JOURNAL OF CIVIL ENGINEERING, BUILDING AND TRANSPORTATION
Vol. 8 No. 2 (2024): JCEBT SEPTEMBER

Evaluation of Project Implementation Time Based on Optimistic, Pessimistic, and Most Likely Time Using the Monte Carlo Method (Project Case Study: Sentul Road Rehabilitation - Bendung Terrace - Tirtayasa, Serang District FY. 2022): Project Case Study: Sentul Road Rehabilitation - Bendung Terrace - Tirtayasa, Serang District FY. 2022

Muhammad Ridho Alcaesar (Unknown)
Eri Susanto Hariyadi (Unknown)
Mardiaman (Unknown)



Article Info

Publish Date
06 Sep 2023

Abstract

Construction projects have precise plans and completion times. This turnaround time is affected by the performance of the workers and the method of execution. In this road rehabilitation work, there are several stages of work that require time to complete. The Monte Carlo method can estimate the completion time which can be calculated with the optimistic time, the most likely time and the pessimistic time. In this study using quantitative analysis method which refers to 10 respondents with each working device, namely contractors, consultants, owners and foremen. The results of the study show difference between opinions regarding the estimated time for implementation between contractors, consultants, owners and foremen. The comparison results of the Monte Carlo simulation were obtained with a difference of 1.7 – 1.9 weeks when compared with the actual results.

Copyrights © 2024






Journal Info

Abbrev

jcebt

Publisher

Subject

Civil Engineering, Building, Construction & Architecture

Description

Jurnal JCEBT Program Studi Teknik Sipil merupakan jurnal ilmiah yang diterbitkan berkala setiap 6 bulan, yaitu Maret dan September. Jurnal JCEBT Program Studi Teknik Sipil diterbitkan untuk pertama kalinya pada tahun 2017 dengan membawa misi sebagai salah satu pelopor dalam penerbitan media ...