Journal of Industrial Engineering
Vol 1, No 1 (2016)

Reducing Overflow by Using Storage Analysis Chart at PT. Mitratama Autopart Company

Aliyuslita Aliyuslita (Unknown)
Anastasia L Maukar (Unknown)



Article Info

Publish Date
21 Apr 2016

Abstract

Factory is a very common location in industrial field, where the most problem occurred. By observing the local part that is used for production welding plant 1 in PT. Mitratama, some part are often returned. The problem was happening because the capacity flow rack cannot hold all of the box supplied. Resulting in re-arrangement of the quantity in box, so the number of box used is decreasing for the next supply. One of the solutions is increasing the box capacity and the other one is by standardize the flow rack measurement. Therefore, Storage Analysis Chart is used to identify the capacity of regular production safety stock, type of rack, and the area requirement. Internal lead time and stock capacity in the flow rack of production line also become consideration. Storage Analysis Chart can provide the improvement by optimizing the measurement and its space. Then standardization is implemented so the rack capacity will be improved. So, all the box from the progress lane can be supplied to production. The results of the standardization that has been implemented are the overflow will be reduced by 1.54% and the area of direct supply also reduced by 50%.

Copyrights © 2016






Journal Info

Abbrev

journalofIndustrialEngineerin

Publisher

Subject

Industrial & Manufacturing Engineering

Description

JIE: Journal of Industrial Engineering (Online ISSN: 2527-4139; Printed ISSN 2503-3670) is a scientific journal in the field of industrial engineering that publishes scientific writings on pure and applied research in industrial system, including (but not limited to): Production system, Inventory ...