Studi Kelayakan Investasi Proyek Perumahan pada Proyek Pembangunan Perumahan Aura Tirta Graha Banjarnegara Priyo, Mandiyo
Semesta Teknika Vol 15, No 2 (2012): NOVEMBER 2012
Publisher : Universitas Muhammadiyah Yogyakarta

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.18196/st.v15i2.1324

Abstract

The aim of this study is to evaluate the cash flow and the feasibility of the building investment project of Perumahan Aura Tirta Graha Banjarnegara. The data used in this study were collected from the contractor. The collected data were classified into two groups: primary and secondary data. The primary data cover the direct detailed examination of the research objectives. The data were collected by doing interview and observation. On the other hand, the secondary data were the historic data dealing with the plan and implementation of the project. In this study, there were several methods carried out in measuring the criterion of investment feasibility, i.e.: Break Event Point (BEP), Net Present Value (NPV), Internal Rate of Return (IRR), Payback Period (PP), and Profitability Index (PI).  Evaluation results show that every method demonstrated various performance of the investment appropriateness. From the analysis, it can be concluded that the development plan of Perumahan Aura Tirta Graha Banjarnegara has been carefully analyzed and properly implemented.
Aplikasi Value Engineering pada Proyek Konstruksi (Studi Kasus: Proyek Pembangunan Gedung BPKP Yogyakarta) Priyo, Mandiyo; Hermawan, Totok Dwi
Semesta Teknika Vol 13, No 2 (2010): NOVEMBER 2010
Publisher : Universitas Muhammadiyah Yogyakarta

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.18196/jst.v13i2.711

Abstract

Construction of a building project or the others structures needs cost, so that the project can be realized. Before an owner continues the project to the design or construction steps, the cost must be provided. The cost often becomes a problem because amount of the cost is limited to realize a construction project. The objective of this study is to select good alternative materials without declining the quality and function of the building as well as to find the value of cost efficiency on the Project of the BPK’s Office Building Construction of Yogyakarta by Value Engineering method. Value Engineering is a management thenique with systematic approach for finding the balance among cost, reliability, and performance of a product or a project. The study on the Project of the BPKP’s Office Building Construction of Yogyakarta was done on the structure work only, namely: plate, beam, column and sloof works with giving alternative materials for getting the best alternative by work plan of Value Engineering. The Value Engineering method was applied on structure components by systematic and creative approach trough work plan of Value Engineering using the following steps: an information, functional analysis, creative, development, writing and presentation steps. All steps were done continuesly and the result was expected giving efficiency from the previous design. From the application of Value Engineering, it is concluded that the cost efficiency is about 2.53% of total cost of structure work by application.