Claim Missing Document
Check
Articles

Found 6 Documents
Search

ANALISIS PENGEMBANGAN INVESTASI PERALATAN RADIOLOGI DI RUMAH SAKIT UMUM RAJAWALI CITRA BANTUL YOGYAKARTA Wahyudi, Nur; Rosyidah, .
Jurnal Kesehatan Masyarakat (Journal of Public Health) Vol 6, No 2 (2012): Jurnal Kes Mas FKM UAD Juni 2012
Publisher : Universitas Ahmad Dahlan

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (28.302 KB)

Abstract

Background: Investment is basically an effort of investing resources (capital) in business. The radiology unit in Rajawali Citra Hospital is cooperatively performed by the third party or an investment from the third party. The investment of the radiology tools has been performed for more than 5 years, yet a reliability study from the investment has been conducted. This study aimed at assessing the reliability of developing the investment of radiology tools in Rajawali Citra Hospital over 5 years Method: This study is a study with descriptive analysis method in quantitative and qualitative approach without using hypothesis. The subject of the study is parts of finance, radiology unit and medical support and financial balance of radiology in 2007 – 2011. The technique of data collection was interview and documentation of financial balance of the radiology unit. The data analysis was done descriptively by applying quantitative and qualitative analysis approach. Result: The result of the study from the financial aspect indicated that payback period (3 years) 327 was quicker than the economical value of the tools (5 years), NPV = Rp 5,252,878.3 investment was accepted because it resulted positive value, ARR = 150% investment was accepted because it provided more advantage than which has specified 100%, IRR = 15,2% investment was accepted because the result was more than the interest (10%), PI = 1,10 the investment was accepted because the result was more than 1. Conclusion: From the whole aspect in the reliability assessment of the investment such as market aspect, technology, law, management and financial resulted in positive value to the investment development of the radiology tools. Keywords: Investment, Reliability, Finance, Radiology.
PERANCANGAN PUSAT PROMOSI, INFORMASI DAN PERDAGANGAN PRODUK AUDIO VISUAL DI SEMARANG Wahyudi, Nur
Canopy: Journal of Architecture Vol 2 No 1 (2013): CANOPY
Publisher : Canopy: Journal of Architecture

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

PENERAPAN MODEL PEMBELAJARAN BERBASIS MASALAH TERHADAP HASIL BELAJAR ROLL DEPAN KAKI TEKUK DALAM PEMBELAJARAN PENDIDIKAN JASMANI, OLAHRAGA, DAN KESEHATAN (STUDI PADA SISWA KELAS IV SIDOMLANGEAN, KEDUNGPRING, LAMONGAN) WAHYUDI, NUR
Jurnal Pendidikan Olahraga dan Kesehatan Vol 3, No 2 (2015): Volume 3 Nomor 2 Tahun 2015
Publisher : Jurnal Pendidikan Olahraga dan Kesehatan

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Abstrak Pendidikan merupakan ujung tombak bangsa Indonesia untuk mencerdaskan anak bangsa. Dalam Implementasinya, pendidikan di Indonesia telah mengalami berbagai perubahan. Perubahan yang terjadi adalah pergantian kurikulum. Kebijakan pengembangan kurikulum bertujuan menghasilkan insan Indonesia yang produktif, kreatif, inovatif, dan efektif melalui penguatan sikap, keterampilan, dan pengetahuan yang teritegrasi. Pada Kurikulum 2013 yang diterapkan di SDN Sidomlangean, mengalami kesulitan dalam penerapan model pembelajaran, dengan mengambil salah satu materi yaitu roll depan kaki tekuk diharapkan bisa meningkatkan hasil belajar. Tujuan penelitian ini adalah untuk mengetahui seberapa besar pengaruh penerapan model pembelajaran berbasis masalah terhadap hasil belajar roll depan kaki tekuk pada pembelajaran pendidikan jasmani, olahraga, dan kesehatan pada siswa kelas IV di SDN Sidomlangean, Kedungpring, Lamongan. Penelitian ini bersifat eksperimen semu dengan desain penelitian one group pretest – posttest design. Populasi dari peneltian ini adalah seluruh siswa kelas IV SDN Sidomlangean, Kedungpring, Lamongan yang sebanyak 21 siswa. Untuk mendapatkan hasil belajar digunakan bentuk test kognitif, afektif, dan psikomotor yaitu test roll depan kaki tekuk (expert jugment). Berdasarkan perhitungan data diperoleh hasil sebagai berikut. Karena t hitung lebih besar dari t tabel (11,14 > 1,725) dengan taraf signifikasi 0,05 pada df 20, maka Ha diterima dan Ho ditolak dengan besar peningkatan 65,53%.Jadi, dapat disimpulkan bahwa ada pengaruh yang signifikan penerapan model pembelajaran berbasis masalah terhadap hasil belajar roll depan kaki tekuk pada pembelajaran pendidikan jasmani, olahraga, dan kesehatan pada siswa kelas IV di SDN Sidomlangean, Kedungpring, Lamongan setelah diberikan model pembelajaran berbasis masalah. Kata Kunci : Kurikulum 2013, Roll depan kaki tekuk, Kelas IV Sekolah Dasar. Abstract Education is the spearhead for Indonesia to educate its children. In the implementation, education in Indonesia has experienced various changes. The occuring changes is that of the curriculum. Curriculum development policy aims to produce a productive, creative, innovative, and effective human resource through the integrated strengthening of attitudes, skills, and knowledge. In Curriculum 2013 applied an SDN Sidomlangean, there are difficulties in the application of learning models, and by taking one of the materials which roll front legs buckling is expected to improve learning outcomes. The purpose of this study is to determine how much influence the application of problem-based learning model has to the learning outcomes of buckling front roll front legs buckling in learning physical education, sports, and health in the fourth grade students at SDN Sidomlangean, Kedungpring, Lamongan. This study is a quasi-experimental research design with one group pretest - posttest design. The population of this research is the entire fourth grade students of SDN Sidomlangean, Kedungpring, Lamongan consiting of 21 students. To get the data  the researcher used a form of cognitive, affective, and psychomotor test for buckling  front roll test (expert judgment). Based on the calculation of the data the following results, can be obtaianed Because t is greater than t table (11.14> 1,725) with the significance level of 5% on 20 df, then Ha is accepted and Ho rejected by number of increase of 65.53%. So, it can be concluded that there is a significant influence in application of problem-based learning model to the learning outcomes of roll front legs buckling in physical education, sports, and health in the fourth grade students at SDN Sidomlangean, Kedungpring, Lamongan after problem-based learning model is applied.  Keywords: Curriculum 2013, Roll front legs buckling, Class IV Elementary School.
KEMAMPUAN PDAM UNTUK MEMENUHI KEBUTUHAN AIR BERSIH KOTA SURABAYA SAMPAI TAHUN 2030 WAHYUDI, NUR
Swara Bhumi Vol 5, No 01 (2017): Volume 05 Nomor 01 Yudisium 90
Publisher : Jurusan Pendidikan Geografi FIS Unesa

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Abstrak Air bersih tidak dapat dipisahkan dari mahluk hidup dalam melakukan aktifitas sehari hari. Dalam pertumbuhan penduduk sekarang ini kebutuhan akan air bersih sangat meningkat, tidak terkecuali kebutuhan air bersih untuk masyarakat Kota Surabaya. Untuk memenuhi kebutuhan air bersih masyarakat Kota Surabaya diperlukan sumber air yang bersih yang layak untuk diminum. Parameter hidrologi yang penting dalam suatu pekerjaan yang terkait dengan sumber daya air adalah debit air dan jumlah penduduk untuk distribusi air. Studi pendahuluan dilakukan terlebih dahulu dengan melakukan studi pustaka yang berasal dari buku, jurnal dan catatan kuliah dijadikan dasar dalam penelitian, dan data primer didapat dari hasil survey lapangan. Kemudian data sekunder berupa data jumlah penduduk, data fasilitas kota (fasilitas pendidikan, peribadatan, perkantoran, kesehatan), data pelanggan dan data kapasitas produksi air bersih PDAM Kota Surabaya. dalam mencari besarnya kebutuhan air, dilakukan analisa jumlah penduduk dan analisa produksi air bersih.  Menentukan kebutuhan air bersih dan jumlah penduduk di Kota Surabaya digunakan metode Geometri yang mana metode ini menunjukan pertumbuhan penduduk terbesar sehingga dapat direncanakan kebutuhan air bersih sampai tahun 2030. Berdasarkan hasil proyeksi jumlah penduduk ditambah dengan jumlah Pelanggan PDAM Kota Surabaya pada tahun 2030 sebanyak 4.174.516 jiwa debit air yang dibutuhkan sebesar 2.610.879 liter/detik, sedangkan kapasitas produksi saat ini sebesar 9485 liter/detik.      THIS ABILITY PDAM TO MEET A CLEAN WATER IN SURABAYA UNTIL 2030   Abstract Clean water can not be separated from living creatures in performing daily activities. In the current population growth the need for clean water is greatly increased, not to mention the need for clean water for the people of Surabaya. To meet the needs of clean water community of Surabaya City needed a clean source of water that is feasible to drink. Important hydrological parameters in a work related to water resources are water flow and population for water distribution. The preliminary study was conducted in advance by conducting literature studies derived from books, journals and lecture notes used as the basis of research, and primary data obtained from field survey results. Secondary data are population data, data of city facility (education facility, worship, office, health), customer data and PDAM Surabaya water supply capacity data. In searching for the amount of water needs, analyzed the population and analysis of clean water production.  Determining the need for clean water and the population in Surabaya is used Geometry method which is the method shows the largest population growth so that it can be planned the need of clean water until 2030. Based on the result of population projection added by the number of PDAM Surabaya City Customers in 2030 4,174,516 of the required water debit is 2,610,879 liters / second, while the current production capacity is 9485 liter / second Keywords: Population, clean water, needs  
KEMAMPUAN PDAM UNTUK MEMENUHI KEBUTUHAN AIR BERSIH KOTA SURABAYA SAMPAI TAHUN 2030 WAHYUDI, NUR
Swara Bhumi Vol 5, No 01 (2017): Volume 05 Nomor 01 Yudisium 90
Publisher : Jurusan Pendidikan Geografi FIS Unesa

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Abstrak Air bersih tidak dapat dipisahkan dari mahluk hidup dalam melakukan aktifitas sehari hari. Dalam pertumbuhan penduduk sekarang ini kebutuhan akan air bersih sangat meningkat, tidak terkecuali kebutuhan air bersih untuk masyarakat Kota Surabaya. Untuk memenuhi kebutuhan air bersih masyarakat Kota Surabaya diperlukan sumber air yang bersih yang layak untuk diminum. Parameter hidrologi yang penting dalam suatu pekerjaan yang terkait dengan sumber daya air adalah debit air dan jumlah penduduk untuk distribusi air. Studi pendahuluan dilakukan terlebih dahulu dengan melakukan studi pustaka yang berasal dari buku, jurnal dan catatan kuliah dijadikan dasar dalam penelitian, dan data primer didapat dari hasil survey lapangan. Kemudian data sekunder berupa data jumlah penduduk, data fasilitas kota (fasilitas pendidikan, peribadatan, perkantoran, kesehatan), data pelanggan dan data kapasitas produksi air bersih PDAM Kota Surabaya. dalam mencari besarnya kebutuhan air, dilakukan analisa jumlah penduduk dan analisa produksi air bersih.  Menentukan kebutuhan air bersih dan jumlah penduduk di Kota Surabaya digunakan metode Geometri yang mana metode ini menunjukan pertumbuhan penduduk terbesar sehingga dapat direncanakan kebutuhan air bersih sampai tahun 2030. Berdasarkan hasil proyeksi jumlah penduduk ditambah dengan jumlah Pelanggan PDAM Kota Surabaya pada tahun 2030 sebanyak 4.174.516 jiwa debit air yang dibutuhkan sebesar 2.610.879 liter/detik, sedangkan kapasitas produksi saat ini sebesar 9485 liter/detik.      THIS ABILITY PDAM TO MEET A CLEAN WATER IN SURABAYA UNTIL 2030   Abstract Clean water can not be separated from living creatures in performing daily activities. In the current population growth the need for clean water is greatly increased, not to mention the need for clean water for the people of Surabaya. To meet the needs of clean water community of Surabaya City needed a clean source of water that is feasible to drink. Important hydrological parameters in a work related to water resources are water flow and population for water distribution. The preliminary study was conducted in advance by conducting literature studies derived from books, journals and lecture notes used as the basis of research, and primary data obtained from field survey results. Secondary data are population data, data of city facility (education facility, worship, office, health), customer data and PDAM Surabaya water supply capacity data. In searching for the amount of water needs, analyzed the population and analysis of clean water production.  Determining the need for clean water and the population in Surabaya is used Geometry method which is the method shows the largest population growth so that it can be planned the need of clean water until 2030. Based on the result of population projection added by the number of PDAM Surabaya City Customers in 2030 4,174,516 of the required water debit is 2,610,879 liters / second, while the current production capacity is 9485 liter / second Keywords: Population, clean water, needs
KINERJA ASOSIASI PENGELOLA SISTEM PENYEDIAAN AIR MINUM DAN SANITASI (SPAMS) PERDESAAN “SUMBER BATHORO KATONG” KABUPATEN PONOROGO TAHUN 2019 Wahyudi, Nur; Qomaruddin, Qomaruddin; Pramono, Joko
JI@P Vol 9, No 2 (2020): JI@P
Publisher : Master of Public Administration, Universitas Slamet Riyadi

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Ponorogo District mission carried out by the Departement of Public Works,Housing and Settlement Area one of them is to arrange a comfortable area for all,with the availability of adequate public space, environmentally friendly, as well asefforts to accelerate the reduction of inequality between rural and urban areas.One of which is done is by Rural Sistem Penyediaan Air Minum (SPAM)development activities. After the completion of the Rural SPAM developmentactivities, requires organization to manage the SPAM. SPAM managers isHimpunan Penduduk Pemakai Air Minum (HIPPAM) and Badan PengelolaSistem Penyediaan Air Minum dan Sanitasi (BP-SPAMS). To strengthen theorganizational capacity of The HIPPAM and BP-SPAMS, in 2018 formed AsosiasiPengelola Sistem Penyediaan Air Minum dan Sanitasi (SPAMS) Perdesaan?Sumber Bathoro Katong? Kabupaten Ponorogo for The 2018 ? 2023. ThisAssociation is a government partner and other concerned parties related to thedelivery of community based drinking water and sanitation services in thePonorogo District. The Association aims to support increasing coverage ofdrinking water and sanitation services to 100%, increasing the capacity of villageleveldrinking water and sanitation managers and facilitating partnership activitieswith District Governments and Village Governments, the private sector(Corporate Social Responsibility / CSR) and other actors. Although TheAssociation has been formed for more than a year, and has a large task andfunction; but The Association's performance is not yet optimal. The performanceof The Asosiasi Pengelola Sistem Penyediaan Air Minum dan Sanitasi (SPAMS)Perdesaan ?Sumber Bathoro Katong? Kabupaten Ponorogo in 2019 based onperformance indicators according to Robbins (2006: 260) is as follows.Association performance based on performance indicators in the form of quality,the quality is rather good. Based on performance indicators in the form ofquantity, the quantity is rather poor. Based on the performance indicators in theform of timeliness, the timeliness of The Association in completing the workincluding almost on time (rather good). Based on performance indicators in theform of effectiveness, the effectiveness is sufficient. Based on performanceindicators in the form of independence, the independence is sufficient.