of this study is to obtain an efficient and effective network of rainfall stations in the Ciliwung watershed to support the operation of the Ciawi and Sukamahi Dams. In this case, the Kagan method was used in the analysis of the rationalization of the rainfall station network by producing the optimum number of rainfall stations in the Ciliwung watershed, that is 29 rainfall stations. Based on these results, the number of rainfall stations in the Ciliwung watershed has met in terms of number, but the location point needs to be adjusted to the Kagan triangle.
PENINGKATAN KINERJA WADUK KEDUNGOMBO DENGAN MENGEMBALIKAN KAPASITAS TAMPUNGANNYA bramantyo herawanto; Suripin Suripin; Dyah Ari Wulandari
Racic : Rab Construction Research Vol 8 No 1 (2023): JUNI
Publisher : LPPM Universitas Abdurrab

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.36341/racic.v8i1.2817

Abstract

In every reservoir plan, the volume of dead storage provided is always taken into account to accommodate sediment entering the reservoir during the service life of the reservoir. Several studies on reservoir sedimentation show that 70% of reservoirs have sedimentation problems so the effective life of the reservoir will end before the design life is reached. The rate of sediment entering the reservoir will settle in the dead reservoir and the effective reservoir which will affect the performance of the reservoir. Therefore, it is necessary to take measures to improve the performance of the reservoir, one way is to restore its effective reservoir. Based on the results of bathymetry measurements of the Kedungombo Reservoir from 1989 to 2017, the sediment rate was 1.954 million m3/year. From the analysis of sediment distribution, the dead reservoir of the Kedungombo Reservoir at an elevation of +65.00 will be filled in 2089. The effective reservoir in 2089 at a normal water level of +90.00 of 527.71 million m3 has decreased by 106.89 million m3 from the initial effective reservoir is 634.6 million m3. To improve reservoir performance by restoring its effective reservoir, the Kedungombo Reservoir requires an elevation of the overflow or normal water level as high as 2.26 m with an inundation area of ​​48.72 million m2. Keywords: Sediment Distribution, Storage Capacity, Reservoir Performance, Kedungombo Reservoir