Claim Missing Document
Check
Articles

Found 2 Documents
Search

ANALISA FAKTOR-FAKTOR YANG MEMPENGARUHI PENERAPAN MANAJEMEN WAKTU PADA PROYEK KONSTRUKSI JALAN DI KOTA SAWAHLUNTO Palusia, Abadi
Rang Teknik Journal Vol 1, No 2 (2018): VOLUME 1 NO 2 JUNI 2018
Publisher : Fakultas Teknik Universitas Muhammadiyah Sumatera Barat

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31869/rtj.v1i2.757

Abstract

Currently, many road projects are performing poorly for timely completion, an analysis of time road project implementation needs to be done on the contractor company, so that it can be known that the shortcomings and weaknesses done so far, which later can be an input for contractor, to be even better in the implementation of time management of a road construction project. In 2017 many packages of road construction works in Sawahlunto City. The purpose of this study is to determine the factors that affect the implementation of time management of road construction projects in Sawahlunto. The research method used is quantitative research method by spreading questionnaires to the respondents involved in road construction project in Sawahlunto City. Kata Kunci : Time Management, road, late
ANALISA FAKTOR-FAKTOR YANG MEMPENGARUHI PENERAPAN MANAJEMEN WAKTU PADA PROYEK KONSTRUKSI JALAN DI KOTA SAWAHLUNTO Palusia, Abadi
Rang Teknik Journal Vol 1, No 2 (2018): VOLUME 1 NO 2 JUNI 2018 Rang Teknik Journal
Publisher : Fakultas Teknik Universitas Muhammadiyah Sumatera Barat

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (363.52 KB) | DOI: 10.31869/rtj.v1i2.757

Abstract

Currently, many road projects are performing poorly for timely completion, an analysis of time road project implementation needs to be done on the contractor company, so that it can be known that the shortcomings and weaknesses done so far, which later can be an input for contractor, to be even better in the implementation of time management of a road construction project. In 2017 many packages of road construction works in Sawahlunto City. The purpose of this study is to determine the factors that affect the implementation of time management of road construction projects in Sawahlunto. The research method used is quantitative research method by spreading questionnaires to the respondents involved in road construction project in Sawahlunto City. Kata Kunci : Time Management, road, late