Claim Missing Document
Check
Articles

Found 2 Documents
Search

PENERAPAN STUDI REKAYASA NILAI PADA PERENCANAAN STRUKTUR ATAP GEDUNG SERBA GUNA UNIVERSITAS MUHAMMADIYAH MALANG Retno, Dyah; Hastuti, Hermy Dyah
Jurnal Teknik Industri Vol 3, No 2 (2002)
Publisher : Department Industrial Engineering, University of Muhammadiyah Malang

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (3392.417 KB) | DOI: 10.22219/JTIUMM.Vol3.No2.121-130

Abstract

This research will apply value engineering study in planing roof Astructure of UMM's Multi Function Building (GSG). The planing includes roof geometry and material used as roofcover and skeletons. Steps taken includes information stage that have goal in determining criteria necessary in planing the roof structure and weight of the criteria,creativity stage in which we will develop roof structure altematives as many as possible by using FAST diagram,and then evaluation stage in which we will make assessment on those altematives by using feasibility and evaluation matrix, performance calculation,and calculation of cost required by respective altematives.In development st age we will make value calculation of respective alternatives, inwhich an altemative with the highest value will be chosen as proposal for roof of UMM's Multi Function Building.
IDENTIFIKASI CACAT PADA GENTENG WENDIT DENGAN DIAGRAM PARETO Retno, Dyah
Jurnal Gamma Vol 4, No 2 (2009): Maret
Publisher : Jurnal Gamma

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (112.359 KB)

Abstract

One of centrale of home industry in Malang is UD. BJ Mendit on Mendit Barat, Kec. Pakis withit?s roof production process. From the observation that the researcher do into UD. BJ Mendit,finded that the production process had been doing often with technical and non technical problemsthat make some failed roof product. Purposes of this research are identifying types of roof failedproduct, analysing main cause of roof failed product with Pareto diagram. From the steps had done,finded that the biggest failed criterion is keropos. Keropos is caused by lack of skill and correctnessof worker on processing the raw material, can also caused by process execution which not fullycorret so that produce critical process to be repaired first to increase the quality of Mendit?s roof.