Eco Rekayasa: Jurnal Teknik Sipil fokus di bidang Teknik Sipil dan Lingkungan, antara lain: Struktur, Hidro, Transportasi, Geoteknik, Manajemen Konstruksi, dan Lingkungan.
Arjuna Subject : -
Articles 40 Documents
PENAMBAHAN SATU LANTAI TINGKAT PADA PORTAL GEDUNG BETON BERTULANG TIGA LANTAI Asroni, Ali
Eco Rekayasa Vol. 11. No.1, Maret 2015
Publisher : Universitas Muhammadiyah Surakarta

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

The aim of this research was to compare three and four floors of reinforce concrete portal design, and the  possibility of the addition of one floor above the three floors building based on building safety. Research was carried out by taking the example of two office building portals constructed in the earthquake zone-one. Both portals were made from the same sketch plan and designed in the full elastic system. The load combinations (dead load, live load, and earthquake load) were subjected to both portals. The loads complied with the Indonesian Code (Tatacara Perhitungan Struktur Beton Untuk Bangunan Gedung, SNI 03-2847-2002). The dimension of portal structures (beam, column, sloof, and foundations) and their reinforcements were properly designed to carry the loads. Based on the dimension of portal and their reinforcement obtained, a comparison could be made up of total reinforcing and spacing of begel on both portals, and the possibility of the addition of one floor above the three floors building. The results showed that the dimensions of the structure (column, sloof, and foundation) of four floors portal were bigger than three floors, had greater number of total longitudinal reinforcement (include of beam), and the begel space of edge beam was more tightly. Moreover, the addition of one floor above the three floors would be dangerous for building safety  and users.
KAJIAN KETERSEDIAAN LAHAN DITINJAU DARI RENCANA STRATEGIS PEN KAMPUS BERKELANJUTAN (STUDI KASUS DI BEBERAPA LOKASI KAMPUS FKIP UNS) Sukatiman, Sukatiman
Eco Rekayasa Vol. 11. No.1, Maret 2015
Publisher : Universitas Muhammadiyah Surakarta

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

The research purposed was  mapping campuses situations toward to sustainable strategic plan.  Kind of research is qualitative descriptive focused on specific targets. Its comprises of exsisting condition in 3 location campuses,  those were PTK Pabelan campus,  PGSD campus, and FKIP UNS Kentingan campus. The research showed that : 1) environment condition of three (3)location  campuses  had  sustainable infrastructure,  available  of  reforestasion,  and    cozy environment.  2)  PTK  Pabelan  and PGSD Laweyan  campuses had  available  open  space  suitable with regulation  of Public Works. 3) FKIP Kentingan  campus was over land used.
PENAMBAHAN ABU JERAMI DAN ABU SEKAM PADI PADA CAMPURAN BATU BATA UNTUK MENINGKATKAN KUALITAS DAN EFISIENSI PRODUKSI BATU BATA INDUSTRI TRADISIONAL Rahmawati, Anis; Saputro, Ida Nugroho
Eco Rekayasa Vol. 11. No.1, Maret 2015
Publisher : Universitas Muhammadiyah Surakarta

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

The purpose of this study was to determine the effect of rice husk ash and ash rice straw against physical and mechanical characteristics of the bricks, and also to determine the minimal burning time in the manufacture of clay bricks with additional ingredients such waste to achieve physical and mechanical characteristics bricks in accordance with standard bricks. Variations of burning time is 12 hours, 18 hours, 24 hours, and 30 hours. While the variation of rice husk ash and rice straw ash is 0%, 5%, 10%, 15% and 20%. The bricks were tested based on physical and mechanical characteristics. Physical characteristics include specific gravity test, fuel and shrinkage porosity test. While the mechanical characteristics are compressive strength test.Based on these results, it was found that all the bricks compressive strength test in accordance with ISO standards SK-S-04-1989-F, which is entering grade 25 and 50. The density is smaller than the standard that is 1.8 to 2.6 g / cm3. Test shrinkage derived fuel is smaller than the standard that is <15%. While the porosity test found to be greater than the standard (<20%). The highest compression strength is 7.35 MPa is achieved with brick with an additional 20% ash burning rice straw in 12 hours. Its low specific gravity of 1.32 g / cm3, achieved by brick with the addition of 20% rice husk ash on burning 30 hours. Losses lowest fuel that is 0.90% achieved by brick with the addition of 20% rice husk ash on burning 12 hours. While the lowest was 33.17% porosity is achieved by brick with the addition of 10% rice husk ash on burning 24 hours.
PENAMBAHAN SATU LANTAI TINGKAT PADA PORTAL GEDUNG BETON BERTULANG TIGA LANTAI Asroni, Ali
Eco Rekayasa Vol. 11. No.1, Maret 2015
Publisher : Universitas Muhammadiyah Surakarta

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

The aim of this research was to compare three and four floors of reinforce concrete portal design, and the  possibility of the addition of one floor above the three floors building based on building safety. Research was carried out by taking the example of two office building portals constructed in the earthquake zone-one. Both portals were made from the same sketch plan and designed in the full elastic system. The load combinations (dead load, live load, and earthquake load) were subjected to both portals. The loads complied with the Indonesian Code (Tatacara Perhitungan Struktur Beton Untuk Bangunan Gedung, SNI 03-2847-2002). The dimension of portal structures (beam, column, sloof, and foundations) and their reinforcements were properly designed to carry the loads. Based on the dimension of portal and their reinforcement obtained, a comparison could be made up of total reinforcing and spacing of begel on both portals, and the possibility of the addition of one floor above the three floors building. The results showed that the dimensions of the structure (column, sloof, and foundation) of four floors portal were bigger than three floors, had greater number of total longitudinal reinforcement (include of beam), and the begel space of edge beam was more tightly. Moreover, the addition of one floor above the three floors would be dangerous for building safety  and users.
PENGARUH KOLOM PASIR TERHADAP KONSOLIDASI TANAH LEMPUNG LUNAK Listyawan, Anto Budi; Wiqoyah, Qunik; Ningsih, Rena; Widhi Satriyana, Marten Widhi Satriyana Ramadlan
Eco Rekayasa Vol. 11. No.1, Maret 2015
Publisher : Universitas Muhammadiyah Surakarta

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

The  road weaving near Sragen city Central Java has been daily problem  in  last decade. The  existing of high expansive  clay soil in subgrade below the road foundation has been identified as the major cause of this problem. Sand Column become one solution to improve the subgrade since it can ab-sorb the water  from the void of clay soil and drain into the channel. The re-search develops a model of Sand column in laboratorium. The box of 1.0 m x 0.4 m x 0.4 m has been created. 15 cm diameter of sand column then installed at the toe and samples for consolidation test are taken from various distances from the centre of column (i.e. 16.67 cm; 33.33 cm; and 50 cm). The result shows that the Sand Column can improve the soft clay soil in terms of consolidation. The coefficient of consolidation increases as the compression index drops. Consequently, the consolidation settlement can be re-duced significantly.
KAJIAN KETERSEDIAAN LAHAN DITINJAU DARI RENCANA STRATEGIS PENGEMBANGAN KAMPUS BERKELANJUTAN (Studi Kasus di Beberapa Lokasi Kampus FKIP UNS) Sukatiman, Sukatiman
Eco Rekayasa Vol. 11. No.1, Maret 2015
Publisher : Universitas Muhammadiyah Surakarta

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

The research purposed was  mapping campuses situations toward to sustainable strategic plan.  Kind of research is qualitative descriptive focused on specific targets. Its comprises of exsisting condition in 3 location campuses,  those were PTK Pabelan campus,  PGSD campus, and FKIP UNS Kentingan campus. The research showed that : 1) environment condition of three (3) location campuses had sustainable infrastructure, available of reforestasion, and  cozy environment. 2) PTK Pabelan and PGSD Laweyan campuses had available open space suitable with regulation of Public Works. 3) FKIP Kentingan campus was over land used.
KINERJA KA SANCAKA KELAS EKSEKUTIF DAN KELAS BISNIS DITINJAU DARI KEPUASAN PENGGUNANYA Setiyaningsih, Ika
Eco Rekayasa Vol. 11. No.2, September 2015
Publisher : Universitas Muhammadiyah Surakarta

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

KA Sancaka that serve Yogyakarta-Surabaya route has a very important role for the movement of people and goods between the two cities. Competition among modes of land transport and air modes also requires the ope-rator to be able to provide good performance for users KA Sancaka. For that is necessary to study how users KA Sancaka assess the performance of both the executive class or business-class. Data retrieval is based on the results of questionnaire respondents Sancaka KA users. The total number of samples of 558 respondents bottom-right on the population data of passenger volume in the first week (dated August 2 to 8, 2010) as many as 1287 passengers in business class and 687 executive class passengers. Analysis of data using IPA (Importance Performance Analysis).Results indicate that the performance variable performance Sancaka KA executive class and business class today is pretty good. Variables placed quadrant 1 need attention from PT. KAI From each of the 24 variables, 7 variables in executive class and 13 in business class variable has been in line with expectations applications of nanya. Variables in quadrant 3 can be maintained in accordance with what has been done in the current conditions. Variables in quadrant 4 although considered important by the user can still be tailored to the users wishes.
ANALISA KELAYAKAN TARIF AIR BERDASARKAN PENGEMBALIAN BIAYA PENUH DAN SENSITIVITAS NPV Sandhyavitri, Ari; Herlina, Dewi
Eco Rekayasa Vol. 11. No.1, Maret 2015
Publisher : Universitas Muhammadiyah Surakarta

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

The objectives of this research study were to : (i) investigate how much water tariffs should be paid by consumer in order to serve the project investement and operation based on the full cost recovery schemes, and (ii) investigate sensitivity factors affeted to project NPV.  This study fokus on the Dumai,water development project, Riau Province. The project investment was approximatelly Rp. 82,34 billion  (Alternative 1 for water treatment facility of 80 l/sec) and Rp. 134,308 million (Alter-native 2 for watar treatment facility of 160 l/sec) for 25 years. Based on the  economic analysis, it was revealed that; the Net Present Value (NPV) of  the alternative 1 project was Rp. 4.4 billion (with water tariffs of Rp. 7.000,-/m3 for a household and Rp 9.000,-/m3 for an industrial sector), BCR =  1,135, and IRR = 16,829 %.  This IRR value is higher then bank interst rate (12%). Alternative 2 will yield NPV of 40 billion (with tariff of Rp. 5.700,-/m3 for Household and Rp . 8.000, -/m3 for an industrial sector), BCR= 1,122 and IRR = 16,433 % . Based on these economic analysis, this project was considered feasible to proceed. The factors that are relatively sensitive for the NPV of project were; chemicals, electricity and fuel, staff salaries, and interest rates.
ANALISIS PERBANDINGAN RENCANA ANGGARAN BIAYA STRUKTUR PELAT LANTAI KONVENSIONAL DENGAN SISTEM FLOOR DECK Sahid, Muh Nur; Priyanto, Budi; Winardi, Winardi
Eco Rekayasa Vol. 11. No.1, Maret 2015
Publisher : Universitas Muhammadiyah Surakarta

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

This study is intended for comparison of the structure of a conventional floor slab and floor deck system. The aim of research looking for an easy job execution, performance and productivity of labor and equip-ment are high, the effectiveness of a faster time and low cost of the two methods. Object of research on Building Project National Craft Council and Scout (DESPRA) Central Java, Semarang. This comparative study covers the analysis of the implementation of the work, the analysis of the performance and produc-tivity of labor and equipment, timing analysis, the cost of implementation with field observation method. Implementation of research results slab floor deck system more effective and efficient both from the level of difficulty and time required compared to conventional floor plate. Labor productivity and higher tool structure floor deck slab system compared to conventional floor plate structure. While the performance of slab floor deck system is better than the conventional floor plate. The timing of the slab floor deck system faster than conventional floor plate difference of 6.92 days. Costs on the work floor deck slab system less than a conventional floor plates by a margin of 8.105%
ANALISIS PONDASI BORED PILE DENGAN PRINSIP PROBABILITAS (STUDY KASUS PROYEK HOTEL QUEST SOLO) Susanto, Agus; Listyawan, Anto Budi; Puspitasari, Dewi
Eco Rekayasa Vol. 11. No.1, Maret 2015
Publisher : Universitas Muhammadiyah Surakarta

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Probabilistic design began more realistic solution compare to the deterministic (conventional) design as it can describe and accommodate of soil variability.  Althought the old approach is widely used, it is confirmed, that almost all natural soils are spatially variable in their properties and rarely homogenous.  This paper focuses on the analysis and design of bored pile foundation on the project of  Solo Quest Hotel based on the probabilistic theory.  The research begins with a certain pre-liminary analysis to prepare the probabilistic analysis of bored pile foundatiaon design, by characterizing the cohesion (cu) from convertion of N value on three SPTs data taken from the site.  It involves an extensive analysis to perform the best-fit distribution of pointwise variability of cohesion (cu) using computer program written in MATLAB.  The next step is deriving the point statistics (i.e. mean, standard deviation, and coefficient of variation) across the site.  Finally, a certain monte carlo analysis using Crystal Ball computer program is carried out to design the bored pile foundation by inputing all data taken from MATLAB analysis.  The bored pile installed in 12 m depth and the diameters of bored pile 0,6 m respectively.  The  bored pile experiences 43.354,455 kN vertical load.  The results show that there is no objection to hypothesis of normality in the Chi-Square analysis.  Compare to the deterministic analysis, the probabilistic design needs more bored pile to resist the vertical load in a safety factor 2,5 and confident limit 95%.  Furtheremore, the higher variation of  cu data the larger number of bored pile is desired.