Jurnal Ilmiah Teknik Industri
Vol. 17, No. 2, Desember 2018

Penentuan Lokasi Fasilitas Postponement Pada Rantai Pasok Ordinary Portland Cement

Romadlon, Fauzan (Unknown)
Kurniawan, Hari (Unknown)



Article Info

Publish Date
27 Dec 2018

Abstract

This research deals with the problem of postponement facility siting for distributing OPC cements produced by PT. Semen Jawa. In order to obtain the optimum value of the site location, centre of gravity (CoG) method is applied. From calculation, a location in Jatiwarna, Bekasi with longitutede and latitude of -6.30687 dan 106.9311, respectively, is selected. I addition, for the reason of efficiency, it is suggested in this paper the PT. Semen Jawa should share a location of SCG batching plant in Kampung Rambutan as a postponement facility.

Copyrights © 2018






Journal Info

Abbrev

jiti

Publisher

Subject

Industrial & Manufacturing Engineering

Description

Jurnal Ilmiah Teknik Industri is a scientific journal that aims to participate in developing the scientific field of Industrial Engineering, contains the results of research and theoretical study from lecturers, researchers and industry practitioners. Jurnal Ilmiah Teknik Industri is administered by ...