Bramantyo Herawanto
Universitas Diponegoro

Published : 1 Documents Claim Missing Document
Claim Missing Document
Check
Articles

Found 1 Documents
Search

Penilaian Risiko Kegagalan Bendungan Dan Tindakan Pengurangan Risiko Pada Bendungan Nglangon: Risk Assessment Of Dam Failure And Risk Reduction Measures At Nglangon Dam Bramantyo Herawanto; Suripin Suripin; Dyah Ari Wulandari
Media Ilmiah Teknik Sipil Vol. 11 No. 1 (2023): Media Ilmiah Teknik Sipil
Publisher : ​Institute for Researches and Community Services Universitas Muhammadiyah Palangkaraya

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33084/mits.v11i1.4071

Abstract

The dam failure that has been operating has a great potential to occur if the administrator does not carry out proper maintenance. Dams require proper and correct maintenance and operation which will greatly affect the safety of the dam itself. Especially for dams that have been operating for a long time, major maintenance activities including repairs and rehabilitation are urgently needed to avoid the worst conditions such as facing natural disasters. Because a dam can cause a large impact if it fails, it is necessary to have a risk assessment to analyze and evaluate the hazard of the dam. Risk research conducted at the Nglangon Dam uses the event tree method, traditional and modified ICOLD. Based on the results of individual and group extreme probability analysis, both traditional and event tree methods, the risk probability value is above the acceptable risk value threshold of 1.00E-05, which means that the Nglangon Dam requires further action. This is in line with the results of the ICOLD modified risk assessment method with classification III (high) which means that the Nglangon Dam is included in a dam that requires special attention and corrective actions to reduce the level of risk in the Nglangon Dam