cover
Contact Name
Wong Foek Tjong
Contact Email
duts_editor@petra.ac.id
Phone
-
Journal Mail Official
duts_editor@petra.ac.id
Editorial Address
-
Location
Kota surabaya,
Jawa timur
INDONESIA
Dimensi Utama Teknik Sipil
ISSN : -     EISSN : 26563312     DOI : https://doi.org/10.9744/duts
Core Subject : Engineering,
Jurnal Dimensi Utama Teknik Sipil (DUTS) promotes the widest possible dissemination of civil engineering knowledge by encouraging researchers to conduct research, build new or extend existing theoretical foundations, and contribute to practice at the corporate and national level. We aim to improve the dissemination quality in civil engineering field. The DUTS Journal welcomes technical/review/research papers, which publishes articles under the following fields: Construction Project Management, Construction Materials, Structural Engineering, and Geotechnical Engineering
Articles 155 Documents
OPTIMASI TRI-OBJECTIVE FINANCE-BASED SCHEDULING PROYEK FLY OVER X DENGAN MENGGUNAKAN METODE MULTI-OBJECTIVE SYMBIOTIC ORGANISMS SEARCH (MOSOS) Christopher Gunarso; Doddy Prayogo
Dimensi Utama Teknik Sipil Vol 9 No 1 (2022): April 2022
Publisher : Program Studi Magister Teknik Sipil - Petra Christian University

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.9744/duts.9.1.30-42

Abstract

Proyek konstruksi membutuhkan pengelolaan arus kas yang baik untuk keberlangsungan dan kesuksesan dalam melaksanakan pekerjaan-pekerjaan yang ada. Terdapat tiga aspek yang harus diperhatikan, yakni durasi dari proyek agar terhindar dari delay, pendanaan yang baik untuk mengatasi cost overrun, dan perhitungan bunga dari pendanaan dengan memperhatikan limit nominal yang ditentukan. Oleh karena itu, ketiga aspek tersebut diintegrasikan melalui finance-based scheduling yang akan ditinjau melalui proses optimasi tri-objective dengan menggunakan metode metaheuristik dalam mendapatkan solusi-solusi yang optimal. Pada penelitian ini, proses optimasi menggunakan Multi-Objective Symbiotic Organisms Search (MOSOS) berdasarkan studi kasus proyek fly over X. Hasil optimasi yang didapatkan berupa solusi-solusi yang tidak saling mendominasi dan analisis pengaruh pertambahan durasi dari skenario yang digunakan dilengkapi dengan cash flow dan kurva s.
PENERAPAN MULTI-OBJECTIVE PARTICLE SWARM OPTIMIZATION UNTUK OPTIMASI FINANCE-BASED SCHEDULING PADA PROYEK SOHO X DI SURABAYA Ambrosius Matthew Junius Reynaldo; Doddy Prayogo
Dimensi Utama Teknik Sipil Vol 9 No 1 (2022): April 2022
Publisher : Program Studi Magister Teknik Sipil - Petra Christian University

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.9744/duts.9.1.18-29

Abstract

Penjadwalan proyek dan kondisi keuangan perusahaan kontraktor untuk pendanaan selama aktivitas proyek merupakan dua aspek penting penentu keberhasilan proyek konstruksi. Konsep finance-based scheduling mengintegrasikan penjadwalan proyek dan pendanaan untuk menghindari pembengkakan biaya dan keterlambatan. Metode metaheuritsik digunakan untuk membantu menyelesaikan permasalahan optimasi finance-based scheduling. Proses optimasi dengan Multi-Objective Particle Swarm Optimization (MOPSO) dilakukan untuk meminimalkan ketiga aspek dalam finance-based scheduling yaitu durasi proyek, besarnya pinjaman dana yang dibutuhkan, dan besarnya bunga dari pinjaman yang dilakukan oleh kontraktor berdasarkan studi kasus proyek SOHO X di Surabaya. Hasil dari proses optimasi adalah solusi-solusi berupa skenario penjadwalan yang dapat dipilih oleh kontraktor berdasarkan what-if analysis sesuai dengan tingkat kepentingan kontraktor.
MULTI-MODE RESOURCE CONSTRAINED MULTI PROJECT SCHEDULING PROBLEM OPTIMIZATION WITH SYMBIOTIC ORGANISMS SEARCH Valentinus Alvin Hodianto; Yang I-Tung
Dimensi Utama Teknik Sipil Vol 9 No 1 (2022): April 2022
Publisher : Program Studi Magister Teknik Sipil - Petra Christian University

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.9744/duts.9.1.77-96

Abstract

Multi-mode resource-constrained multi project scheduling problem (MRCMPSP) is the extension of standard resource constrained project scheduling problem which considers multiple activity execution modes and multiple projects, subject to precedence and resource constraints. Multiple execution modes allow the activities to have different duration and resource requirement. Furthermore, companies and project managers normally also handle many projects. This study proposed metaheuristic method Symbiotic Organisms Search (SOS) along with random-key (RK) representations, parallel schedule generation scheme (P-SGS), and forward backward scheduling, to find the feasible schedule and minimal project duration of the project portfolio. The evaluation results from standard benchmark instances shows that SOS can get the best solution in most of the tested instances and also achieve better solution in some of them. The validation results from real project case MRCMPSP show that SOS has better performance than other tested metaheuristic methods, namely GA and PSO. Thus, validate the performance of SOS.
SPEED OF ADJUSTMENT PADA PERUSAHAAN PROPERTI DAN REAL ESTAT YANG TERCATAT DI BURSA EFEK INDONESIA Gilbert Alexander; Njo Anastasia; Christiono Utomo
Dimensi Utama Teknik Sipil Vol 9 No 1 (2022): April 2022
Publisher : Program Studi Magister Teknik Sipil - Petra Christian University

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.9744/duts.9.1.43-59

Abstract

Tujuan dari penelitian ini adalah untuk mengetahui faktor-faktor yang signifikan yang mempengaruhi keputusan perusahaan properti dan real estat di Indonesia dalam menyesuaikan struktur modalnya, beserta speed of adjustment menuju nilai target. Faktor-faktor yang diuji meliputi profitabilitas, tangibilitas, ukuran, market-to-book value, industry median leverage, rate inflasi secara umum, dan market stock return. Penelitian menggunakan data laporan keuangan perusahaan properti dan real estat dari Bursa Efek Indonesia, tahun 2010 sampai dengan 2019. Teknik analisis yang dipilih untuk menganalisis data dan menguji hipotesis dalam adalah regresi linear. Hasil analisis dapat disimpulkan bahwa variabel profitabilitas, ukuran perusahaan, dan market-to-book value berpengaruh signifikan terhadap leverage pada perusahaan subsektor properti dan real estat yang tercatat di BEI periode 2010 s.d. 2019. Dari hasil penelitian, ditemukan juga bahwa perusahaan properti dan real estat di Indonesia memiliki speed of adjustment sebesar 53,43%.
BI-OBJECTIVE OPTIMIZATION FOR REBAR CUTTING PLAN USING SYMBIOTIC ORGANISMS SEARCH Aucky Sugianto; Yang I Tung
Dimensi Utama Teknik Sipil Vol 9 No 1 (2022): April 2022
Publisher : Program Studi Magister Teknik Sipil - Petra Christian University

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.9744/duts.9.1.1-17

Abstract

The construction industry is one of the biggest industries in the world. One of the most important materials in this industry is the reinforced steel bar. In construction site usually fabricated the reinforced steel bars into the form of one-dimensional stocks and designed according to the structural specification and installed in various structural components such as columns, beam, slab, and foundation. The purpose of cutting stock problems for reinforced steel bars (rebar cutting plan, RCP) is to satisfy the project requirements and also to minimize the cutting losses, which is the major contributor to the construction waste As there are two objective functions, we call the problem bi-objective rebar cutting plan (B-RCP). In the previous research, efforts developed the metaheuristics method to minimize the cutting losses in preliminary engineering designs but it few to consider about simplicity in order to achieve efficient work. Thus, this research applies the bi-optimization with epsilon constraint in order to find the trade-off solution between the material waste and number of cutting pattern for decision making. This study proposed the metaheuristic method Symbiotic Organisms Search (SOS) to solve B-RCP in one framework, to find the feasible cutting patterns along with the minimum total waste of the reinforced steel bar. To test the performance of the proposed SOS framework, the previous study case is set to be a benchmark, and then create a comparison with PSO. For real project instances of RCP are used to evaluate and validate the performance of SOS. The validation results from both cases of RCP show that SOS has better performance than PSO in both minimize the material waste along reducing the number of cutting patterns. Thus, it is validated that SOS is a competitive algorithm for solving the RCP.
OPTIMASI BIAYA PONDASI SETEMPAT DENGAN METODE METAHEURISTIK Vania Regina Husada; Ferdian Nathanael; Doddy Prayogo; Y T Teddy Susanto
Dimensi Utama Teknik Sipil Vol 7 No 2 (2020): Oktober 2020
Publisher : Program Studi Magister Teknik Sipil - Petra Christian University

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.9744/duts.7.2.47-52

Abstract

Pondasi adalah bagian dari struktur bangunan yang berfungsi meneruskan beban struktur atas ke lapisan tanah dengan aman. Sementara pondasi dangkal digunakan apabila lapisan tanah keras terletak dekat dengan permukaan tanah. Untuk mendapatkan hasil desain pondasi dangkal yang optimal, terdapat tiga kriteria penting yang harus diperhatikan yaitu ultimate limit state (ULS), serviceability limit state (SLS), dan ekonomis. Penggunaan metode optimasi yang baik akan membantu menghasilkan dimensi pondasi yang optimal dan ekonomis namun tetap memenuhi syarat aman. Penelitian ini menggunakan metode metaheuristik particle swarm optimization (PSO) dan symbiotic organisms search (SOS) untuk menyelesaikan permasalahan optimasi pondasi dangkal. PSO dan SOS bekerja untuk menemukan solusi dimensi pondasi setempat yang diharapkan dapat memiliki biaya konstruksi terendah dan dibatasi oleh constraint dari SNI 8460:2017, SNI 2847:2013, dan bearing capacity theory. Hasil penelitian menunjukkan bahwa SOS memiliki performa yang lebih baik dari PSO untuk studi kasus bangunan dua lantai.
PERGERAKAN HARGA RUMAH DI INDONESIA: ANALISIS SISI PERMINTAAN Ivana Merryawati Roeskamto; Adwin Surja Atmadja
Dimensi Utama Teknik Sipil Vol 7 No 2 (2020): Oktober 2020
Publisher : Program Studi Magister Teknik Sipil - Petra Christian University

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.9744/duts.7.2.53-59

Abstract

Penelitian ini mengobservasi pengaruh variabel-variabel permintaan seperti pendapatan masyarakat, jumlah pembeli, harga apartemen, ekspektasi harga rumah, dan juga suku bunga KPR terhadap harga rumah residensial di Indonesia pada periode 2012 hingga 2018. Hasil penelitian menunjukkan bahwa suku bunga KPR, pendapatan masyarakat dan ekspektasi harga rumah berpengaruh negatif terhadap harga properti residensial, sedangkan bertambahnya jumlah pembeli meningkatkan harga rumah residensial.
ANALISIS PENJADWALAN PROYEK KONSTRUKSI MENGGUNAKAN SIMULASI MONTE CARLO STUDI KASUS: PEMBANGUNAN RUMAH TINGGAL DI SURABAYA Vanessa Paramitha Teguh; Januar Budiman; Paul Nugraha
Dimensi Utama Teknik Sipil Vol 9 No 2 (2022): Oktober 2022
Publisher : Program Studi Magister Teknik Sipil - Petra Christian University

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.9744/duts.9.2.156-167

Abstract

Salah satu indikator keberhasilan suatu proyek adalah ketika durasi pelaksanaan proyek tidak lebih dari jadwal rencana yang diperhitungkan sebelumnya. Oleh karena itu, perlu menciptakan jadwal proyek yang akurat dengan memperhitungkan resiko serta ketidakpastian. Salah satu caranya, yaitu dengan menggunakan metode simulasi monte carlo. Pada penelitian ini, digunakan data historis sebagai data pendukung untuk menghasilkan jadwal pekerjaan secara probabilistik dengan menggunakan simulasi monte carlo. Selain itu, pada penelitian ini diteliti juga distribusi probabilistik mana yang lebih tepat digunakan berdasarkan dari data historis yang didapatkan. Kesimpulan yang dicapai adalah penggunaan simulasi monte carlo dapat menghasilkan durasi dalam bentuk probabilistik sehingga dapat memperhitungkan resikoresiko ketidakpastian. Distribusi yang lebih tepat digunakan untuk mengestimasi durasi probabilistik untuk masing-masing aktivitas yaitu dengan menggunakan fitted distribution.
PREDIKSI KEBANGKRUTAN DENGAN METODE ANN, SVM, DAN CART PADA PERUSAHAAN PROPERTI, KONSTRUKSI, DAN INDUSTRI SEJENIS YANG TERDAFTAR DI BEI Rafael Reinaldo Loren; Doddy Prayogo; Januar Budiman
Dimensi Utama Teknik Sipil Vol 9 No 2 (2022): Oktober 2022
Publisher : Program Studi Magister Teknik Sipil - Petra Christian University

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.9744/duts.9.2.136-155

Abstract

Sifat ketidakpastian dalam sektor konstruksi, properti, real estate dan industri sejenis membuat sektor ini rentan menghadapi financial distress. Saat ini, metode yang digunakan untuk memprediksi status finansial perusahaan adalah pendekatan linier, sedangkan tidak semua variabel menunjukkan korelasi linear terhadap kesehatan finansial sebuah perusahaan. Penelitian bertujuan untuk menemukan model prediksi yang paling akurat dalam memprediksi indikasi financial distress dengan menggunakan kecerdasan buatan(AI). Metode AI yang digunakan dalam penelitian ini adalah ANN, SVM, dan CART. Metode ini digunakan untuk menganalisis tiga dataset rasio keuangan dari model peneliti terdahulu pada prediksi tiga dan lima tahun. Hasil terbaik dari pengolahan data kemudian dianalisis dengan confusion matrix untuk menentukan metode yang memiliki tingkat akurasi tertinggi. Hasil penelitian menunjukkan bahwa metode ANN memiliki tingkat akurasi paling tinggi terbanyak. Dataset dari peneliti Cheng et al. (2014) memiliki tingkat akurasi tertinggi pada hasil prediksi tiga tahun dengan metode CART dan lima tahun dengan menggunakan metode ANN.
FAKTOR-FAKTOR YANG MEMPENGARUHI KOMUNIKASI DAN KOMPETENSI ANTARA ARSITEK DAN KLIEN TERHADAP KEBERHASILAN PROYEK Jenny Larasati Sarah; Herry Pintardi Chandra; Jani Rahardjo
Dimensi Utama Teknik Sipil Vol 9 No 2 (2022): Oktober 2022
Publisher : Program Studi Magister Teknik Sipil - Petra Christian University

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.9744/duts.9.2.184-199

Abstract

Komunikasi antara arsitek dengan klien merupakan kunci utama dalam keberhasilan suatu proyek. Maka jika terjadi kesalahpahaman dalam berkomunikasi antara keduanya dapat menyebabkan konsekuensi yang sangat fatal yaitu kegagalan proyek. Beberapa faktor yang dapat menunjang faktor-faktor yang mempengaruhi komunikasi antara arsitek dan klien, antara lain manajemen komunikasi, kompetensi arsitek yang dapat membantu memperbaiki proses komunikasi klien, dan kriteria keberhasilan proyek (project objective). Penelitian ini membahas faktor-faktor yang mempengaruhi komunikasi antara arsitek dan klien dari perspektif arsitek dan klien. Proses pengumpulan data menggunakan data hasil kuesioner arsitek-klien wilayah Surabaya-Malang dan sekitarnya yang ditekankan kepada arsitek yang mengikuti organisasi IAI (Ikatan Arsitek Indonesia). Kemudian, hasil pengumpulan data diolah menggunakan SPSS dan dilakukan analisa berdasarkan literatur yang sesuai. Kesimpulan yang didapat pada penelitian ini, arsitek harus memiliki kompetensi yang dibutuhkan untuk meningkatkan dan memperbaiki praktik menajemen komunikasi dengan klien mereka, sehingga komunikasi antara arsitek dan klien dapat mencapai keberhasilan proyek.

Page 9 of 16 | Total Record : 155