Sri Sangkawati Sachro, Sri
Unknown Affiliation

Published : 2 Documents Claim Missing Document
Claim Missing Document
Check
Articles

Found 2 Documents
Search

Kajian Optimalisasi Sistem Irigasi Rawa (Studi Kasus Daerah Rawa Semangga Kabupaten Merauke Propinsi Papua) Pakpahan, Darwin; Suripin, Suripin; Sangkawati Sachro, Sri
MEDIA KOMUNIKASI TEKNIK SIPIL Volume 20, Nomor 2, DESEMBER 2014
Publisher : Department of Civil Engineering, Diponegoro University

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (745.652 KB) | DOI: 10.14710/mkts.v20i2.9257

Abstract

Population growth is increasing, but it is not accompanied by an increase in food needs impartial. Indonesian swamp land potential of about 33.4 million ha, consisting of tidal swamp 20.1 million ha and 13.3 million ha of lowland swamp. The Government has made the development of swamps into agricultural land, including the Semangga swamp area (4,000 ha) The cropping pattern of rice (100%) - crops (40%) – “bero”. The problem faced are; the length is 7-month of dry season and low agricultural production, are therefore likely to swamp irrigation system optimalization. The method used to carry out water balance analysis and performance assessment of irrigation system include; the physical condition of irrigation, the application of the system of planting and water delivery techniques to the use of land for a year, then performed according to the potential land development plan and water resources available. Results of water balance analysis on Semangga Swamp Area existing condition indicate that water deficit occurred during the second growing season crops (May-July) and in December. So do the appropriate development plan defined cropping pattern III, namely rice (100%) - crops (60%) - crops (45%) with the addition of a total area of 1,000 ha through the use Kumbe River and Maro River and other water reservoirs to overcome deficits in the availability of water in the dry season that is equal to 2.5m³/s (April to August and October to December), while 6.5m³/s in September, 72.40% irrigation system performance with good category.
Panen Air Hujan di Kampus Universitas Diponegoro Nurrohman, Faisal; Waskita Eka Paksi, Satria; Sangkawati Sachro, Sri; Sugiyanto, Sugiyanto
MEDIA KOMUNIKASI TEKNIK SIPIL Volume 20, Nomor 2, DESEMBER 2014
Publisher : Department of Civil Engineering, Diponegoro University

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (908.565 KB) | DOI: 10.14710/mkts.v20i2.9260

Abstract

The design of rainwater harvesting is planned for alternative water source in Universitas Diponegoro area and hopefully it can reduce the use of groundwater as the main source water to fill the demand of water in Universitas Diponegoro Tembalang area. The use of groundwater to fill the water demand in Universitas Diponegoro Campus for years 2014/2015 of 2.23 lt/dt it more than the optimum discharge are allowable to take the water wells is equal to 0.2-1 lt/dt. Based on that the planning of the rainwater harvesting building is made of with a volume of 245 m3 with a dimensions of 7m x 7m x 5m and dimensions of infiltration wells with a diameter of 1.5 and depth of 3m. Planning of the rain water harvesting in the Universitas Diponegoro Tembalang area the cost of Rp 275,465,000,- with the process of work for 29 days.