ComTech: Computer, Mathematics and Engineering Applications
Vol 7, No 2 (2016): ComTech

Integrating Preventive Maintenance Scheduling As Probability Machine Failure And Batch Production Scheduling

Zahedi, Zahedi (Unknown)
Salim, Ashadi (Unknown)



Article Info

Publish Date
01 Jun 2016

Abstract

This paper discusses integrated model of batch production scheduling and machine maintenance scheduling. Batch production scheduling uses minimize total actual flow time criteria and machine maintenance scheduling uses the probability of machine failure based on Weibull distribution. The model assumed no nonconforming parts in a planning horizon. The model shows an increase in the number of the batch (length of production run) up to a certain limit will minimize the total actual flow time. Meanwhile, an increase in the length of production run will implicate an increase in the number of PM. An example was given to show how the model and algorithm work.

Copyrights © 2016






Journal Info

Abbrev

comtech

Publisher

Subject

Computer Science & IT Engineering Mathematics

Description

The journal invites professionals in the world of education, research, and entrepreneurship to participate in disseminating ideas, concepts, new theories, or science development in the field of Information Systems, Architecture, Civil Engineering, Computer Engineering, Industrial Engineering, Food ...