cover
Contact Name
Hariyadi
Contact Email
Hariyadi
Phone
-
Journal Mail Official
hariefamily@yahoo.co.id
Editorial Address
-
Location
Kota padang,
Sumatera barat
INDONESIA
Rang Teknik Journal
ISSN : 25992081     EISSN : 25992090     DOI : -
RANG TEKNIK JOURNAL, merupakan Jurnal Penelitian dan Kajian Ilmiah yang diterbitkan Fakultas Teknik Universitas Muhammadiyah Sumatera Barat yang terbit 2 (dua) kali dalam setahun.
Arjuna Subject : -
Articles 23 Documents
Search results for , issue " Vol 1, No 2 (2018): VOLUME 1 NO 2 JUNI 2018 Rang Teknik Journal" : 23 Documents clear
ANALISIS PEMANFAATAN ENERGI DARI PENGOLAHAN METODE LANDFIIL DI TPA MUARA FAJAR PEKANBARU Monice, Monice
Rang Teknik Journal Vol 1, No 2 (2018): VOLUME 1 NO 2 JUNI 2018 Rang Teknik Journal
Publisher : Fakultas Teknik Universitas Muhammadiyah Sumatera Barat

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (292.966 KB) | DOI: 10.31869/rtj.v1i2.700

Abstract

Energi terbarukan dan ramah lingkungan sangat banyak ditemui dan berasal dari proses alam yang berkelanjutan, seperti sinar matahari, angin, air, biofuel, dan geothermal. Tetapi hal tersebut belum dimanfaatkan maksimal. Salah satu energi tersebut berasal dari sampah, pemanfaatan sampah kota menjadi sumber energi dapat dilakukan dengan memanfaatkan beberapa teknologi diantaranya adalah dengan metode Landfill. Pada Metode landfill ini sampah ditumpuk dan ditutupi sehingga menghasilkan gas metan. Gas inilah yang digunakan untuk membangkitkan energi listrik. Dari hasil Analisis penelitian ini Kota Pekanbaru sangat berpotensi dalam memanfaatkan sampah kota menjadi energi listrik. Dengan potensi sampah setiap harinya yang masuk ke Tempat Pembuangan Akhir (TPA) Sampah, akan mengalami proses anaerob dalam beberapa lama. Analisis penelitian ini dibantu dengan safware Landfill Gas Emissions Model (LandGem) yang dapat memperkirakan gas metan yang dihasilkan dari total sampah yang masuk k TPA. Dari hasil perhitungan dengan metode metode landfill   pada tahun 2017 adalah 6.806 kWh, gas metan yang dihasilkan diperoleh dengan Landfill Gas Emissions Model (LandGEM ).
PERANCANGAN SISTEM OTOMATISASI TIRAI VERTICAL BLIND DAN LAMPU RUANGAN DENGAN SENSOR LDR Asriyadi, Asriyadi; Ciksadan, Ciksadan
Rang Teknik Journal Vol 1, No 2 (2018): VOLUME 1 NO 2 JUNI 2018 Rang Teknik Journal
Publisher : Fakultas Teknik Universitas Muhammadiyah Sumatera Barat

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (705.24 KB) | DOI: 10.31869/rtj.v1i2.702

Abstract

Penelitian ini menitikberatkan pada perancangan sistem otomatisasi tirai vertical blind dan lampu ruangan yang sangat bermanfaat bagi aktifitas rumah tangga sehingga pemilik rumah tidak perlu membuka dan menutup tirai vertical blind maupun menyalakan dan mematikan lampu. Dari hasil pengujian sistem otomatisasi tirai vertical blind dan lampu ruangan didapatkan bahwa pada sensor LDR, motor servo dan modul relay mengalami kenaikan tegangan sebesar 0,01 V baik ketika tirai menutup atau membuka dan lampu ruangan menyala dan mati. Sedangkan pengukuran dengan menggunakan osiloskop tercatat bahwa masing-masing titik pengukuran pada sensor LDR, motor servo dan modul relay didapatkan kenaikan tegangan peak to peak dari 1 Vpp ke 2 Vpp.
STUDI KOMPARASI DETAILING DESAIN KOMPONEN LENTUR STRUKTUR BETON BERTULANG SRPMK DAN SRPMM Fitrah, Ridho Aidil; Melinda, Annisa Prita
Rang Teknik Journal Vol 1, No 2 (2018): VOLUME 1 NO 2 JUNI 2018 Rang Teknik Journal
Publisher : Fakultas Teknik Universitas Muhammadiyah Sumatera Barat

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (471.7 KB) | DOI: 10.31869/rtj.v1i2.722

Abstract

Sistem Pemikul Rangka Momen Khusus (SPRMK) dan Sistem Pemikul Rangka Momen Menengah (SPRMM) memiliki konsep desain dan detailing struktur yang berbeda untuk mencapai kapasitas sebuah gedung tahan gempa. Namun, beberapa perencanaan konstruksi bangunan masih belum mengacu ke SNI Gempa 1726-2012 dan SNI Beton 2847:2013. Sehingga, detailing komponen struktur khususnya bangunan beton bertulang yang tahan gempa perlu menjadi perhatian khusus. Peneilitian ini bertujuan untuk membandingkan desain dan detailing komponen struktur lentur untuk tipe SPRMK dan SPRMM dengan fungsi gedung perkantoran. Permodelan struktur menggunakan software SAP2000 v.19 dengan analisis respons spektra kota Padang dan Pekanbaru. Hasil analisis gaya dalam digunakan untuk mendesain kebutuhan tulangan longitudinal dan transversal serta cut off points pada balok. Berdasarkan hasil komprasi desain struktur SPRMK dan SPRMM.terdapat perbedaan jumlah tulangan longitudinal untuk memikul momen positif dan negatif di sepanjang bentang balok, serta jarak tulangan transversal dan jarak pemutusan tulangan.
ANALISIS PERBANDINGAN ALGORITMA PARTICLE SWARM OPTIMIZATION DAN FIREFLY ALGORITHM DALAM MENENTUKAN MINIMUM SPANNING TREE Novianti, Desi; Hapsari, Dewi Anggraini Puspa
Rang Teknik Journal Vol 1, No 2 (2018): VOLUME 1 NO 2 JUNI 2018 Rang Teknik Journal
Publisher : Fakultas Teknik Universitas Muhammadiyah Sumatera Barat

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (220.663 KB) | DOI: 10.31869/rtj.v1i2.723

Abstract

Tujuan dari penelitian ini adalah untuk menganalisis perbandingan akurasi   dalam  penyelesaian masalah minimum spanning tree dengan menggunakan algoritma PSO dan FA.  Sehingga mendapatkan akurasi terbaik dari keduaalgoritma tersebut. Menganalisis algoritma adalah untuk menemukan karakteristik dalam rangka untuk mengevaluasi kesesuaian untuk berbagai aplikasi atau membandingkannya dengan algoritma lain untuk aplikasi yang sama. Selain itu, analisis algoritma dapat membantu kita memahami lebih baik, dan dapat menyarankan perbaikan diinformasikan. Algoritma cenderung menjadi lebih pendek, sederhana, dan lebih elegan selama proses analisis. Minimum spanning tree merupakan adalah Spanning Tree dengan jumlah bobot terkecil yang berguna untuk membantu mengatasi problem seperti  menentukan untuk merentangkan jaringan kabel listrik yang menghubungkan sejumlah lokasi dengan panjang kabel yang digunakan sependek-pendeknya mungkin,  melihat pengelompokan data yang tersebar pada suatu ruang, Perencanaan jaringan transportasi/distribusi barang. Dan masih banyak problem lainnya. Algoritma PSO dan FA merupakan beberapa algoritma yang digunakan untuk implementasikan problem minimum spanning tree. Dimana hasil yang diperoleh dari penelitian ini adalah algoritma PSO lebih baik daripada algoritma FA dalam segi kompleksitas waktu eksekusi. Sehingga mendapatkan akurasi terbaik dari kedua algoritma tersebut.
PENGARUH KUALIFIKASI KONTRAKTOR TERHADAP KUALITAS PEKERJAAN PROYEK KONSTRUKSI DI KABUPATEN TANAH DATAR M.T., IPP, Ir. Surya Eka Priana,
Rang Teknik Journal Vol 1, No 2 (2018): VOLUME 1 NO 2 JUNI 2018 Rang Teknik Journal
Publisher : Fakultas Teknik Universitas Muhammadiyah Sumatera Barat

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31869/rtj.v1i2.724

Abstract

AbstractIn the national development, the construction service industry has an important role in the country's economy because it is able to contribute to gross domestic product of seven percent. Of the 98,000 existing contractors in Indonesia, 1% of them are large qualifications, 9% of middle qualifications and 90% of small qualifications, the increase in the number of companies has not been followed by improvements in their qualifications and performance, which can be seen from the quality of work, the timeliness of completion, and efficient utilization of personnel resources, capital, and technology in the implementation of construction services is not as expected. Based on the description above, then the formulation of the problem of this study are What factors affect the quality of contractor work in Tanah Datar regency and Analyze contractor qualification relationship with the quality of construction project work in Tanah Datar regency. The main factors affecting the quality of the contractor's work are the human resource factors such as technical personnel who do not understand the technical specifications, working drawings and sufficient capital to finance the projects undertaken so that contractors experience financial difficulties when undertaking the project, in the filing of termin, the project capital obtained from bank loans, technical personnel understand the making of the report, the difficulty of putting STM and D3 engineering personnel, insuring the manpower, full-time technical personnel are always at the project site, technical personnel are placed the same as contract documents. Key Words : qualification, quality, construction
SISTEM INFORMASI PEMASARAN PERUMAHAN DAN PEMBAYARAN KONSUMEN PADA CV MANDIRI UTAMA CABANG PAYAKUMBUH MENGGUNAKAN VISUAL BASIC 6.0 Siska, Sri Tria
Rang Teknik Journal Vol 1, No 2 (2018): VOLUME 1 NO 2 JUNI 2018 Rang Teknik Journal
Publisher : Fakultas Teknik Universitas Muhammadiyah Sumatera Barat

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31869/rtj.v1i2.726

Abstract

Penelitian yang dilakukan pada CV Mandiri Utama bertujuan untuk membangun sebuah Sistem Informasi dengan menggunakan bahasa pemograman Visual Basic 6.0 untuk membantu dalam proses pembayaran konsumen dan merancang suatu database yang dapat menyimpan data-data yang berkaitan dengan analisis laporan data pembayaran konsumen dari sistem tersebut, serta mempermudah proses dan penyajian informasi yang akurat mengenai proses pembayaran. Metode penelitian yang penulis gunakan adalah metode wawancara dan observasi.Kata Kunci : pembayaran,vb6.0 visual basic
ANALISA FAKTOR-FAKTOR YANG MEMPENGARUHI PENERAPAN MANAJEMEN WAKTU PADA PROYEK KONSTRUKSI JALAN DI KOTA SAWAHLUNTO Palusia, Abadi
Rang Teknik Journal Vol 1, No 2 (2018): VOLUME 1 NO 2 JUNI 2018 Rang Teknik Journal
Publisher : Fakultas Teknik Universitas Muhammadiyah Sumatera Barat

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31869/rtj.v1i2.757

Abstract

Currently, many road projects are performing poorly for timely completion, an analysis of time road project implementation needs to be done on the contractor company, so that it can be known that the shortcomings and weaknesses done so far, which later can be an input for contractor, to be even better in the implementation of time management of a road construction project. In 2017 many packages of road construction works in Sawahlunto City. The purpose of this study is to determine the factors that affect the implementation of time management of road construction projects in Sawahlunto. The research method used is quantitative research method by spreading questionnaires to the respondents involved in road construction project in Sawahlunto City. Kata Kunci : Time Management, road, late
PENENTUAN TINGKAT MINAT BELANJA ONLINE MELALUI MEDIA SOSIAL MENGGUNAKAN METODE CLUSTERING K-MEANS M.Kom., Anita,
Rang Teknik Journal Vol 1, No 2 (2018): VOLUME 1 NO 2 JUNI 2018 Rang Teknik Journal
Publisher : Fakultas Teknik Universitas Muhammadiyah Sumatera Barat

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31869/rtj.v1i2.758

Abstract

Social media becomes the pre-eminent businessperson in marketing the goods. This is based on the increasing use of social media from year to year. The determination of the level of interest in online shopping through social media aims to help find out which social media are in demand in online shopping. In this study the data used are social media BBM Group, Instagram, Facebook, Twitter and Whatsapp and age and gender. In determining the level of online shopping interest one method of Data Mining used is the method of Clustering K-Means. Clustering is the process of dividing data into classes or clusters based on their similarity. To assist in data processing used Rapid Miner application that is able to provide information on the level of interest in online shopping in social media
PENERAPAN APLIKASI SISTEM INFORMASI MANAJEMEN OPERASIONAL PADA USAHA KITA POULTRY SHOP Budiman, Arif
Rang Teknik Journal Vol 1, No 2 (2018): VOLUME 1 NO 2 JUNI 2018 Rang Teknik Journal
Publisher : Fakultas Teknik Universitas Muhammadiyah Sumatera Barat

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31869/rtj.v1i2.759

Abstract

Penelitian ini lebih ditekankan pada implementasi Aplikasi sistem informasi manajemen operasional pada Usaha Kita Poultry Shop (Usaha Kita PS) setelah pada penelitian sebelumnya telah dilakukan analisa dan perancangan sistem informasi Manajemen Operasional. Menggunakan metode kualitatif deskriptif dan dituangkan dalam penjabaran dengan tools Context Diagram dan Data Flow Diagram. Pada penelitian ini didapatkan entitas antara lain Kasir, Seller, Orderer dan verifier yang terlibat langsung pada sistem informasi yang memberikan input ke sistem. Metode pengumpulan data dilakukan dengan terlibat langsung dengan entitas sistem disertai dengan wawancara kebutuhan dan keinginan pada sistem yang lebih mendalam dan tapat sasaran. Hasil penelitian ini mempunyai beberapa proses yang utama seperti (1) Manajemen Barang (2) Manajemen Pelanggan, (3) Manajemen Supplier, (4) Manajemen Order (5) Pembayaran (6) Penjualan (7) Validasi dan (8) Laporan. Dari implementasi yang dilakukan terlihat bahwa sistem dapat bekerja dengan efektif dan efisien dan dapat membantu proses manajemen operasional Usaha Kita PS.   Keywords : Sistem Informasi Manajemen, Usaha Kita, Aplikasi
KAJIAN KUAT TEKAN BETON NORMAL MENGGUNAKAN STANDAR SNI 7656-2012 DAN ASTM C 136-06 A, Arman.
Rang Teknik Journal Vol 1, No 2 (2018): VOLUME 1 NO 2 JUNI 2018 Rang Teknik Journal
Publisher : Fakultas Teknik Universitas Muhammadiyah Sumatera Barat

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31869/rtj.v1i2.760

Abstract

Beton merupakan salah satu pilihan sebagai bahan struktur dalam kontruksi bangunan. Inovasi teknologi beton selalu dituntut guna menjawab tantangan akan kebutuhan, beton yang dihasilkan diharapkan mempunyai kwalitas tinggi meliputi kekuatan dalam daya tahan tanpa mengabaikan nilai ekonomis. Peraturan mengenai standar spesifikasi agregat di indonesia mengalami perubahan seiring dikeluarkannya SNI 7656-2012 dan ASTM C 136-06 yang mengenai persyaratan Spesifikasi agregat untuk perencanaan beton. Salah satu hal baru yang tercantum dalam SNI 7656-2012 adalah dalam hal penentuan gradasi saringan di tetapkan dalam zona-zona yang telah di tentukan, hal ini sedikit berbeda dari peraturan ASTM C 136-06 yang menyatakan bahwa spesifiksi gradasi telah di tentukan. Penelitian ini bersifat eksperiment yang dilaksanakan dilaboratorium teknik sipil Institut Teknologi Padang (ITP). Objek pada penelitian ini adalah beton dengan mutu sedang yang menggunakan bahan Standar SNI 7656-2012 dan ASTM C 136-06. Pembuatan benda uji yang digunakan berbentuk kubus berukuran lebar 15 mm x tinggi 15 mm x Panjang 15 mm. Sebanyak (3) sampel tiap variasi campuran yang berbeda dengan umur beton 7,14,dan 28 hari. Rata - rata nilai pengujian kuat tekan beton kubus umur 7 hari degan suhu air 25 °C proses pengerjaan pada pagi hari Standar SNI 7656-2012  sebesar 171,55Kg/m² dan Standar ASTM C 136-06 sebesar 166,72 Kg/m² dengan persen perbandingan kuat tekan sebesar 3%. Sementara pada benda uji kubus umur 14 hari dengan suhu air 28°C proses pengerjaan pada siang hari Standar SNI 7656-2012  sebesar 222,30 Kg/m² dan Standar ASTM C 136-06 sebesar 210,22 Kg/m² dengan persen perbandingan kuat tekan sebesar 5%. Setelah dilakukan pembuatan benda uji dengan suhu air 25 °C langsung perawaatan benda uji, kubus umur 28 hari mengalami peningkatan kuat tekan beton peroleh nilai Standar SNI 7656-2012  sebesar 267,60 Kg/m² dan Standar ASTM C 136-06 sebesar 264,58 Kg/m² dengan persen perbandingan kuat tekan sebesar 1%. Berdasarkan analisis dan pembahasan dapat disimpulkan bahwa Job Mix Design beton metode ASTM C 136-06 menghasilkan proporsi campuran bahan yang relative lebih efisien dibandingkan metode SNI 7656-2012. Artinya bahwa secara  teoritis Job Mix Design beton fc' 20.75MPa metode ASTM C 136-06 lebih ekonomis dari segi penggunaan bahan dari metode SNI 7656-2012 KATA KUNCI:   Metode SNI 7656-2012, ASTM C 136-06, Beton Normal, Kuat Tekan Beton

Page 1 of 3 | Total Record : 23