Perencanaan Instalasi Pengolahan Air Limbah (IPAL) Domestik Central Processing Plant (CPP) Gundih PT. Pertamina EP Asset 4 Cepu Field

Aviandini Galih Hanuranti (Universitas Islam Negeri Sunan Ampel Surabaya)
Sulistiya Nengse (UIN Sunan Ampel Surabaya)
Arqowi Pribadi (UIN Sunan Ampel Surabaya)
Dyah Ratri Nurmaningsih (UIN Sunan Ampel Surabaya)
Teguh Taruna Utama (UIN Sunan Ampel Surabaya)



Article Info

Publish Date
30 Dec 2020

Abstract

Central Processing Plant (CPP) Gundih is one of the production facilities of natural gas processing Blok Gundih PT. Pertamina EP Asset 4 Cepu Field from Kedungtuban, Randublatung, and Kedunglusi structure. Main activities of CPP Gundih consist production and operational activities. Production activities produces produced water. The water treatment of produced water processed by a production system and process. Operational activities of CPP Gundih produces wastewater from domestic activities (office) by 161 workers/day. The quantity of domestic wastewater are 21,896 m3/day, and the quality of Biological Oxygen Demand (BOD), Chemical Oxygen Demand (COD), and Total Suspended Solid (TSS) are 9,8 mg/L, 100 mg/L, and 33 mg/L. Grey water and black water currently accommodated in septic tanks. Runoff from the septic tank flowed through drainage without treatment. Therefore, sewerage treatment plant planned with anaerobic-aerobic biofilter. The cost needed for the construction are Rp. 13.590.441,80-.

Copyrights © 2020






Journal Info

Abbrev

alard

Publisher

Subject

Environmental Science

Description

Al Ard Jurnal Teknik Lingkungan publish articles on environmental engineering from various perspectives, covering both literary and fieldwork ...