Jurnal Teknik Pengairan: Journal of Water Resources Engineering
Vol 3, No 2 (2012)

Kajian Potensi Sungai Srinjing Untuk Pembangkit Listrik Tenaga Mikrohidro (Pltmh) Brumbung Di Kabupaten Kediri

Indarto, Agus (Unknown)
Juwono, Pitojo Tri (Unknown)
Rispiningtati, Rispiningtati (Unknown)



Article Info

Publish Date
14 May 2013

Abstract

MHP Brumbung is located at upstream of Srinjing River. Potential discharge MHP Brumbung depends on the discharge of the gate 1 operation of Siman dam which is used to irrigate 4852 Ha Siman crop area.To obtain the optimal scale in the construction of the MHP to be optimized flow generation and generating units in order to obtain an economical MHP. Dependable discharge optimization results are used as a basic for discharge planning of Brumbung MHP is discharge with 75% probability that is equal to 3.394 m3/dt with the discharge for one unitinstalled capacity is equal to 1.697 m3/dt and installed capacity of 50 kW,with fluctuating effective head ranged from 4.944 m to 5.140 m, the annual energy production obtained 875,785.980 kWH for two generating units with a turbines Crossflow.Keywords: Micro hydropower, discharge optimization, installed capacity

Copyrights © 2012






Journal Info

Abbrev

jtp

Publisher

Subject

Engineering

Description

Jurnal Teknik Pengairan is a scientific journal published regularly twice per year by Faculty of Engineering, Universitas Brawijaya. The paper submitted in this journal covers the fields of Water Resources Information System, Water Resources Conservation, Water Resources Utilization and Efficiency, ...