Articles

Found 29 Documents
Search

ANALISIS WASTE MENGGUNAKAN METODE VALUE STREAM ANALYSIS TOOLS PADA PROYEK PEMBANGUNAN INSTALASI GAWAT DARURAT RSUD PIDIE JAYA Sheragizca Yolanda Situmeanga; Muhammad Afifuddin; Hafnidar A. Rani
Jurnal Arsip Rekayasa Sipil dan Perencanaan Vol 4, No 2 (2021): Jurnal Arsip Rekayasa Sipil dan Perencanaan
Publisher : Prodi Magister Teknik Sipil Unsyiah

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24815/jarsp.v4i2.16728

Abstract

Construction project is a long process activity where the researcher finds obstacles which cannot be separated from the used resources. Everything in the projects which may add the needed costs called by the term waste. In the project implementation of Regional Public Hospital (IGD) construction project in Pidie Jaya, there was a significant delay in the project schedule which could be caused by several things which may  lead the project into waste construction. This is the main reason why does the Value stream analysis tools (VALSAT) method was used during the research in order to identify the cause of occuring waste. This goal of this research is to identify the waste which potentially occure during the  Regional Public Hospital (IGD) project in Pidie Jaya. Besides, this research is also determine the grade and tool waste by using the VALSAT. Based on the literature review, there are 8 wate categories  which could be reviewed based on materials, labor and tools used during the project. The identified waste data are obtained by the interview conducted to 4 respondents and questionaire with 15 respondents and handed out to contratctors. Based on the result and data processing which using descriptive analysis, it can be concluded that the most influential waste on the project was waste waiting and waste overprocessing which obtain a value of 5 and cause the excessive effects on the project. Furthermore, the result of the grade analysis and tool waste determination by using the VALSAT method produced a process Acivity Mapping to analyze the occuring waste that occurs with a total score of 135. 
ANALISIS EFISIENSI DINDING PENAHAN TANAH TYPE KANTILEVER DI KECAMATAN BABAHROT KABUPATEN ACEH BARAT DAYA Bambang A. Sadat; Muhammad Isya; Hafnidar A. Rani
Jurnal Arsip Rekayasa Sipil dan Perencanaan Vol 1, No 1 (2018): Jurnal Arsip Rekayasa Sipil dan Perencanaan
Publisher : Prodi Magister Teknik Sipil Unsyiah

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24815/jarsp.v1i1.10331

Abstract

The retaining wall is a retaining construction so that the soil does not slide. This construction is used for a cliff that is somewhat steep or erect, if without a retaining wall, the cliff will slide. Southwest Aceh Regency, especially in Babahrot-Blangkejeren road, Singgah Mata Mountains of Babahrot Subdistrict often experience landslide disaster. The cantilever type retaining wall is considered to be better against the structure and is suitable for use in mountain areas. However, a construction project generally requires substantial cost, therefore the selection of appropriate construction can provide efficiency to prevent loss and yields that are less than optimal. Based on that, it is necessary to analyze the cost estimation of retaining wall construction on mountain cliff, in this case using cantilever method. Functionally, the estimated cost is also intended for the calculation of the volume of work, the preparation of budget plans and scheduling in the implementation process of a construction project activity. This research was conducted to calculate dimension and cost estimation of cantilever type retaining wall construction with representation of segment that exist in surrounding mountain cliff of Babahrot-Blangkejeren road STA 13 + 850 - 13 + 895 Singgah Mata mountains at Babahrot Subdistrict, Southwest Aceh Regency. By obtaining wall dimension data from previous measurements and planning, this study analyzes and estimates the volume, cost, efficiency of the cantilever type retaining wall construction. From result of research indicate with planning, minimum safety factor required sf greater than 1,5, hence budget cost for cantilever type wall worth Rp. 1.109.438.000, -.
Optimalisasi Waktu Dan Biaya Dengan Metode Precedence Diagram Method (Studi Kasus: Pembangunan Gedung Fisip Unsyiah) Tamalkhani Syammaun; Hafnidar A. Rani; Fadhil Rahmat
Tameh: Journal of Civil Engineering Vol 8 No 1 (2019): Juni
Publisher : Department of Civil Engineering, Faculty of Engineering, University of Muhammadiyah Aceh

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (563.302 KB) | DOI: 10.37598/tameh.v8i1.62

Abstract

Waktu dan biaya sangat berpengaruh terhadap keberhasilan dan kegagalan suatu proyek. Tolak ukur keberhasilan proyek biasanya dilihat dari waktu penyelesaian yang singkat dengan biaya yang minimal tanpa meninggalkan mutu hasil pekerjaan. Oleh karena itu, salah satu usaha untuk mengoptimalisasi waktu dan biaya adalah dengan menggunakan metode Precedence Diagram Method (PDM). Pembangunan Gedung Fakultas Ilmu Politik dan Ilmu Sosial Universitas Syiah Kuala ini dibangun III (tiga) lantai dengan anggaran proyek adalah sebesar Rp. 3.607.020.000,00 (Tiga Milyar Enam Ratus Tujuh Juta Dua Puluh Ribu Rupiah) dengan waktu pelaksanaan selama 10 bulan sesuai dengan time schedule dan kurva-S. Permasalahan dalam penelitian ini adalah membandingkan waktu dan biaya antara perencanaan (time schedule dan kurva-S) dengan metode PDM. Tujuan penelitian ini adalah untuk mengetahui durasi (waktu) optimum, mengetahui biaya yang diperlukan untuk pelaksanaan proyek serta membandingkan waktu dan biaya proyek antara perencanaan (time schedule dan kurva-S) dengan metode PDM. Metode penelitian dalam perencanaan ini dimulai dengan pengumpulan data berupa data sekunder, untuk analisa dan pengolahan data secara manual dimulai dengan perhitungan PDM kemudian dilanjutkan dengan perhitungan float dan jalur kritis. Hasil perhitungan waktu dengan metode PDM diperoleh waktu penyelesaian proyek selama 232 hari lebih cepat 23 hari dari metode kurva-S. Hasil perhitungan biaya secara total dengan menggunakan metode PDM diperoleh biaya sebesar Rp.3.226.282.572 lebih murah dibandingkan dengan menggunakan metode kurva-S dengan selisih biaya Rp.52.829.994,6. Hasil Perhitungan float dan jalur kritis pada penelitian ini dengan metode PDM memperlihatkan bahwa semua kegiatan tidak terdapat float dan semuanya jalur kritis dibandingkan dengan metode kurva-S terdapat float dan tidak semuanya jalur kritis pada semua kegiatan. Dengan demikian, metode PDM dapat mengoptimalkan waktu dan biaya.
Penerapan Sertifikasi Laik Fungsi Terhadap Bangunan Publik di Kota Banda Aceh Hafnidar A Rani; Muhammad Hanif
Tameh: Journal of Civil Engineering Vol 10 No 1 (2021): Juni
Publisher : Department of Civil Engineering, Faculty of Engineering, University of Muhammadiyah Aceh

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (850.615 KB) | DOI: 10.37598/tameh.v10i1.120

Abstract

Sertifikasi Laik Fungsi (SLF) adalah sertifikat yang diberikan oleh Pemerintah Daerah terhadap bangunan gedung yang telah selesai dibangun dan telah memenuhi persyaratan kelaikan fungsi bangunan, demikian juga kelaikan bangunan publik di Kota Banda Aceh. Permasalahan penelitian ini adalah apakah pemilik/pengguna gedung mengetahui tentang SLF dan apakah pemilik/pengguna gedung sudah mengetahui tentang penerapan SLF sesuai dengan Undang-Undang. Tujuan penelitian ini adalah untuk menyelidiki pemilik/pengguna gedung mengetahui tentang SLF dan untuk mengetahui pemilik/pengguna gedung sudah mengetahui tentang penerapan SLF sesuai dengan Undang-Undang. Teknik pengumpulan data dilakukan dengan menyebarkan kuisioner kepada 100 responden yaitu pemilik/pengguna bangunan publik di Banda Aceh. Variabel yang digunakan penelitian ini adalah komponen arsitektur, struktural, mekanikal, elektrikal, tata ruang luar, dan keandalan bangunan terhadap bangunan publik. Hasil analisis faktor menunjukkan korelasi antara suatu variabel dengan faktor yang terbentuk adalah > 0,5 maka faktor yang terbentuk ini mempunyai hubungan untuk merangkum keenam variabel yang dianalisis. Hasil uji validitas nilai r-tabel 0,197 memenuhi syarat r-hitung > r tabel. Hasil uji reliabilitas memenuhi syarat dengan nilai Cronbach’s Alpha lebih besar dari 0,6. Hasil analisis deskriptif menunjukkan bahwa frekuensi responden pemilik bangunan yang mengetahui tentang SLF adalah 6% dan pengguna bangunan yang mengetahui tentang SLF adalah 2%. Sedangkan frekuensi pemilik yang mengetahui tentang penerapan SLF sesuai Undang-Undang adalah 2% dan pengguna yang mengetahui tentang penerapan SLF sesuai dengan Undang-Undang adalah 1%. Hal ini mengindikasikan bahwa pengguna/pemilik bangunan publik di Kota Banda Aceh masih banyak yang belum mengetahui tentang SLF di Kota Banda Aceh dan masih belum memahami tentang penerapan SLF yang sesuai dengan Undang-Undang. Oleh karena itu Pemerintah Kota Banda Aceh perlu melakukan sosialisasi tentang penerapan SLF, terutama kepada pemilik bangunan publik.
Hubungan Faktor Sosial Ekonomi dengan Kesehatan Mental pada Anak Korban Seksual di Provinsi Aceh Nofita Yulandari; Radhiah Zakaria; M. Marthoenis; Hafnidar A. Rani; Asnawi Abdullah
Jurnal Kesehatan Komunitas Vol 8 No 3 (2022): Jurnal Kesehatan Komunitas
Publisher : LPPM Hang Tuah Pekanbaru

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.25311/keskom.Vol8.Iss3.1216

Abstract

Sexual violence against children will have an impact on the development of children's mental health and the case is like an iceberg phenomenon. this study examines the relationship between the socio-economic and mental health of child victims of sexual in Aceh Province, this type of analytic observational research uses a cross-sectional design, the population of children experiencing sexual violence is based on data from UPTD-PPA Aceh, Aceh Province in 12 districts, totaling 123 children, total population sample, the results showed that the factors associated with the development of mental health of children were the father's secondary education (OR = 3.6; p = 0.002), the father's basic education (OR = 2.8; p = 0.025), the father's occupation was self-employed (OR = 3.6; p=0.03), environmental influence (OR=2.7; p=0.009), family support was not supportive (OR=9; p=0.0001) and the counselor's behavior was not supportive (OR=2.3 ; p = 0.026), the results of the multivariate analysis concluded that children who experienced sexual abuse tend to experience abnormal mental health development 15 times greater than the other variables.  
Risk Probability of Time and Cost on Building Construction Project: A Monte Carlo Simulation Hafnidar A Rani; Jurisman Amin; Afizah Ayob; Dekky Al Rahmatillah
Jurnal Inovasi Teknologi Vol 3 No 2 (2022): October
Publisher : Engineering Forum of Western Indonesian Government Universities Board (Forum Teknik, BKS-PTN Wilayah Barat) Indonesia

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31629/jit.v3i2.5192

Abstract

Construction project has never been avoided by not only low risk but also high risk. It can also occur in building and infrastructure construction project of Aceh Regional Intelligent Agency (BINDA) office complex. The complex structural works can impact the significant risk to the project construction process. To minimize the risk, it is required to review the risk analysis to the time and the cost. The problem of the research was how many probabilities of the highest risk by using Monte Carlo. The objective of the research was to analyze the highest risk probability percentage of time and cost in building construction project by using Monte Carlo simulation. Sampling technique used was census sampling by using 18 respondents. The variables used were contractual risk, construction risk, material and equipment risk, design and technology risk, and force majeure risk. The output of risk acceptability level analysis by using probability and impact found that the dominant risk in undesirable category is wrong implementation as the highest value of 7.50 risk value. The simulation output of Monte Carlo by using @risk software resulted that project duration time was 460 days on 99% probability. For probability distribution of cost estimation resulted that budget plan estimation was IDR 1,991,000,000 on 99% probability, so the project cost estimation can get the benefit as 1.00% by using @risk simulation. Therefore, the response provided is coordination to supervision consultant and owner.
Determinan Faktor yang Berhubungan dengan Penyakit Tidak Menular pada Jemaah Haji Provinsi Aceh Saidah Saidah; Hafnidar A.Rani; Mawardi Mawardi
Sehat Rakyat: Jurnal Kesehatan Masyarakat Vol. 2 No. 1 (2023): Februari 2023
Publisher : Yayasan Pendidikan Penelitian Pengabdian Algero

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.54259/sehatrakyat.v2i1.1424

Abstract

Hajj is a worship that requires healthy physical and mental strength so that it can run all harmoniously in the Hajj, considering the long waiting time of the Hajj and the majority of pilgrims consisting of high-risk age groups and suffering from various diseases. This type of research is analytic using a cross sectional design. The population in this study were pilgrims who were examined health in 2018 as many as 4,651. Sample is the total of the population. Data collection is done using secondary data. Data was analyzed by statistical logistic regression test with stata. The results of the study revealed that 58.2% of respondents suffered from non-communicable diseases (NCD). Statistical test results found that factors related to NCD were age (OR = 1.6; P value = 0,0001), work (OR = 1.1; P value = 0.012), smoking (OR = 1.6; P value = 0,0001), central obesity (OR = 1.4; P value = 0,0001) and body mass index (BMI) (OR = 4.0; P value = 0,0001). The conclusion of the study is the variable BMI (obesity) is the most associated factor with the incidence of NCD in pilgrims with an OR of 2.1 times (CI; 1.96-2.39) so that the risk of suffering from NCD is 2 times more dominant compared to other variables. It is recommended to the government to be able to increase cooperation between the ministry of health and the ministry of religion to provide guidance, monitoring and evaluation of the implementation of health services for pilgrims
Marshall Stability of Porous Asphalt with Oyster Shell Ash Filler Substitution and High Density Polyethylene Hafnidar A Rani; Tamalkhani Syammaun; Aulina Adamy; Zulaiha Zulaiha
TERAS JURNAL Vol 13, No 1 (2023): Volume 13 No 1, Maret 2023
Publisher : UNIVERSITAS MALIKUSSALEH

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.29103/tj.v13i1.855

Abstract

Abstrak Aspal porus merupakan campuran beraspal yang memiliki rongga udara yang besar yang menyebabkan aspal porus memiliki nilai stabilitas yang rendah. Untuk meningkatkan nilai stabilitas diperlukan bahan tambah lain yang memiliki potensi seperti limbah Abu Cangkang Tiram (OSA) dan limbah High Density Polyethylene (HDPE). OSA mempunyai sifat kimia yang mengandung kapur dan silika yang berfungsi untuk keawetan dan mengunci antar agregat pada perkerasan jalan. Sedangkan HDPE memiliki kekuatan yang tinggi dan kaku serta perilaku untuk mengikat sehingga dapat memperkuat ikatan antara agregat dan OSA dan menambah perkuatan terhadap campuran aspal porus. Tujuan penelitian ini adalah untuk menentukan Kadar Aspal Optimum (OAC) pada campuran aspal porus, dan menganalisis variasi persentase terbaik OSA dan limbah HDPE sebagai substitusi aspal pen 60/70. Pengujian yang dilakukan adalah pemeriksaan terhadap parameter Marshall. Hasil penelitian menunjukkan bahwa variasi filler 50% OSA : 50% PC dengan 4%, 6% HDPE dapat meningkatkan nilai stabilitas Marshall pada campuran aspal porus serta memenuhi spesifikasi Australian Asphalt Pavement Association (AAPA). Kata kunci: aspal porus, marshall, abu cangkang tiram, HDPE   Abstract Porous Asphalt is the asphalt mix containing large air void resulting low stability of porous asphalt. The improvement of stability requires another potential additive material as Oyster Shell Ash (OSA) and High Density Polyethylene (HDPE) waste. OSA contains of chemical characteristics consisting of calcium and silica for durability and locking the aggregate and road pavement. While HDPE is rigid, high strength, and binder that it can strengthen the bond of aggregate and OSA as well as strengthen porous asphalt mix. The research aims to determine OAC to porous asphalt mix, and analyze the best percentage variation of OSA filler substitution and HDPE waste as asphalt pen 60/70 substitution. The test was carried out was Marshall Parameter investigation. The output explained that the variation of 50% OSA filler: 50% PC using 4%, 6% HDPE can improve the Marshall stability on porous asphalt mix and meet specification of Australian Asphalt Pavement Association (AAPA).   Keywords: Porous asphalt, marshall, oyster shell ash, HDPE
Pengaruh Keterlambatan Pembangunan Proyek Konstruksi Akibat Pandemi Covid-19 Tamalkhani Syammaun; Hafnidar A Rani; Jurisman Amin; Safriadi
Siklus : Jurnal Teknik Sipil Vol. 9 No. 1 (2023)
Publisher : Program Studi Teknik Sipil Fakultas Teknik Universitas Lancang Kuning

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31849/siklus.v9i1.11833

Abstract

Saat ini kondisi pandemi Covid-19 masih berdampak terhadap sektor pembangunan konstruksi. Dalam hal ini memungkinkan terjadinya keterlambatan yang disebabkan oleh peningkatan biaya, kendala dalam proses distribusi material, pengurangan jumlah tenaga kerja dan jam kerja, bahkan proyek-proyek yang berada di zona merah melakukan penghentian sementara. Permasalahan dalam penelitian ini adalah faktor dominan apa yang dapat mempengaruhi keterlambatan pembangunan proyek konstruksi akibat pandemi Covid-19. Tujuan penelitian ini adalah menganalisis faktor dominan yang mempengaruhi keterlambatan pembangunan proyek konstruksi akibat pandemi Covid-19. Teknik sampling yang digunakan yaitu teknik sampling jenuh. Variabel yang digunakan adalah variabel biaya, tenaga kerja, material, dan waktu, terdiri dari 20 indikator. Kuesioner didistribusikan kepada 36 kontraktor yang berkualifikasi kecil dan menengah. Pengolahan data menggunakan software SPSS versi 25, dengan analisis yang digunakan adalah analisis faktor, analisis deskriptif dan analisis cross-tabulation. Hasil analisis faktor diperoleh seluruh variabel valid dan reliabel. Hasil analisis deskriptif didapat faktor dominan yang berpengaruh adalah faktor tenaga kerja. Hasil analisis cross tabulation didapatkan nilai asymptotic significant rata-rata pada pearson chi-square yaitu sebesar 0,000 yaitu kurang dari 0,05. Dapat disimpulkan bahwa ketersediaan tenaga kerja ahli yang sangat sulit merupakan penyebab keterlambatan pembangunan proyek konstruksi akibat pandemi Covid-19.
Analisis Dampak Infertil terhadap Kesehatan Jiwa pada Wanita yang Sudah Menikah di Kecamatan Meurah Dua Kabupaten Pidie Jaya Tahun 2021 Nurfadhilah Nurfadhilah; Hafnidar A. Rani; Melania Hidayat
JIM: Jurnal Ilmiah Mahasiswa Pendidikan Sejarah Vol 2, No 2 (2017): April, Kajian Isu Kebudayaan dan Etnisitas
Publisher : Universitas Syiah Kuala

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Infertilitas adalah ketidak mampuan untuk hamil, ketidak mampuan mempertahankan kehamilan, ketidak mampuan untuk membawa kehamilan kepada kelahiran hidup. Infertilitas dapat bersifat primer dimana pasangan yang gagal untuk mendapatkan kehamilan sekurang- kurangnya dalam satu tahun berhubungan seksual secara teratur tanpa kontrasepsi dengan angka kejadian sebanyak 62,0% dan infertilitas sekunder yaitu ketidakmampuan seseorang memiliki anak atau mempertahankan kehamilannya dengan angka kejadian sebanyak 38,0%. Wanita yang mengalami infertil akan cenderung terganggu tingkat emosionalnya, maka semakin tinggi angka infertil akan mempengaruhi tingkat psikologi pada wanita. Tujuan dalam penelitian ini untuk mengetahui menganalisis dampak infertil terhadap kesehatan jiwa pada wanita diKecamatan Meurah Dua Kabupaten Pidie Jaya. Penelitian ini menggunakan metode penelitian kualitatif dengan pendekatan ferminologi yang dimaksudkan untuk mengeksplorasi fenomena dampak infertil terhadap kesehatan jiwa pada wanita yang telah menikah. Dimana informan penelitian ini sebanyak delapan orang informan. Teknik pengumpulan data melalui observasi, in-depth interview, dan dokumentasi selama proses penelitian dan analisis data yaitu menggunakan analisis komponensial (content).