cover
Contact Name
-
Contact Email
-
Phone
-
Journal Mail Official
-
Editorial Address
-
Location
Kota adm. jakarta barat,
Dki jakarta
INDONESIA
Industrial and Systems Engineering Assessment Journal (INASEA)
ISSN : -     EISSN : -     DOI : -
Core Subject : Engineering,
Arjuna Subject : -
Articles 7 Documents
Search results for , issue " Vol 6, No 1 (2005): INASEA Vol. 06 No. 1" : 7 Documents clear
MENGOPTIMALKAN PERSEDIAAN BAHAN BAKU UTAMA BEGACRON BLACK GI 200%: STUDI KASUS PT COLORINDO ANEKA CHEMICALS Sutono, Sutono; Taufik, Taufik
Industrial and Systems Engineering Assessment Journal (INASEA) Vol 6, No 1 (2005): INASEA Vol. 06 No. 1
Publisher : Industrial and Systems Engineering Assessment Journal (INASEA)

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Main problem in planning and controlling supply is to determine how many order of the main material or raw material is done and when the order should be done so the production can smoothly run and increase the efficientcy of the production process. The wrong supply control will make customer’s demand cannot be fulfilled on time. Besides that, the trust and customer opinion on company will decline. Therefore, a planning and control supply is needed to achieve a maximum result.
SIMULATOR PENYEDIA LAYANAN APLIKASI LOCATION BASED SERVICE PADA SISTEM LOCATION PLATFORM Soegandi, Andreas
Industrial and Systems Engineering Assessment Journal (INASEA) Vol 6, No 1 (2005): INASEA Vol. 06 No. 1
Publisher : Industrial and Systems Engineering Assessment Journal (INASEA)

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Location based service using positioning system technology, known as Location Based Service (LBS), is the newest cellular technology that is commonly used service based on SMS. The purpose of this research is to make a software in form of LBS application service provider simulator that can help to develop the LBS application, especially in Location Platform system. The result is a software application that can be used in LBS application development without disturbing the running system application performance, support the productivity, and can be used as simulation to see the LBS application result.
ANALISIS PENGARUH INPUT PELATIHAN TERHADAP PEMBELAJARAN DAN GENERALISASI: STUDI KASUS PELATIHAN MANAJEMEN KEUANGAN PENGUSAHA KECIL Hariyatie, Nira
Industrial and Systems Engineering Assessment Journal (INASEA) Vol 6, No 1 (2005): INASEA Vol. 06 No. 1
Publisher : Industrial and Systems Engineering Assessment Journal (INASEA)

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

The achievement of trainees in transferring the knowledge and skill developed during training in their job is an important factor to measure the success of training. The objective of research was to examine how the training input, trainee characteristics, training design, and work environment were important factors in determining the success of trainee learning process. Furthermore, the result shows that the trainee’s characteristics, training design, and work environment are the significant factor in influencing trainee in applying their knowledge and skill gained at training to their job.
PENGENDALIAN KUALITAS PROSES EDIT PROGRAM PENGERJAAN MOULD: STUDI KASUS PT ASTRA HONDA MOTOR A., Anggara Hayun
Industrial and Systems Engineering Assessment Journal (INASEA) Vol 6, No 1 (2005): INASEA Vol. 06 No. 1
Publisher : Industrial and Systems Engineering Assessment Journal (INASEA)

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Time process to make molding is highly influenced by machining process. So to increase productivity, it must be avoided the machining lost time from production process. Therefore, it needs control to the usage of machine. As a control that had been done is to find main cause factor why cnc machine runs unproperly, by sampling method to measure lost time happened in order to get optimum condition. The result of the activity shows how long lost time can be tolerated.
PENERAPAN SISTEM PERENCANAAN KEBUTUHAN KOMPONEN UNTUK MEMENUHI KEBUTUHAN HUB TIPE SUPRA PADA PT ASTRA HONDA MOTOR Arifin, Yusuf; Fadlillah, Siti Nur
Industrial and Systems Engineering Assessment Journal (INASEA) Vol 6, No 1 (2005): INASEA Vol. 06 No. 1
Publisher : Industrial and Systems Engineering Assessment Journal (INASEA)

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Planning system of customer needs in Astra Honda Motor Company using Material Requirement Planning system with order applying several metods, for example Lot for Lot, POQ, and EOQ. The disadvantages of those applied system is not knowing which method is the most advantages. Therefore, a research on how to compare the having cost for each method is needed. The result, Lot For Lot (LFL) method is the method  minimal cost.
STUDI KEKUATAN LELAH TEKUK PADA BESI POROS ENGKOL 2 SILINDER UNTUK ENGINE RUSNAS 500 CC Josowidagdo, Landjono
Industrial and Systems Engineering Assessment Journal (INASEA) Vol 6, No 1 (2005): INASEA Vol. 06 No. 1
Publisher : Industrial and Systems Engineering Assessment Journal (INASEA)

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Nodular cast iron is increasingly being used in mass production of automotive engine crankshaft. A better understanding of characteristics of bending fatigue strength of the iron crankshaft is necessary to further the use of the material in this application. The research deals with Engine Rusnas 500 CC  with  iron crankshaft  concerning the fatigue behaviors and influential factors.
INTERNATIONAL MOBILE TELECOMMUNICATION-2000 (IMT-2000) Dulbert, Biatna; W., Denny; A., Dhandy
Industrial and Systems Engineering Assessment Journal (INASEA) Vol 6, No 1 (2005): INASEA Vol. 06 No. 1
Publisher : Industrial and Systems Engineering Assessment Journal (INASEA)

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

International Mobile Telecommunication-2000 (IMT-2000) is a third-generation mobile communication system. It has been established as an international standard to realize advanced services and also overcome the performance limitations of the telephone and data communication services that are based on existing second-generation mobile communication systems (i.e., Personal Digital Cellular (PDC), CDMAOne, and Global Systems for Mobile communications (GSM). This research outlines the services recommended in IMT-2000 and describes the base station systems, switching systems, and various servers of the IMT-2000 network architecture.

Page 1 of 1 | Total Record : 7