Foristek
Vol. 10 No. 2 (2020): Foristek

PERANCANGAN INSTALASI LISTRIK PADA GEDUNG MARKAS KOMANDO DIREKTORAT KEPOLISIAN PERAIRAN DAN UDARA KEPOLISIAN DAERAH SULAWESI TENGAH DI DESA WANI

Mohammad Agrimansyah (Unknown)
Nurhani Amin (Unknown)
Muhammad Sarjan (Unknown)



Article Info

Publish Date
12 Oct 2021

Abstract

In office buildings, electrical energy is needed to meet the needs of lighting to electronic equipment used in the building. To support all of that, a reliable electrical installation system is needed so that all office activities can run well without causing significant problems. Therefore the planning of the electrical installation system in a building must refer to the applicable rules and regulations in accordance with PUIL and SNI. The design carried out refers to PUIL 2011, SNI 03-6575-2001 (Lighting System Design Procedures). The entire electrical installation system gets a 3 Phase supply from PLN. The total power in this building is 80000 watts, so the power needed from PLN to connect is 160 KVA. Conductors used in this installation, use cables with NYM and NYY types with varying sizes in accordance with the calculation of the conveying CRC that has been done.

Copyrights © 2020






Journal Info

Abbrev

foristek

Publisher

Subject

Computer Science & IT Control & Systems Engineering Electrical & Electronics Engineering

Description

Foristek is a scientific journal published with the aim of facilitating academics and researchers to publish their research results in the field of Innovation electrical engineering. Journal of the Electrical and Information Engineering Forum (Foristek) is a journal published by the Department of ...