cover
Contact Name
Pinto Anugrah
Contact Email
pinto@eng.unand.ac.id
Phone
+6275172497
Journal Mail Official
ajeeet@eng.unand.ac.id
Editorial Address
Gedung Jurusan Teknik Elektro Lantai 2. Fakultas Teknik Universitas Andalas, Limau Manis, Pauh, Padang City, West Sumatra 25163
Location
Kota padang,
Sumatera barat
INDONESIA
Andalas Journal of Electrical and Electronic Engineering Technology
Published by Universitas Andalas
ISSN : -     EISSN : 27770079     DOI : -
Electrical power and energy: Transmission and distribution, high voltage, electrical energy conversion, power electronics and drive. Telecomunication and Signal Processing: Antenna and wave propagation, network and systems, Modulation and signal processing, Radar and sonar, Radar imaging; Radio, multimedia content, Routing protocols, Wireless communications, Signal Processing, Image Processing, Voice Processing. Control automation and Robotic: Robotics, Automation, Pattern Recognition, Biosignal Engineering, Control Theory, Applied Control, System Design, Optimization, Process Control, Sensor. Research in Electrical and Electronic Engineering Education.
Articles 29 Documents
Estimation of the Shoulder Joint Angle using Brainwaves Minoru Sasaki; Takaaki Iida; Joseph Muguro; Waweru Njeri; Pringgo Widyo Laksono; Muhammad Syaiful Amri bin Suhaimi; Muhammad Ilhamdi Rusydi
Andalas Journal of Electrical and Electronic Engineering Technology Vol. 1 No. 1 (2021): May 2021
Publisher : Electrical Engineering Dept, Engineering Faculty, Universitas Andalas

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (1224.625 KB) | DOI: 10.25077/ajeeet.v1i1.5

Abstract

This paper presents the angle of the shoulder joint as basic research for developing a machine interface using EEG. The raw EEG voltage signals and power density spectrum of the voltage value were used as the learning feature. Hebbian learning was used on a multilayer perceptron network for pattern classification for the estimation of joint angles 0o, 90o and 180o of the shoulder joint. Experimental results showed that it was possible to correctly classify up to 63.3% of motion using voltage values of the raw EEG signal with the neural network. Further, with selected electrodes and power density spectrum features, accuracy rose to 93.3% with more stable motion estimation.
Harmonics Analysis of Input Current of 3-Phase PWM Rectifier Alfin Prima Adjie; Muhammad Imran Hamid
Andalas Journal of Electrical and Electronic Engineering Technology Vol. 1 No. 1 (2021): May 2021
Publisher : Electrical Engineering Dept, Engineering Faculty, Universitas Andalas

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (566.183 KB) | DOI: 10.25077/ajeeet.v1i1.6

Abstract

Rectifier is a non-linier load that causes harmonic distortion in the power system. Pulse-width modulation (PWM) method is an effective method in pressing the magnitude of harmonics in a rectifier application, it provides an almost sinusoidal input current. However, the variation of loads that supplied by a rectifier cause the harmonics that arise can still beyond the applicable standard. The amount of harmonics in the operating range of a rectifier need to be identified to determine the filter on the input side. In this research article, 3-phase PWM rectifier was designed with hysteresis current control technique using PSCAD software simulation. Harmonic compensation was carried out by applying an active filter based on P-Q theory to reduce the harmonic distortion that occurs in the input current, thus giving a low total harmonic distortion (THD) value. Based on the simulation, 3-phase PWM rectifier operation starting at a power level of 150 kW, giving a THD value above 5-10% by the increasing the amount of load supplied by the rectifier. The application of active filter based on the P-Q theory is able to compensate harmonics in the input current wave with a THD value below 5% in the rectifier operating range.
Implementation of Ultrasonic Sensor as a Radar for Obstacle Detection Ahmad Suaif; Ferizandi Qauzar Gani
Andalas Journal of Electrical and Electronic Engineering Technology Vol. 1 No. 1 (2021): May 2021
Publisher : Electrical Engineering Dept, Engineering Faculty, Universitas Andalas

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (648.137 KB) | DOI: 10.25077/ajeeet.v1i1.7

Abstract

The Arduino UNO, ultrasonic sensor, servo motor, and Processing as visual software was used to create a low cost ultrasonic radar system that can detect and determine the location of an object, such as obstacles, in a short distance. Objects can be sensed up to 40 cm away from the ultrasonic sensor and the ultrasonic radar's angular rotation can detect objects from 15o to 165o and counterclockwise. The obstacle objects will be displayed in the computer panel by running the visual software. A comparative analysis of the distance error between the radar and the obstacles is used to assess the feasibility of the proposed system. The findings obtained from measurements of the obstacles are tabled to show that the planned design achieved a relatively small error, with 90% as the lowest accuracy.
UVC Sterilization Robot Application for Covid-19 Based on Wireless Communication Hanalde Andre
Andalas Journal of Electrical and Electronic Engineering Technology Vol. 1 No. 1 (2021): May 2021
Publisher : Electrical Engineering Dept, Engineering Faculty, Universitas Andalas

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (341.011 KB) | DOI: 10.25077/ajeeet.v1i1.8

Abstract

In this research, a sterilization UVC robot will be designed and implemented using wireless communication. The robot can be controlled using a platform that can move the robot and is assisted by a camera to see the condition of the environment. ESP32-CAM is used to control robot via wireless communication and video assisted. The robot has two UVC lamps installed above to form a 360-degree light coverage area. The camera is at the front and is flanked by two lights to add lighting to get good video results. External antennas are used to increase the wireless communication range. The measurement results vis Wireshark obtained a delay value of 347 ms with a throughput of 358 kb/s. This value is included in the moderate category for data communication classification.
Load Flow Analysis and Short Circuit Faults with the Additional Distributed Generation Wind Turbine 300 kW at Andalas University Fadhel Putra Winarta; Yoli Andi Rozzi
Andalas Journal of Electrical and Electronic Engineering Technology Vol. 1 No. 1 (2021): May 2021
Publisher : Electrical Engineering Dept, Engineering Faculty, Universitas Andalas

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (492.399 KB) | DOI: 10.25077/ajeeet.v1i1.9

Abstract

The study of electric power flow analysis (Load Flow) is intended to obtain information about the flow of power or voltage in an electric power system network. This information is needed to evaluate the performance of the power system. Electrical power flow problems include calculating the flow and system voltage at certain terminals or buses. The benefits of this power flow study are to find out the voltage at each node in the system, to find out whether all the equipment meets the specified limits to deliver the desired power, and to obtain the original conditions in the new system planning. This study is divided into two: the analysis of data when the conditions have not been added wind turbine and after the addition of 300 kW wind turbine with software power station ETAP software 12.6.0 and the Newton-Raphson method will be used in analyzing the power flow of the electric power system. Based on the results of the tests, it is found that the overall value of losses for power flow before the addition of DG is 0.031 MW and 0.037 Mvar, for the voltage drop with the lowest percentage, namely on bus 10 with a percentage of 96.45 for the 0.4 kV system and the 20 kV system on bus 19 with a percentage of 99.03, the largest% PF load was in lump 1 with 98.64 and the smallest% PF was in lump7 with a value of 84.92. The short circuit data value on the 20 kV bus system at Andalas University before the addition of DG with 3-phase disturbances averaged 13.354 A, 1-phase disturbances averaged 3.521 A, 2-phase disturbances averaged 11.719 A and 2 ground phases of 12.842 A Whereas for the value of power flow after the addition of DG in the form of the wind turbine of 300 kW the overall value of losses is 0.032 MW and 0.042 MvarAR, for the voltage drop with the percentage for voltage drop with the lowest percentage is bus 10 with a percentage of 96.63 for system 0, 4 kV and a 20 kV system on bus 14 with a percentage of 98.1, the largest% PF load is in lump 1 with 98.64 and the smallest% PF is in lump7 with a value of 84.92. The short circuit data value on the 20 kV bus system at Andalas University after the addition of DG with 3 phase disturbances has an average value of 13.354 A, 1 phase disturbance averages 3.523 A, 2 phase disturbances average 11.737 A and 2 phases ground is 12.059 A For the source in this system, after the addition of DG, there was a change in the% PF of the PLN grid, namely 79.53 and the wind turbine -83%.
Analysis of an Off-grid PV System for Disaster Mitigation Scheme in Remote Areas Pinto Anugrah; Putty Yunesti; Guna Bangun Persada
Andalas Journal of Electrical and Electronic Engineering Technology Vol. 1 No. 1 (2021): May 2021
Publisher : Electrical Engineering Dept, Engineering Faculty, Universitas Andalas

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (398.509 KB) | DOI: 10.25077/ajeeet.v1i1.10

Abstract

The main objective of this paper is to present the techno-economic analysis of an off-grid Photovoltaic system, which prepared to support disaster mitigation scheme in remote areas. As a case study, a regency in Mentawai Island, Sumatera Barat is chosen to represent a remote area in a disaster-prone location. The proposed system capacity is 20 kWp PV system as a single electricity source for medical facility in the island. As a tool in this study, RETScreen software was used to analyze the technical, environmental, and economical feasibility analysis. As a base case scenario, the medical facility was supported by a diesel-fueled generator and the PV system can deliver 10.14 MWh of electricity to load annually. Net annual GHG emission reduction of the system is 19.4 ton of CO2 equivalent. With the total initial cost for the whole PV system at USD 41,380, RETScreen simulation result showed that the equity payback of the project is 6.0 years with IRR of 11.9% hence the project is financially viable.
Economic and Financial Analysis of Cofiring the Coal Fired Steam Power Plant Capacity 660 MW with Biomass Widya Faisal Wahyudi; Iwa Garniwa M.K.
Andalas Journal of Electrical and Electronic Engineering Technology Vol. 1 No. 1 (2021): May 2021
Publisher : Electrical Engineering Dept, Engineering Faculty, Universitas Andalas

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (364.739 KB) | DOI: 10.25077/ajeeet.v1i1.11

Abstract

Research on Cofiring of the Existing Coal Fired Power Plant with biomass in the form of sawdust with a mixture percentage of 5% was carried out with the main objective of pursuing the acceleration of the renewable energy mix target of 23% (Green Booster) by 2025, with minimal CAPEX costs if compared to building new hydro or solar PV plants. At the initial stage of the activity, testing and analysis of the effect of cofiring will be carried out on several main parameters of the Existing PLTU's performance, as well as its reliability. In addition, it is also at the same time to get an overview and evaluate if the cofiring plan will be implemented through technical operational evaluations, the cost of production from the aspect of fuel costs (component C) and exhaust emissions to the environment. From the results of monitoring the operating load at around 635 MW (gross) using 5% cofiring, it can be seen that critical points such as main steam temperature, main steam pressure, gas economizer outlet temperature, mill outlet temperature do not show a significant increase, meaning they are still within the operating limits, reasonable and safe. From the calculation of the cost of fuel, the coal price is IDR 594 per kg, and sawdust price of IDR 472 per kg (on site) using the SFC difference of 0.0077 kg/kwh, and the CF assumption of 80%, then with an average annual electricity production of 4,415,040,000 kwh/year, fuel savings of around IDR 35.32 billion per year will be obtained. Exhaust gas emissions to the environment for SO2 and NOx still meet the environmental quality standard requirements according to the Minister of Environment and Forestry Regulation No.15 of 2019.
Real-Time SoC Estimation for Li-Ion Batteries using Kalman Filter based on SBC Raspberry-Pi Zaini Zaini; Dwi Mutiara Harfina; Agung P Iswar
Andalas Journal of Electrical and Electronic Engineering Technology Vol. 1 No. 2 (2021): November 2021
Publisher : Electrical Engineering Dept, Engineering Faculty, Universitas Andalas

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (729.185 KB) | DOI: 10.25077/ajeeet.v1i2.12

Abstract

Measurement of electric charge on the battery in real-time cannot be separated from external noise and disturbances such as temperature and interference. An optimal State of Charge (SoC) estimator model is needed to make the estimation more accurate. To obtain the model, the battery was tested under room temperature conditions and at a temperature of 40oC to obtain a second-order RC model for the Li-Ion battery used. Based on the test data obtained, the data will be tested first using the Kalman Filter method to get an estimate of the State of Charge (SoC). Tests were carried out using MATLAB software. After the method was tested, the online SoC Estimator design began using the Raspberry Pi Single Board Computer (SBC). After that, the estimator will be tested first using data from offline measurements and then used in real-time (online) SoC estimation measurements. The Voc before the battery discharge test was 13.16 V and after the test, the measured Voc was 11.58 V. During the discharge the Voc was reduced by 1.58 V. While the discharge data from the battery manufacturer showed the reduced Voc during the discharge was 1.2V.
The Study of the Effect of Capacity Increase and Photovoltaic Placement on Power Loss, Voltage Profile by Considering THDv Syukri Yunus; R.H. Sukma
Andalas Journal of Electrical and Electronic Engineering Technology Vol. 1 No. 2 (2021): November 2021
Publisher : Electrical Engineering Dept, Engineering Faculty, Universitas Andalas

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (329.381 KB) | DOI: 10.25077/ajeeet.v1i2.13

Abstract

The application of Photovoltaic (PV) is one solution to the increasing demand for electrical energy. However, the application of photovoltaic (PV) must be in the right location and capacity so that the power loss you want to reduce is large and the voltage profile is good. Photovoltaic (PV) generates DC voltage which is then required by an inverter to convert it to AC. The inverter is a non-linear load that produces harmonics. Harmonics in an electric power system can be known from Total Harmonic Distortion (THD). The purpose of this study is to determine the optimal location of placement (PV) and its maximum capacity so that the power loss is smaller. The resulting voltage and THD profile conform to the permitted standards. The methods used in determining the optimal location of photovoltaic (PV) are Loss Sensitivity Factor (LSF) and Voltage Sensitivity Index (VSI). ETAP 16 software is used for power and harmonic flow simulation. From this research, the most optimal photovoltaic (PV) placement is on bus 10 (bus 283 T) with a maximum capacity of 3255 kVA. This placement location provides minimal power loss and a good voltage profile taking into account the permitted standard THDv.
Digital Stethoscope to Examine Patients According to Technical Guidelines of Covid-19 Muhammad Ilhamdi Rusydi; M. Farhan; Yoan Winata; Dhiny Yurichy Putri; Muhammad Dani Anwar; Daelita Berliana H.
Andalas Journal of Electrical and Electronic Engineering Technology Vol. 1 No. 2 (2021): November 2021
Publisher : Electrical Engineering Dept, Engineering Faculty, Universitas Andalas

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (491.812 KB) | DOI: 10.25077/ajeeet.v1i2.14

Abstract

Health professionals have to use Personal Protective Equipment (PPE) that could cover the entire body to prevent the transmission of the SARS-CoV-2 virus while examining patients. The current stethoscope is not compatible with the need of health professionals. Therefore, this project aims to create a digital stethoscope that can fulfill the requirement of health professionals to examine patients according to health service guidance in Covid-19 era. Three main objectives in designing the stethoscope are to meet the needs of health professionals, easy and convenient to use. The designed stethoscope has an amplifier circuit with 100 gain and a bandpass filter with 20 Hz and 700 Hz for low and high cut-off frequencies. It is also able to calculate the heart rate and displays it on the stethoscope screen. The stethoscope has a record function that lets the users replay sound as much as they need for the analysis. This digital stethoscope has function tests, performance tests and user satisfaction tests. Seven health professionals who are well-experienced in handling Covid-19 patients auscultate and provide an assessment of the three objectives design. The test results showed that this stethoscope satisfies the health professional’s requirements to examine the patient, grade 4.69 of 5. Health professionals also give a perfect rating for the objective of being easy to use. This stethoscope is the right choice for examining patients according to health service guidance in the Covid-19 era.

Page 1 of 3 | Total Record : 29