Delka Octiriani
Fakultas Teknik Program Studi Teknik Sipil Universitas Abdurrab

Published : 1 Documents Claim Missing Document
Claim Missing Document
Check
Articles

Found 1 Documents
Search

Analisis Kinerja Ruas Jalan Terhadap U-Turn di Kota Pekanbaru Husni Mubarak Husni; Doni Rinaldi Basri; Delka Octiriani
Civil Engineering Scientific Journal Vol 2, No 1 (2023): Civil Engineering Scientific Journal
Publisher : Jurusan Teknik Sipil, Fakultas Teknik, Universitas Borneo Tarakan

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (542.234 KB) | DOI: 10.35334/cesj.v2i1.3324

Abstract

ABSTRACT: As a result of the closure of the U-Turn, the people around Jalan HR. Soebrantas complained because the travel time they took was very long and there was a buildup of vehicles at the U-Turn intersection of Jalan Manggis. The problem in this study is how is the condition of the U-Turn in front of the handsome Nurul Huda Mosque today . and how to overcome the U-Turn delay in front of the Nurul Huda Mosque . The method used in this study is analysis of existing traffic performance, analysis of traffic performance, applying 3 alternatives , proposing alternative problem solving, alternative problem solving based on the results of HR Road Performance Comparison. Soebrantas, it is obtained that the average degree of road saturation is 0.80, and the service level is D: The flow is approaching unstable, the speed is still tolerable. Alternative 2, the solution to the problem for this research, namely by widening the road in front of the shops This plan affects traffic performance to run smoothly as happened on the Purwodadi road section, but this is still hampered due to land acquisition if it is carried out along the HR road. Soebrantas. Alternative 3, using vissim simulation for U-Turn closure This plan is the final plan, but if this plan is carried out, you must plan for a Fly Over at the Tobek Godang red light intersectionKeywords: Alternative , U-Turn, Road performance