cover
Contact Name
-
Contact Email
-
Phone
-
Journal Mail Official
-
Editorial Address
-
Location
Kota adm. jakarta barat,
Dki jakarta
INDONESIA
Industrial and Systems Engineering Assessment Journal (INASEA)
ISSN : -     EISSN : -     DOI : -
Core Subject : Engineering,
Arjuna Subject : -
Articles 7 Documents
Search results for , issue " Vol 8, No 2 (2007): INASEA Vol. 08 No.2" : 7 Documents clear
EL SIMULASI SISTEM PELAYANAN RESTORAN YURAKU KOMPLEK D’BEST KELAPA GADING Sukwadi, Ronald
Industrial and Systems Engineering Assessment Journal (INASEA) Vol 8, No 2 (2007): INASEA Vol. 08 No.2
Publisher : Industrial and Systems Engineering Assessment Journal (INASEA)

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Yuraku Restaurant in Kelapa Gading area which opens only from 6 p.m to 10 p.m., is very famous for its good taste. Yuraku is also well known for its service system in which the server it self will serve the food for the customer, so that they don’t have to serve their own food.The research aims to develop a simulation model from the real system currently employed at Yuraku Restaurant. The research consisted of four main steps namely description model, conceptual development model, input data analysis, and simulation modeling. During input data analysis, homogenity test using Kruskal Wallis test and distribution fitting were conducted. Output of ARENA simulation allowed a deeper understanding of the real condition of Yuraku’s system. It is shown that the system performance of Yuraku restaurant is good enough, though some improvements are needed in the long term.
PENGEMBANGAN MODEL KEPUTUSAN PENERIMAAN ORDER BERBASIS PENJADWALAN MESIN PARALEL NON IDENTIK DENGAN ALGORITMA GENETIKA Arryadi, Rizal; Behardi, Ami Amalia
Industrial and Systems Engineering Assessment Journal (INASEA) Vol 8, No 2 (2007): INASEA Vol. 08 No.2
Publisher : Industrial and Systems Engineering Assessment Journal (INASEA)

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Article focused on the implementation of genetic algorithms in scheduling parallel, non-identical machines in a make-to-order environment, with the objective of maximizing profit. Eventually, the model will further be used for an order acceptance model in a garment company. A new chromosome representation has beens developed in order to simplify the crossover and mutation in the algorithm. Performance investigation of the genetic algorithm is provided for the purpose of avoiding local optima and accelerating the algorithm in reaching a good solution.
PENGENDALIAN PERSEDIAAN BAHAN BAKU CRUDE COCONUT OIL (CCO) PADA PT PALKO SARI EKA Fadlillah, Siti Nur
Industrial and Systems Engineering Assessment Journal (INASEA) Vol 8, No 2 (2007): INASEA Vol. 08 No.2
Publisher : Industrial and Systems Engineering Assessment Journal (INASEA)

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Inventory system is one of the essential managerial functions because most of companies have a big investment in this aspect. PT Palko Sari Eka as an oil refinery company, uses Crude Coconut Oil as a dominant raw material to its production process activities. An optimal Inventory system is very important to be implemented by the company so that the company can provide product as customer needs and give inventory cost as more efficient.
STRATEGI PENGEMBANGAN SUMBER DAYA MANUSIA INDUSTRI SOFTWARE DI INDONESIA Hayun, Anggara
Industrial and Systems Engineering Assessment Journal (INASEA) Vol 8, No 2 (2007): INASEA Vol. 08 No.2
Publisher : Industrial and Systems Engineering Assessment Journal (INASEA)

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

The development of information and telecommunication (IT) industries is very fast in the world, and haves been effected by Indonesian software industry development. The Indonesian software industrial market shares a more growth every year. The growth market demands a readiness of human resource development (HRD). Then, a human resources strategic planning must be needed. Therefore, the human resources strategic planning are hoped to improve human resources development skill, thus software industries have a competitive, advantage not only in local but also in global. Area the result indicates that the strategy conducted to develop human resource in industrial industries are facilities supply and incentive by government in facilities, policy and regulation.
APLIKASI SIMULASI UNTUK PERAMALAN PERMINTAAN DAN PENGELOLAAN PERSEDIAAN YANG BERSIFAT PROBABILISTIK Sugiharto, Bambang
Industrial and Systems Engineering Assessment Journal (INASEA) Vol 8, No 2 (2007): INASEA Vol. 08 No.2
Publisher : Industrial and Systems Engineering Assessment Journal (INASEA)

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

One of the important aspect on plan and production control is the management of inventory. However, a good inventory management is easily implemented, particularly when it involves some probabilistic parameter. There are two important parameters that usually behave probabilistically, those are demand and lead time. To overcome this situation, a simple methodology can be applied by determining an inventory model that can be used as a basic reference even though probabilistic situation exists. One of effective methods to make such a prediction is by using simulation. Among the simulation technique that can be applied are Monte Carlo simulation and Exponential Simulation.
ANALISIS PERENCANAAN PRODUKSI DISAGREGAT FAMILY DVD PADA PT XYZ Prasetya, Hans; Nurhasanah, Nunung
Industrial and Systems Engineering Assessment Journal (INASEA) Vol 8, No 2 (2007): INASEA Vol. 08 No.2
Publisher : Industrial and Systems Engineering Assessment Journal (INASEA)

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

The most recently problem that used to happened at PT XYZ is about production planning (Master Production Scheduling). Production planning in this company always takes so many times. To solve the problem, this research was trying to develop a disaggregate production planning. The steps were, demand forecasting, production capacity planning, and disaggregate planning. Double moving average, double exponential smoothing, and decomposition method were used to forecast demand. Least cost and stepping stone were the two methods from transportation model that were used to solve the production capacity planning. Hax and Meal method were used to solve a disaggregate planning.
MINIMASI DOWNTIME TOOL PUNCH MESIN HEADING PADA PREVENTIVE MAINTENANCE DENGAN METODE AGE REPLACEMENT Santoso, Edi; Chairul, Edwin Julianto
Industrial and Systems Engineering Assessment Journal (INASEA) Vol 8, No 2 (2007): INASEA Vol. 08 No.2
Publisher : Industrial and Systems Engineering Assessment Journal (INASEA)

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Production machines can be a barrier for the on time product availability. If there is no time consideration of the usage of production machines or less in maintenance, the machines will not be used in product processing. In the case of tool punch Heading machine in which the machine need to maintain in the right period of time using Age Replacement method. This method can help management to determine the period in inspection and preventive maintenance. Based on time period, preventive maintenance that was done can be decrease downtime, increase machines availability and reliability.

Page 1 of 1 | Total Record : 7