Jurnal Rekayasa Infrastruktur Hexagon
Vol 5, No 1 (2020): HEXAGON

TINJAUAN KAPASITAS ABUTMEN JEMBATAN SENGKALING MALANG DENGAN BEBAN GEMPA

Nindi Rizki Apriliani (Unknown)
Pujo Priyono (UNIVERSITAS MUHAMMADIYAH JEMBER)
Arief Alihudien (UNIVERSITAS MUHAMMADIYAH JEMBER)



Article Info

Publish Date
09 Sep 2020

Abstract

lower. This obstacle is usually another way such as roads water or ordinary traffic. On planning and bridge work Planning the Structure of the Bottom can not be ignored.Part of the bridge structure is located at the bottom of very decisive for the strength and security of the building thereon.And for a direct link between the structure of the bridge structure under the bridge is the “Abutment” which is included on the structure under the bridge.Abutments of a building that serves to continue the load.Loading code that is used to plan bridge this refers to Indonesian National Standard SNI 1725:2016.The intensity of the earthquake is greatly increased, cause a change in the planning of bridges, the changes contained in the regulation SNI 2833:2016 about planning for earthquake resistance of the bridge. Bridge Sengkaling is a bridge alternative to ease the traffic toward Sengkaling Recreational Park located in Malang, East Java. With a length of28m and a width of 10m this is behind the University of Muhammadiyah Malang.

Copyrights © 2020






Journal Info

Abbrev

HEXAGON

Publisher

Subject

Civil Engineering, Building, Construction & Architecture

Description

Jurnal Rekayasa Infrastruktur Hexagon dikelola oleh Program Studi Teknik Sipil Fakultas Teknik dan di terbitkan oleh Universitas Muhammadiyah Jember secara berkala dua kali dalam setahun pada bulan Juni dan Desember. Journal Infrastruktur Hexagon memfokuskan pada bidang ketekniksipilan berisi ...