cover
Contact Name
Mira Lestira Hariani
Contact Email
mira.hariani0103@gmail.com
Phone
(0231) 246664
Journal Mail Official
greenscience.ft@unswagati.ac.id
Editorial Address
Fakultas Teknik, Universitas Swadaya Gunung Djati Cirebon Jl. Pemuda No. 32 Kota Cirebon, Jawa Barat
Location
Kota cirebon,
Jawa barat
INDONESIA
Journal of Green Science and Technology
ISSN : 25981277     EISSN : 26213966     DOI : http://dx.doi.org/10.33603/jgst
Core Subject : Engineering,
Journal of Green Science and Technology (JGST) published since 2018 by Faculty of Engineering Universitas Swadaya Gunung Djati (UGJ) Cirebon with p-ISSN 2598-1277 and e-ISSN 2621-3966. JGST is a peer reviewed journal published triannualy in January, April, and September.
Articles 121 Documents
ANALYSIS STRUCTURE OF THE BOARDING HOUSE TEGAL PARANG AT SOUTH JAKARTA Irpansyah, Kholly; Rohman, Fathur
Journal of Green Science and Technology Vol 2, No 2 (2018): JOURNAL OF GREEN SCIENCE AND TECHNOLOGY
Publisher : FAKULTAS TEKNNIK UNIVERSITAS SWADAYA GUNUNG JATI

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33603/jgst.v2i2.1290

Abstract

Jakarta City is a city that became the heart of the unitary State of the Republic of indonesia has potential as the city develops. Jakarta is already good enough if compared to its neighboring cities ? city, seen from there is a lot of building skyscrapers. Therefore the population in this city is very solid plus the number of communities outside the city looking for work, education and so on, and many choose to find a place the residence then the role of the existence of an agency that handles problems a place to live and help with much needed to help the business community in order to be better, as there are Houses kost. Currently, the central building were built as high as five floors with one basement, exactly on JL. TegalParang Utara, South Jakarta.To meet the criteria of safety and service required the existence of a design careful planning. Therefore the imposition of planning process must comply with the SNI 1727-2013 as well as planning the structure of the building should be referred to with the SNI-2847-2013 reinforced concrete, which is the latest peratuaran which refers to the AISC and has adapted to the the latest materials technology development. In the calculation of earthquake engineering, this refers to the SNI 1726 ? 2012.?Based on data obtained from a Home Building project, tegalparangkost has an area of approximately 3224.86 m2. The author will meredesain a building material by using the concrete structure which consists of 5 (four) along with the basement 1 floor.?Analysis of the structure of the used software SAP2000, a material used for reinforced concrete beams, columns, roof and floor plates are plates. The results obtained in the form of analysis and design drawings of the structure of the building House kosttegalparang.??Key Words: Analysis, Boarding House TegalParang, Material, Reinforced Concrete, Columns, Beams, Plate.
STUDY OF THE FUNCTION OF LOCAL ACTIVITIES CENTER(CASE STUDY)THE TOWN OF SOREANG, BANDUNG REGENCY AS THE CAPITAL Prasetyo, Irwan; Zefri, Zefri; Permana, Heri
Journal of Green Science and Technology Vol 3, No 2 (2019): JOURNAL OF GREEN SCIENCE AND TECHNOLOGY
Publisher : FAKULTAS TEKNNIK UNIVERSITAS SWADAYA GUNUNG JATI

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33603/jgst.v3i2.2386

Abstract

In the determination of the structure of the space of the city, where the City Go on the set as the center of local activities, while development in the town of Soreang is currently faced with various challenges, including the growing increase of the population, the limited infrastructure and land over the function so that the function of the city go unnoticed as the Centre of Local Activity hasn't been able to mengimbagi infrastructure services that should be available to the public.Study of the function of Local Activities Center take the case in the town of Soreang, strategy formulation to provide enhanced functionality for local Activities Center in the town of Soreang, Bandung Regency as the capitalAnalysis on the utilization of space occurs over the function of the land of paddy fields, became the land of housing, industry and infrastructure analysis, as well as other cities that have not been adequate as, road; Hospitals, higher education, Terminal, and utilities, this function meyebabkan Local Service Center does not seem to meet the needs of community service facilities in the town of Soreang, devote an increasing development strategies was obtained by the Center The local town of Soreang activities in the form of infrastructure development, land use strategy and strategy of institutional development as well as the role of the community to the development of the construction of the City Go as a function of local activities.Key Words: Local Activities Center Of The City As The Capital Of Bandung Regency, Soreang?
ANALYSIS AND DESIGN USING BEAM CONSTRUTION OF THE PELITA BANGSA SCHOOL IN THE CIREBON CITY Azhardi, Azhardi; Firmanto, Arief
Journal of Green Science and Technology Vol 2, No 1 (2018): JOURNAL OF GREEN SCIENCE AND TECHNOLOGY
Publisher : FAKULTAS TEKNNIK UNIVERSITAS SWADAYA GUNUNG JATI

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33603/jgst.v2i1.1174

Abstract

ABSTRACTThe success of the development from an area, which can be seen from the education level of the population. Increasingly developed education level of the population, it will be bring to the level of welfare for the population. Pelita Bangsa School Cirebon is a private school which has a ladder Play Group, Kindergarten, Elementary School, Junior High School and Senior High School, which is located in the city of Cirebon at the address on Terusan Laut Arafuru Street Blok A1 kavling . 6-7 Cirebon 45131 West Java.The additional building facilities of Pelita Bangsa School will be investigated in this thesis which is about structural analysis and design using steel material with LRFD (Load Resistance Factor Design) system.Analyze and design the construction of Pelita Bangsa School building with design code SNI-1729-2015 for building steel structures, SNI-1727-2013, PPPURG 1987 for loads and then SNI-1726-2012 for earthquake analysis.Analyze the structure with the help of SAP2000 (Structure Analysis Program 2000) software and design the building of Sekolah Pelita Bangsa using steel material.Keywords: Analysis and design structure, LRFD, steel material, SAP2000
Management Analysis Of The Project Of Muhammadiyah Bandung University Aninda, Ayu Putri; Rohman, Fathur
Journal of Green Science and Technology Vol 3, No 2 (2019): JOURNAL OF GREEN SCIENCE AND TECHNOLOGY
Publisher : FAKULTAS TEKNNIK UNIVERSITAS SWADAYA GUNUNG JATI

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33603/jgst.v3i2.2381

Abstract

??????????? Project management is all planning, implementation, controlling and coordination a project from early the (idea) the end project to en sure of the project appropriately time, money and quality. Selection method scheduling project is also one the very policy note in order to obtain result in according with the original plans.This thesis specifically discuss how project management planning the construction of Muhammadiyah Bandung University. The research was conducted by means of a survey into the field and study of literature.This thesis analysis includes volume calculation, Needs of labor, materials and equipment, Bar chart, Cash flow, S Curve, method of CPM (Critical Path Method) is a method of identifying critical work paths or items. Forwards calculation, backwards calculation, free float and total float.???????????Keyword: Project Management, Bar Chart, S Curve, Critical Path Method.
TRAFFIC PLANNING IN KUNINGAN CITY CENTER Pratama, Diky Irdianto Pratama; Anwar, Saihul
Journal of Green Science and Technology Vol 1, No 1 (2017): Journal of Green Science and Technology
Publisher : FAKULTAS TEKNNIK UNIVERSITAS SWADAYA GUNUNG JATI

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33603/jgst.v1i1.1035

Abstract

This research was conducted to improve the performance of service of Siliwangi Road which decreased. The data obtained from the Department of Transportation brass form LHR data brass city, road length, and the average speed of the vehicle, Then in if the degree of saturation of the Road in order to know the success of the New Planning. To facilitate the research and also because it has different problems Siliwangi road for 2 parts cut off by crossing, Siliwangi Street 1 which starts from Cijoho roundabout Until the intersection near Smpn 1 Kuningan has LHR 2563 smp with degree of saturation 0,97 at level Service E and Jalan Siliwangi 2 starting from intersection of Smpn 1 Kuningan Until the junction of Jalan Veteran has LHR 1761 smp with degree of saturation 0,67 level of service C. After in doing traffic engineering level of road service go up, Siliwangi Street 1 become C with degree of saturation 0.57 also Jalan Siliwangi 2 level service C with degree of saturation 0,51.
PLANNING AND ANALYSIS YOGYA TEGAL TOSERBA STRUCTURE Wibowo, Gino Harto; Roesdiana, Tira
Journal of Green Science and Technology Vol 3, No 1 (2019): JOURNAL OF GREEN SCIENCE AND TECHNOLOGY
Publisher : FAKULTAS TEKNNIK UNIVERSITAS SWADAYA GUNUNG JATI

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33603/jgst.v3i1.2148

Abstract

The strategic geographical location of Tegal City supports the development of business and services. YOGYA Group is a Supermaket and Department Store company. In building construction there is a structural analysis that is used as a method or system to achieve development as planned.The method used in this research is qualitative method. Literature method by collecting data, studying and identifying.Observation method by conducting a survey to the research location. Adhering to the guidelines of SNI 2847: 2013 (Requirements for structural concrete for buildings), SNI 1727: 2013 (Minimum load for building design and other structures), Guidelines for house planning and building loading (PPURG 1987) and SNI 1726: 2012 (earthquake resistance planning procedures for buildings and non-building structures).This analysis obtained a result of dimension data and the number of beam reinforcement, column, plate and the number of pile needs for the YogyaTegal department store building.Keyword : Analysis, Building, Concrete, SNI, Strategic
ANALYSIS OF CINAPEL BRIDGE PROJECT CONSTRUCTION MANAGEMENT ON THE CISUNDAWU TOLL ROAD Pahlawati, Nopa; Rozy, Nikko; Anwar, Saihul
Journal of Green Science and Technology Vol 3, No 3 (2019)
Publisher : FAKULTAS TEKNNIK UNIVERSITAS SWADAYA GUNUNG JATI

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33603/jgst.v3i3.2759

Abstract

ABSTRACTConstruction management is an attempt to use limited resources efficiently, effectively and timly in completing a project that has been palnned. There are 3 kinds of basic functions of construction management including planning, implementation, and control. Of three of these activities to control the resources on aproject that includes worker, equipment, material, money, and method.The research method used was qualitative research, as a way of collecting data on the study is how the study of the literature, interviews and direct observation in field. And this method is a method that is done to get a foundation theory in analyzing data, namely the analysis calculation of the volume of material, analysis of labor, analysis tool, method, method of Bar Chart S Curve and Critical Path Method.The location of the studies reviewed were Analysis Of Cinapel Bridge Project Construction Management On The Toll Cisundawu Road, located on Pamatutan Hamlet Mulyasari ? Pasir Hamlet Margamukti, Sumedang. The results of this research is the budget plan costs ?completed the construction of the Cinapel Bridge Project on Cisundawu Toll Road until the final stage costs less than Rp. 168,020,632,320, - and analysis of the Critical Path Method (CPM) estimates that the completion of the Cinapel Bridge on Cisundawu Toll Road takes 129 weeks (903 days)Keywords: Construction Management, Bar Chart, S Curve, Critical Path Method
THE PERFORMANCE ANALYSIS OF IRRIGATION AREA OF CIBENDUNG WEIR OF BREBES REGENCY Zain, Nur Azis; Farhan, Ohan
Journal of Green Science and Technology Vol 1, No 1 (2017): Journal of Green Science and Technology
Publisher : FAKULTAS TEKNNIK UNIVERSITAS SWADAYA GUNUNG JATI

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33603/jgst.v1i1.1031

Abstract

Cibendung Weir comprised in the district of Banjarharjo Brebes Center Java, the located approximately less than 50 km from Cirebon and 40 km from Brebes Center Java, and exist some villages such as, Cikakak, Karang Maja, Tiwulandu Village in East and Tonjong, Singkup, Gandol in West.Cibendung Weir have duct the name is Induk Cibendung Weir or named D.I Jangkelok Hilir. At first, the water able to dilute more less 6677ha but in this time only more less 6349ha, the trouble is diversion of the use of land. This Cibendung Weir was built in the years 1901 ? 1904.? The irrigation areas of Cibendung Weir supply six kemantren such as Kemantren Cibendung, Kemantren Bantarsari, Kemantren Losari Hulu, Kemantren Losari Hilir, Kemantren Kubangjero, and Kemantren Rungkang.The purpose of this research is become reference from evaluation performance of the irrigation area in Cibendung Weir by analyzing the physical condition of building although duct in the irrigation area of Cibendung Weir, analyzing of human resource in the irrigation area of Cibendung Weir, analyzing of rain Hydrology in the irrigation area of Cibendung Weir, analyzing of income from Bendung Cibendong, analyzing of the patterns plants in the irrigation area of Cibendung Weir, and analyzing planning plant and the realization of planting in the irrigation area of Cibendung Weir.The method of this research is qualitative method, in which the fission of the problem is explained that subject or the object research based on the facts which used during doing the research in performance of irrigation system and try to make a good relation in deep from the aspects particularly.Based on the build condition in this irrigation area is classified as satisfactory with percentage of damage reached 11,30%. Meanwhile, the duct condition in this irrigation area Cibendung Weir is good classified with percentage of damage reached 8,21%. The condition of organizer in DI Jangkelok Cibendung Weir only available 51 people, while in needed is 67 people with less percentage reached 17,94% so that service toward the duct condition is less completed and have the impact to net condition which less wake or always damaged, this situation should be increased.From the results of the analysis of the ratio of demand discharge with available discharge added effective rainfall in Irrigation Area Jengkelok,Cibendung Weir fulfilled,but many unused discharge it is necessary to modify cropping pattern in orde to maximize the potential of available discharge. The planting realization in 7 years ago in the irrigation area Jangkelok Cibendung Weir? it is less from the planning plant, but in the period of 2011/2012 occurs increased 7,34% and the realization of intensity planting is average 243,77% while the average of planning plan is 268,91% thus the lower plant in productivity in this case since it can?t be done to planting in this wide area.
ANALYSIS OF PROJECT MANAGEMENT TRANSMART CARREFOUR IN TEGAL CITY - CENTRAL JAVA N.I.S, Septi Dwi; Anwar, Saihul
Journal of Green Science and Technology Vol 2, No 3 (2018): JOURNAL OF GREEN SCIENCE AND TECHNOLOGY
Publisher : FAKULTAS TEKNNIK UNIVERSITAS SWADAYA GUNUNG JATI

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33603/jgst.v2i3.2142

Abstract

Project implementation is said to be optimal if good project management planning so that it can be done efficiently, qualified, safe, and economical. To produce an optimal project management is required with certain methods adjusted by the project. The purpose of this study is to determine the scheduling of project time to be done by using CPM network method (Critical Path Method) which will result in the length of time of completion of the project and determine the start and end time in each work. The first step is to conduct a field survey, collecting project data such as time schedule, and basic theory. After the data collection is considered enough, then the data is determined again with the method of CPM (Critical Path Method), followed by determining how much the cost to be incurred, and then made barchart and curve S. From the research results obtained, for project implementation can be completed with time work plan 282 days or 47 weeks. But with that time there are some critical work that will affect the duration, so special attention is required on the work. And costs incurred as much as Rp 223,363,901,783.98.Keywords : CPM (Critical Path Method), Duration of Work, Project Cost, Barchart, and Curve S
Analysis Of Construction Management On The Ashley Hotel Central Jakarta Development Project Aghniya, Shilvy; Anwar, Saihul
Journal of Green Science and Technology Vol 3, No 2 (2019): JOURNAL OF GREEN SCIENCE AND TECHNOLOGY
Publisher : FAKULTAS TEKNNIK UNIVERSITAS SWADAYA GUNUNG JATI

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33603/jgst.v3i2.2387

Abstract

Construction Management is the process of implementing management functions (Planning, Organizing, Actuating and Controlling) systematically on a project by using existing resources effectively and efficiently in order to achieve project objectives optimally.Analysis of Construction Management on the Ashley Hotel Central Jakarta Development Project isstartingfromtheanalysisofimplementationmethod,thecalculationoftheworkvolume,thecalculation of the needs of labor, material, and equipment, the calculation of the budget plan, and the time and cost control project with Barchart, S-Curve and Critical Path Method(CPM).Based on the analysis that has been done with Barchart, S-Curve and CPM, the construction of Ashley Hotel takes 69 weeks with an estimated cost of Rp. 39.091.299.600,00.Keyword : Construction Management, Barchart, S-Curve, CPM (Critical Path Method).

Page 1 of 13 | Total Record : 121