Bina Tambang
Vol 7, No 1 (2022): Journals Mining Engineering: Jurnal Bina Tambang

Perhitungan Perbandingan Tonase Bauksit Menggunakan Data Truck Count, dan Tonase Hasil Analisa Laboratorium di Bauxite Processing Plant 1 dan 2 PT. Jaga Usaha Sandai - Site sandai, Sandai Kiri, Kecamatan Sandai, Kabupaten Ketapang, Kalimantan Barat

Rahul Hutmi (Universitas Negeri Padang)
Heri Prabowo (Unknown)



Article Info

Publish Date
10 Jun 2022

Abstract

Abstract. The volume and tonnage of stockwash at the Bauxite Processing Plant have a great influence on the achievement of the company's production targets, so it is necessary to carry out good monitoring so that the loss of material in the stockwash can be minimized. Material loss can occur in the process, transportation and washing as well as the process of stacking material in the stockwash. Material that has been stacked on the stockwash can also be one of the factors for the occurrence of material loss, another factor is the uncertainty of the material production calculation data that has been washed in the field. So to ensure its production for that it is necessary to carry out laboratory analysis. Based on the calculation results that have been carried out, the difference between stock balance CF 50% and stock balance from laboratory analysis at Bauxite Processing Plant 1 and 2 is 3.389,05 tons. Based on the comparison chart, the results of the stock balance calculation from the laboratory analysis look more accurate when compared to the calculation of stock balance data truck count CF 50%. Keywords : Bauksit, Tonase, Lose material.

Copyrights © 2022






Journal Info

Abbrev

mining

Publisher

Subject

Earth & Planetary Sciences

Description

Atas dukungan dari jurusan Teknik Pertambangan dengan Penanggung Jawab Dekan Fakultas Teknik UNP (Drs. Ganefri,MPd, P.hd) bekerjasama dengan Ketua Jurusan Teknik Pertambangan (Drs.Bambang Heriyadi,MT) dan seluruh Dosen Jurusan Teknik Pertambangan Fakultas Teknik Universitas Negeri Padang. Jurnal ini ...