cover
Contact Name
Mira Lestira Hariani
Contact Email
mira.hariani0103@gmail.com
Phone
(0231) 246664
Journal Mail Official
greenscience.ft@unswagati.ac.id
Editorial Address
Fakultas Teknik, Universitas Swadaya Gunung Djati Cirebon Jl. Pemuda No. 32 Kota Cirebon, Jawa Barat
Location
Kota cirebon,
Jawa barat
INDONESIA
Journal of Green Science and Technology
ISSN : 25981277     EISSN : 26213966     DOI : http://dx.doi.org/10.33603/jgst
Core Subject : Engineering,
Journal of Green Science and Technology (JGST) published since 2018 by Faculty of Engineering Universitas Swadaya Gunung Djati (UGJ) Cirebon with p-ISSN 2598-1277 and e-ISSN 2621-3966. JGST is a peer reviewed journal published triannualy in January, April, and September.
Articles 121 Documents
STUDY OF THE FUNCTION OF LOCAL ACTIVITIES CENTER(CASE STUDY)THE TOWN OF SOREANG, BANDUNG REGENCY AS THE CAPITAL Heri Permana; Irwan Prasetyo; Zefri Zefri
Journal of Green Science and Technology Vol 3, No 2 (2019): JOURNAL OF GREEN SCIENCE AND TECHNOLOGY
Publisher : FAKULTAS TEKNNIK UNIVERSITAS SWADAYA GUNUNG JATI

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33603/jgst.v3i2.2386

Abstract

In the determination of the structure of the space of the city, where the City Go on the set as the center of local activities, while development in the town of Soreang is currently faced with various challenges, including the growing increase of the population, the limited infrastructure and land over the function so that the function of the city go unnoticed as the Centre of Local Activity hasn't been able to mengimbagi infrastructure services that should be available to the public.Study of the function of Local Activities Center take the case in the town of Soreang, strategy formulation to provide enhanced functionality for local Activities Center in the town of Soreang, Bandung Regency as the capitalAnalysis on the utilization of space occurs over the function of the land of paddy fields, became the land of housing, industry and infrastructure analysis, as well as other cities that have not been adequate as, road; Hospitals, higher education, Terminal, and utilities, this function meyebabkan Local Service Center does not seem to meet the needs of community service facilities in the town of Soreang, devote an increasing development strategies was obtained by the Center The local town of Soreang activities in the form of infrastructure development, land use strategy and strategy of institutional development as well as the role of the community to the development of the construction of the City Go as a function of local activities.Key Words: Local Activities Center Of The City As The Capital Of Bandung Regency, Soreang 
CONSTRUCTION MANAGEMENT ANALYSIS OF CIDERES HOSPITAL Zaid Al Hakim; Saihul Anwar
Journal of Green Science and Technology Vol 3, No 1 (2019): JOURNAL OF GREEN SCIENCE AND TECHNOLOGY
Publisher : FAKULTAS TEKNNIK UNIVERSITAS SWADAYA GUNUNG JATI

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33603/jgst.v3i1.2149

Abstract

Reliable infrastructure requires effective and efficient management from the planning, structural, construction, operational and maintenance phases to the end of service life. Good management of civil infrastructure guarantees not only to save funds, but to use natural resources appropriately, thus ensuring ecological sustainability.Construction management is part of civil engineering science that focuses on managing construction projects to realize technical concepts and designs produced by other parts of civil engineering science. Construction management aims to build built physical facilities or infrastructure that is needed to support human life.Management of construction projects is becoming increasingly complex due to the many parties that interact in it and the increasingly high demands for quality of functions, comfort, security, aesthetics and sustainability. Therefore construction management is needed to ensure the efficiency and productivity of a construction project in meeting various expectations and requirements.This thesis analysis includes volume calculation, Needs of labor, materials and equipment, Bar chart, Cash flow, S Curve, method of CPM (Critical Path Method) is a method of identifying critical work paths or items. Forwards calculation, backwards calculation, free float and total float. Based on the calculation of cash flow to complete the construction of Cideres Hospital Kadipaten Dawuan Majalengka project until final stage more or less cost as much Rp. 9,034,000,000,00. These costs are divided into two parts, structure and architecture work ,for structures the cost as much Rp. 3,644,000,000,00 and for architecture the cost is Rp. 5,390,000,000,00. From the calculation of CPM scheduling analysis, the development of Cideres Hospitalproject takes time for 45 weeksKeyword: Project Management, Bar Chart, S Curve, Critical Path Method
ANALYSIS OF CONSTRUCTION MANAGEMENT CONSTRUCTION PROJECTS DEVELOPMENT OF FLATS OF TEGAL ALUR DKI JAKARTA Akhmad Jamaludin; Saihul Anwar; Bukhori Bukhori
Journal of Green Science and Technology Vol 2, No 2 (2018): JOURNAL OF GREEN SCIENCE AND TECHNOLOGY
Publisher : FAKULTAS TEKNNIK UNIVERSITAS SWADAYA GUNUNG JATI

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33603/jgst.v2i2.1288

Abstract

Location of the development project of Tegal Alur DKI Jakarta KSO.WIKA & CAKRA in the Lingkungan III Tegal Alur West Jakarta coordinates Y: 2500.000 X: 2500.000 (West Jakarta PUPR Office)Project management is an attempt to use limited resources efficiently, effectively and on time in completing a predetermined / planned project. There are 3 activities of the basic functions of project management namely planning, implementation and control. Of the three activities are controlled resources on a project that includes manpower, equipment, materials, money and methods.Analysis of Construction Management of Jakarta TegalAlur DKI Jakarta Project Development Project includes Analysis of Work Implementation Method, Volume Calculation and Budget Plan of Jakarta TegalAlur DKI Jakarta Development Project, Schedule Compilation at TegalAlur DKI Jakarta Flower Housing Project, Cash Flow Analysis On Development Project of TegalAlur DKI Jakarta Flats.This research methodology is composed of several main stages, namely Preparation of Survey and Identification of Field, Seeking primary data and secondary data in related institution and department needed to complete data needed in preparation of thesis, Conducting analysis of data obtained through identification problem and make formulation, Taking conclusions and suggestions from the results of research.With Budget Plan Cost and calculation of workload of Jakarta Flat Development Project TegalAlur DKI Jakarta resulted in Working Time Plan takes 231 days using CPM scheduling method with estimated cost of Rp. 36.690.228.549 Keywords         :Project Management, Bar Chart, Curva S, CPM (Critical Path Method)
THE EFFICIENCY OF CRUDE CORROSION INHIBITOR AND GAS CORROSION INHIBITOR BY USING CARBON STEEL 1018 WITH POLARIZATION METHOD puji astuti ibrahim
Journal of Green Science and Technology Vol 4, No 2 (2020): Journal of Green Science and Technology, Vol.4 No.2 (2020)
Publisher : FAKULTAS TEKNNIK UNIVERSITAS SWADAYA GUNUNG JATI

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33603/jgst.v4i2.3467

Abstract

Carbon Steel 1018 is a low carbon steel having a carbon content (C) of 0.14-0.20% (<0.30% C). Low carbon steel is commercially known as mild steel. Corrosion is one way to prevent corrosion caused by the environment. Corrosion inhibitor are taken between the Crude Corrosion Inhibitor and Gas Corrosion inhibitor on Carbon Steel 1018 using the polarization method. Corrosion inhibitors work by making passive layers in the form of thin films or films on the surface of the material used as a barrier between metals and corrosive media. The analysis method used is polarization. Inhibition Efficiency Results obtained for Gas Corrosion Inhibitors (1A) at 10 ppm 96.86%, 20 ppm 59.74%, 30 ppm 74.48%. The Crude Corrosion Inhibitor (2A) results obtained inhibition efficiency for 10 ppm 99.57%, 20 ppm 77.69%, and 30 ppm 12.63%. The optimum value for the Gas Corrosion Inhibitor and Crude Corrosion Inhibitor is at 10 ppm at 96.86% and 99.57%. Keywords: carbon steel,crude corrosion inhibitor, corrosion , gas corrosion inhibitor, inhibitor
ANALYSIS STRUCTURE THE PT. TEMPO LAND BUILDING Subhan Manthofani; Arief Firmanto
Journal of Green Science and Technology Vol 1, No 1 (2017): Journal of Green Science and Technology
Publisher : FAKULTAS TEKNNIK UNIVERSITAS SWADAYA GUNUNG JATI

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33603/jgst.v1i1.1037

Abstract

Mundu  is  an  area  in  the  district of  Cirebon  that  passed  by  the Pantura lane, in the area of the Mundu there are various kinds of  trading industry, one of which is the trading industry from PT.  TEMPO LAND that are producing  medicines  for  health.  In  order  to  create  a  good  production and  marketing, so  in  the  area  is  built  office production  and  marketing  of PT. TEMPO LAND.PT.  TEMPO  LAND  is  a  group  company  in  the  form  of  by  the TEMPO GROUP or PT. TEMPO SCAN PACIFIC Tbk . The company PT. TEMPO GROUP  started  its  business  on  November 3, 1953. Production from this company produces a variety of pharmaceutical and healthcare products with different brands.   In  order  to  create  a  structure  that  is  safe  and  meets serviceability limit, so in the process of design the building structure must be according  to  SNI  - 2847  - 2013  of  reinforced  concrete,  which  is  the latest regulations adapted from the latest material technology development refers to the AISC. Beside planning, the  loading  structure  must  be according to SNI – 1727 – 2013 , then  for  calculation  of  earthquake engineering refers to SNI – 1726 – 2012.Analysis  structure  using  SAP2000,  for  the  material  of  structures  is used  concrete  including  frame  section  (column,  sloof,  beam,  and  slab). And then the  result  from  analysis  are  the  PT.  TEMPO  LAND  building  is safe  or  not,  with  check  the  deflection  and  check  load  maximum  permit from analysis foundation of PT. TEMPO LAND.Keywords : Analysis structure, SAP2000, frame section, deflection.
ANALYSIS STRUCTURE OF THE NEW BUILDING PKU MUHAMMADIYAH ISLAMIC HOSPITAL TEGAL Yusril Ramadhan; Arief Firmanto
Journal of Green Science and Technology Vol 3, No 3 (2019)
Publisher : FAKULTAS TEKNNIK UNIVERSITAS SWADAYA GUNUNG JATI

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33603/jgst.v3i3.2758

Abstract

ABSTRACTMuhammadiyah Islamic Hospital Tegal, built a 5 floor building to improve the quality of services in the health sector. Health access and more complete services in the district of Tegal are indeed expected by the community so that the community can get better health services.Muhammadiyah Islamic Hospital Tegal used a reinforced concrete structure and designed with reference to SNI 1727 :2013, PPURG 1987, SNI 2847 :2013 and SNI 1726 :2012.The static equivalent and the dynamic response spectrum analysis method is used in analyzing earthquakes load. The earthquake force on the structure is used a configuration of the structure of the Special Moment Resisting Frame System (SMRFS).Analysis structure at this building used a software ETABS v9.6.0to help structure modeling and calculate internal forces acting on the structure.Keyword: SNI 1727:2013, PPURG 1987, SNI 2847:2013, SNI 1726:2013, Response Spectrum, Lateral Equivalent Analysis, SMRF, ETABS v9.6.0
DEVELOPMENT OF ECO-FRIENDLY MORTAR UTILIZING INDUSTRIAL WASTE M Afif Shulhan; Zainul Faizien Haza; Maris Setyo Nugroho
Journal of Green Science and Technology Vol 6, No 2 (2022): JOURNAL OF GREEN SCIENCE AND TECHNOLOGY VOL.6 NO.2 SEPTEMBER 2022
Publisher : FAKULTAS TEKNNIK UNIVERSITAS SWADAYA GUNUNG JATI

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33603/jgst.v6i2.6890

Abstract

Introducing alternatives material on cement-based material manufacturing is the need for environmental sustainability due to the excessive mining of sand from quarry and river bed. At the same time, industrialization headed to an uncontrollable growth of waste. This fact encourages the researcher to enhance the utilization of recycled waste in construction practice. On one side, it affords a solution for waste management, and on the other hand, it contributes to an eco-friendly construction material that minimizes the environmental impact. This paper aims to investigate the usability of the iron waste obtained from the wrought iron industry, as natural fine aggregates replacement. In particular, it focused on studying the physical characteristic of waste aggregates and the effect of partial replacement of natural sand on mortar strength. Mortar cube specimen made with various levels of replacement (0%, 10%, 20% and 30 %) and also various cement-aggregates volumetric proportion, which are 1:3, 1:4, 1:5, 1:6, and 1:7. All of the measurement parameters are taken consecutively based on ASTM norms. The current work remarks that both waste aggregates and natural aggregates reveal complete fulfillment in the aggregate requirement of ASTM standard. Furthermore, the mortar cube test confirmed that the mortar passes the strength grade for N class and O class, which suitable for the above-grade and non-load bearing application.
THE EFFECT OF SALINITY ON OXYGEN TRANSFER PROCESS IN LEACHATE WITH A LOW INITIAL COD CONCENTRATION Moh Rizal Ngambah Sagara; Mega Mutiara Sari; Iva Yenis Septiariva; I Wayan Koko Suryawan
Journal of Green Science and Technology Vol 6, No 2 (2022): JOURNAL OF GREEN SCIENCE AND TECHNOLOGY VOL.6 NO.2 SEPTEMBER 2022
Publisher : FAKULTAS TEKNNIK UNIVERSITAS SWADAYA GUNUNG JATI

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33603/jgst.v6i2.6911

Abstract

Leachate is one of the results of rainwater infiltration and the degradation of microorganisms in waste. Some leachate types usually contain salinity which is an inhibitor in biological treatment processes. Aerobic biological treatment usually also requires sufficient dissolved oxygen (DO) levels. This study aimed to determine the effect of salinity on oxygen transfer in saline leachate. This study used a DO meter to measure the DO concentration in the 2 L volume reactor. There were two variations, namely leachate without salinity and with salinity 6 ppt, where the processing was carried out with three repetitions. The final oxygen transfer coefficients for the leachate without salinity and with salinity were 0.021 and 0.014, respectively. While the detention time required for leachate without salinity is 47.5 minutes, it takes 71.43 minutes with salinity.
ANALYSIS OF INFILTRATION WELLS AS PRO-CONSERVATION DRAINAGE (Case Study of Kalongan, Maguwoharjo, Depok, Sleman, Yogyakarta) Lilik Hendro Widaryanto
Journal of Green Science and Technology Vol 6, No 2 (2022): JOURNAL OF GREEN SCIENCE AND TECHNOLOGY VOL.6 NO.2 SEPTEMBER 2022
Publisher : FAKULTAS TEKNNIK UNIVERSITAS SWADAYA GUNUNG JATI

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33603/jgst.v6i2.6946

Abstract

Indonesia has two seasons, namely the dry season and the rainy season where the rainfall in the two seasons has a very large difference. Rainfall in the rainy season will be a source of groundwater reserves, because in the dry season there tends to be no rain. Efforts to increase groundwater reserves are carried out, among others, to use environmentally friendly drainage, namely by using infiltration wells and water will be infiltrated so as to reduce runoff.This research will begin by mapping the land covered by buildings in Kalongan and then calculating the area of land covered by the buildings. Rainfall data used is data at the Maguwoharjo rain station which is close to Kalongan with a span of 10 years. The number of infiltration wells currently available is 8 and by analyzing the needs of infiltration wells it will be known how many infiltration wells are needed so that as much water can be infiltrated to reduce runoff and increase groundwater reserves.The results of the frequency analysis for rainfall with a maximum return period of 5 years as a basis for planning infiltration wells. This large runoff during the rainy season can be reduced by having sufficient infiltration wells, so that rainwater entering the infiltration well will become a source of groundwater reserves. The total requirement for infiltration wells is 464 pieces with a diameter of 80 cm and a depth of 3 m. There are 8 infiltration wells so it is necessary to make 456 infiltration wells to reduce runoff.Keyword: groundwater, infiltration, runoff
DESIGN PROTOTYPE OF SMART DETECTOR ENVIRONMENT SYSTEM ON SEMICONDUCTOR DETECTOR STORAGE (HPGE) Rindi Wulandari
Journal of Green Science and Technology Vol 6, No 2 (2022): JOURNAL OF GREEN SCIENCE AND TECHNOLOGY VOL.6 NO.2 SEPTEMBER 2022
Publisher : FAKULTAS TEKNNIK UNIVERSITAS SWADAYA GUNUNG JATI

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33603/jgst.v6i2.7067

Abstract

The HPGe detector is a device that should be cooled when used and can be operated at room temperature. For this reason, it is necessary to monitor the temperature and humidity in the HPGe detector storage area to produce optimal performance. This research was focused on designing a Smart Detector Environment System as a means of monitoring and automatic control of temperature and humidity in the HPGe detector storage. Temperature and humidity detection in the system was carried out by the DHT22 sensor connected to Arduino Uno and the motor driver module. Arduino uno gave the command "00000011" to detect the temperature in the chamber, and "00000101" to start the detection of humidity in the chamber, then the data generated by the DHT22 sensor would be displayed and processed by LabVIEW, which was used to move the fan to regulate the temperature and humidity in the system with the condition that the lamp on the chamber was left on (manual).  The results obtained were in the form of a design and automatic control of temperature and humidity monitoring and control in the HPGe detector storage whose temperature could be adjusted automatically according to the needs of the HPGe detector.

Page 12 of 13 | Total Record : 121