Analisa Infrastruktur Desa Sukaci-Baros Dengan Metode Critical Path Method (CPM)

Ahmad Nalhadi (Universitas Serang Raya)
Nana Suntana (Universitas Serang Raya)



Article Info

Publish Date
05 Aug 2017

Abstract

CV. ABP a construction company worked in infrastructure building development for private and goverment. Now CV. ABP is handling infrastructure development project of the acropolitan area (Right Payment) Sukaci - Baros Village. This project has been late for 19 days from the dead line 126 days. Therefore the cost is getting higher. It happened because bad management is the problem source. Restoring the project time need to be focused on the cost and the due date based on the schedule. Scheduling evaluation using Critical Path Method (CPM) and Crashing to find optimal results using Critical Path Method (CPM) can be found the critical paths activity, there are ground digging , bopflang installation, stone installation, agregrate B agrgregation , aggregate A flatting, rigit bavement work, and refining, when the time suppression obtained optimal time results from 126 days to 92 days. It taken an alternative to the addition of working hours with duration 92 day after the crashing. Using two alternatives, additional working hours and the addition of workforce, obtaining the difference of extra hours of work cost Rp 80.128.125 and labourcost increase Rp 55.260 from the regular cost.

Copyrights © 2017






Journal Info

Abbrev

JSMI

Publisher

Subject

Engineering Industrial & Manufacturing Engineering Transportation

Description

This journal aims to publish the results of research in the field of Industrial Engineering is published twice a year, managed by the University of Serang Raya. The scope of Sciences covers Operations Research, Manufacturing System, Industrial Management, Ergonomics and Work System, Logistics and ...