Claim Missing Document
Check
Articles

Found 10 Documents
Search

PENGARUH PENGGUNAAN MATERIAL CETAK TERHADAP WAKTU DAN BIAYA PROYEK PEMBANGUNAN RUMAH SEJAHTERA TAPAK (RST) Imam Wahyudi; Ludfi Djakfar; Arief Rachmansyah
Media Teknik Sipil Vol. 12 No. 2 (2014): Agustus
Publisher : Department of Civil Engineering, Faculty of Engineering, University of Muhammadiyah Malang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.22219/jmts.v12i2.2285

Abstract

PENGARUH PENGGUNAAN MATERIAL CETAK TERHADAP WAKTU DAN BIAYA PROYEK PEMBANGUNANRUMAH SEJAHTERA TAPAK (RST) Product Innovation Effect Of Housing Housing Consumer Confidence To Developer (A Case Study Of Housing In Jember )Imam Wahyudi1, Ludfi Djakfar2, Arief Rachmansyah31,2Jurusan Teknik Sipil Universitas Brawijaya MalangJl. MT. Haryono No 167 Malang, IndonesiaAbstractThe purpose of this study was to determine the effect of the use of printed materials to the time and cost of development projects Tread Welfare House in Malang and determine the ratio of the time and expense . The method used to analyze the cost and time by using earmed value concept . Estimated completion of aspects of the schedule obtained approximate completion time ( TE ) was 70 days with the use of conventional materials , while using printed material is for 64 days . This case shows the project using print materials to accelerate approximately 8 days of the 72 -day plan . The conclusion of this study is the effect of the use of conventional materials based on the use of earned value schedule states that a plan with almost the same execution time by 72 days to 100 houses , while the performance in terms of cost , is effective for less than the cost of implementing the plan , so there are advantages Rp.72,396,667.04 amounted to 100 houses . While using print materials faster implementation 8 days from the time the plan is as much as 64 days to 100 houses , while the performance is analyzed in terms of costs with earned value concept can be assessed effectively with a gain of Rp.125,139,788.80 to 100 housing units .Keywords : Home Prosperous Tread , Conventional Materials , Materials PrintAbstrakAdapun tujuan dalam penelitian ini adalah untuk mengetahui pengaruh penggunaan material cetak terhadap waktu dan biaya proyek pembangunan Rumah Sejahtera Tapak di kota Malang dan mengetahui perbandingan terhadap waktu dan biaya. Metode yang digunakan untuk menganalisis biaya dan waktu yaitu dengan menggunakan earmed value concept. Perkiraan penyelesaian dari aspek jadual didapat perkiraan waktu penyelesaian pekerjaan (TE) adalah 70 hari dengan menggunakan material konvensional, sedangkan menggunakan material cetak adalah sebesar 64 hari. Hal Ini menunjukkan proyek dengan menggunakan material cetak akan mengalami percepatan kurang lebih 8 hari dari waktu rencana 72 hari. Kesimpulan dalam penelitian ini adalah pengaruh penggunaan material konvensional berdasarkan penggunaan earned value schedule menyatakan bahwa waktu rencana dengan waktu pelaksanaan hampir sama yaitu sebesar 72 hari untuk 100 unit rumah, sedangkan kinerja dari segi biaya dinilai efektif karena biaya pelaksanaan lebih kecil dari rencana, sehingga ada keuntungan sebesar Rp.72,396,667.04 untuk 100 unit rumah. Sedangkan dengan menggunakan material cetak pelaksanaan lebih cepat 8 hari dari pada waktu rencana yaitu sebanyak 64 hari untuk 100 unit rumah, sedangkan kinerja dari segi biaya yang dianalisa dengan earned value concept dapat dinilai efektif dengan keuntungan sebesar Rp.125,139,788.80 untuk 100 unit rumah.Kata Kunci : Rumah Sejahtera Tapak, Material Konvensional, Material Cetak
EVALUASI DAN POTENSI PENGOPERASIAN BUS SEKOLAH (STUDI KASUS : BUS HALOKES KOTA MALANG) Tony Prasetyo; Ludfi Djakfar; Sobri Abusini
Media Teknik Sipil Vol. 13 No. 2 (2015): Agustus
Publisher : Department of Civil Engineering, Faculty of Engineering, University of Muhammadiyah Malang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.22219/jmts.v13i2.2565

Abstract

EVALUASI DAN POTENSI PENGOPERASIAN BUS SEKOLAH (STUDI KASUS : BUS HALOKES KOTA MALANG)Evaluation And Potential Operation Of School Bus(Case Study: Bus Halokes Poor Town)Tony Prasetyo1, Ludfi Djakfar2, Sobri Abusini31,2,3 Jurusan Teknik Sipil, Fakultas TeknikUniversitas BrawijayaAlamat korespondensi : Jln. MT. Haryono, Malang, Jatimemail: tony_ayu@yahoo.co.idAbstractMalang is a city with a high population density about 8129 people /km2. Malang city is known as a tourism and educational city. The high population and many activities causes a traffic jam in Malang. To reduce the traffic jam and help students reduce using private motorcycle, Malang goverment provide some free school bus for students. The method used in this research is descriptive quantitative analysis with the description of public transport operational performance analysis and analysis of vehicle operating costs. It also used SWOT method to determine the performance of the school bus, potential, problems and strategies used to develop a school bus. The results showed that operational performance is good with load factor value less than 1 every segment. The travel speed average is 40 km / hour about 40 until 60 minutes. The service time is about two times in every morning and afternoon and the waiting time of passengers between 5 to 10 minutes. The results of BOK calculation is Rp145.579,- a day which is subsidized by the government of Malang city. Based on the user’s perception of school buses, the most important factors considered are comfort, safety and reliability. Based on SWOT calculations, the development strategy contained in a space that is rapid growth strategy that harnesses the strength and the opportunities.Keyword : School buses, operational performance, BOK, SWOT, development strategyAbstrakKota Malang merupakan kota dengan kepadatan penduduk yang tinggi mencapai 8.129 jiwa/km2. Selain sebagai kota wisata, kota Malang juga dikenal sebagai kota pendidikan. Tingginya kepadatan penduduk Kota Malang sejalan dengan beragamnya aktifitas yang ada menyebabkan terjadinya kemacetan di Kota Malang. Untuk mengurangi kemacetan dan membantu pelajar mengurangi penggunaan kendraan pribadi, pemerintah Kota Malang menyediakan bus sekolah gratis bagi para pelajar. Penelitian ini bertujuan untuk Evaluasi kinerja bus sekolah menggunakan metode Analisis Deskriptif serta analisis biaya operasional kendaraan serta metode SWOT untuk mengetahui kinerja dan strategi. Hasil penelitian menunjukkan bahwa kinerja operasional kendaraan cukup baik dengan nilai load factor kurang dari 1 per segmen dengan kecepatan perjalanan rata-rata 40 km/jam dan waktu tempuh 40-60 menit. Waktu pelayanan 2 kali yakni berangkat dan pulang sekolah dengan waktu tunggu penumpang antara 5 sampai 10 menit. Sementara itu hasil perhitungan BOK adalah Rp 145.579,- per hari yang disubsidi pemerintah. Berdasarkan persepsi pengguna bus sekolah kenyamanan, keamanan dan keandalan adalah faktor yang dirasa paling penting. Berdasarkan hasil perhitungan SWOT, strategi pegembangan terdapat pada ruang A yaitu rapid growth strategy yakni strategi pertumbuhan cepat dengan memanfaatkan kekuatan dan peluang yang ada.Kata Kunci : Bus sekolah, kinerja operasional, BOK, SWOT, strategi pengembangan
EVALUATION OF ROAD ROUGHNESS AND ROAD DETERIOATION Ludfi Djakfar; Gigih Adi Prabowo; Achmad Wicaksono; Vita Dwi Rahmawati
Jurnal Transportasi Vol. 13 No. 3 (2013)
Publisher : Forum Studi Transportasi antar Perguruan Tinggi (FSTPT)

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (406.4 KB) | DOI: 10.26593/jtrans.v13i3.1342.%p

Abstract

There are two road condition survey methods commonly used, the roughness-based equipment such as NAASRA and the distress and severity type road evaluation method as presented by ASTM D-6433. The objective of the study is to evaluate the relationship between road condition obtained from roughness type equipment and road distress. To achieve the objective, a condition survey using the two methods were performed on two road segments in the East Java Provincial road system. Data obtained from the field was evaluated to obtain International Roughness Index (from NAASRA) and Present Condition Index value (from field condition survey). The results show that the two methods provide a comparable result when the distress type is of un-even surface such as rutting and bumping. A slight different result is observed when the major distress occurred in the road is of crack-type such as fatigue and block cracking.
KINERJA WAKTU TEMPUH KERETA API SEGMEN BOJONEGORO-KANDANGAN Ari Wibowo; Achmad Wicaksono; Ludfi Djakfar
Jurnal Transportasi Vol. 15 No. 3 (2015)
Publisher : Forum Studi Transportasi antar Perguruan Tinggi (FSTPT)

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (348.537 KB) | DOI: 10.26593/jtrans.v15i3.1755.%p

Abstract

Abstract The train is a mode of transportation that has the ability to transport passengers and goods in bulk, saving energy, saving the use of space, has a high safety factor, low pollution levels, as well as more efficient to transport over long distances. However, railway performance has a major problem, as reflected in the delay, with the main indicators of speed and travel time. The purpose of this study is to optimize travel time and determine the factors that cause train delays. In this study, train speed was simulated using the software developed based on Newton’s equation of the dynamic equations and applied in the area of Regional Operations 8 Surabaya, for Bojonegoro-Kandangan corridor. The results indicate that the train travel time can be accelerated and the accretion of coach 1 to 5 coaches for all train classes does not add the travel time significantly. Keywords: speed, travel time, train performance, train delays  Abstrak Kereta api merupakan moda transportasi yang memiliki kemampuan mengangkut penumpang dan barang secara massal, hemat energi, hemat penggunaan ruang, memiliki faktor keamanan yang tinggi, memiliki tingkat pencemaran yang rendah, serta efisien untuk angkutan jarak jauh. Namun kinerja kereta api mempunyai masalah utama, yang tercermin dari keterlambatannya, dengan indikator utama kecepatan dan waktu tempuh. Tujuan studi ini adalah untuk melakukan optimasi waktu tempuh dan mengetahui faktor-faktor yang menjadi penyebab keterlambatan kereta api. Pada studi ini dilakukan simulasi  kecepatan kereta api menggunakan perangkat lunak yang dikembangkan berdasarkan persamaan pergerakan dinamik Newton dan diaplikasikan di wilayah Daerah Operasi 8 Surabaya, untuk koridor Bojonegoro-Kandangan. Hasil penelitian ini menunjukkan bahwa waktu tempuh kereta dapat dipercepat dan penambahan jumlah rangkaian kereta api dari 1 sampai dengan 5 kereta untuk semua kelas tidak menambah waktu tempuh secara signifikan. Kata-kata kunci: kecepatan, waktu tempuh, kinerja kereta api, keterlambatan kereta api
PENGARUH PENAMBAHAN ADITIF TERHADAP KINERJA CAMPURAN BERASPAL PORUS Ludfi Djakfar; Yulvi Zaika; Hendi Bowoputro
Jurnal Transportasi Vol. 16 No. 1 (2016)
Publisher : Forum Studi Transportasi antar Perguruan Tinggi (FSTPT)

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (254.453 KB) | DOI: 10.26593/jtrans.v16i1.2150.%p

Abstract

Abstract One of the challenges in implementing the porous asphalt mix is its low stability, which in some cases as low as 500 kg, making it hard to be implemented even in the collector road system. The objective of the research is to evaluate addition of Gilsonite and Latex additives to the porous mix, in search of better or higher stability. Evaluation in this study follows the Marshall procedure. The result shows that adding Gilsonite increases mix stability up to 900 kg and it also performs better compared with the latex-added mix. However, it reduces the permeability capability of the mix, for some points. In the future, further research could be conducted to evaluate gradation modification for increasing its permeability.  Keywords: porous asphalt mixture, Marshall method, permeability, additive  Abstrak Salah satu kendala utama campuran beraspal porus adalah rendahnya stabilitas campuran tersebut, yang pada beberapa penelitian sebelumnya hanya dapat mencapai maksimum 500 kg, sehingga kurang memungkinkan untuk diterapkan pada jalan dengan fungsi kolektor sekalipun. Tujuan penelitian ini adalah melakukan evaluasi terhadap penambahan aditif yang diduga dapat meningkatkan kinerja Marshall campuran beraspal porus. Dua jenis aditif, yaitu Gilsonite HMA Modifier Grade dan Lateks dipilih sebagai aditif campuran beraspal porus. Evaluasi pada studi ini dilakukan berdasarkan prosedur pengujian Marshall. Hasil evaluasi menunjukkan bahwa penambahan aditif Gilsonite meningkatkan kinerja Marshall secara signifikan, khususnya pada stabilitas. Aditif Gilsonite memberikan kinerja yang lebih baik dibandingkan dengan lateks, walaupun penambahan aditif Gilsonite menurunkan kemampuan permeabilitas campuran. Di masa depan perlu dilakukan penelitian lebih lanjut terkait dengan modifikasi gradasi untuk meningkatkan permeabilitas campuran. Kata-kata kunci: campuran beraspal porus, metode Marshall, permeabilitas, aditif
KEBIJAKAN PENATAAN JARINGAN TRAYEK ANGKUTAN UMUM PERKOTAAN JEMBER Sonya Sulistyono; Ludfi Djakfar; Achmad Wicaksono
Jurnal Transportasi Vol. 17 No. 2 (2017)
Publisher : Forum Studi Transportasi antar Perguruan Tinggi (FSTPT)

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (444.858 KB) | DOI: 10.26593/jtrans.v17i2.2723.%p

Abstract

Abstract A thriving city should have a reliable public transport system. A continued decline in the performance of services can not be separated by a detachment of people using public transport, as uncomfortable and unreliable existing services, until unresolved overlapping route yearly by the regulator. Restructuring the route network and preposition institutional arrangement of public transport management are needed to improve public transport services in the community. Restructuring the route network into two, namely: first, the subsidiaryp route network that serves the main line of Jember city use the concept of road based public transport (BRT) with medium buses; second, develop twigs routes of feeder line to serve distrct road network in urban areas. Formulation of public policy was conducted through four stages: formulation of the problem, preparation of policy agenda, selection of policy alternatives to solve the problem, and determination of the policy to minimize the two groups resistance (pro and contra).                                                                                  Keywords: policy formulation, policy agenda, problem solving, policy setting  Abstrak Sebuah kota yang berkembang harusnya memiliki sistem angkutan umum yang dapat diandalkan. Terus menurunnya kinerja pelayanan tidak lepas dari menjauhnya masyarakat menggunakan angkutan umum karena tidak nyaman dan tidak handalnya pelayanan yang ada, hingga overlapping lintasan trayek yang sudah bertahun-tahun tidak terselesaikan oleh regulator. Penataan kembali jaringan trayek dan kelembagaan pengelolaan angkutan umum diperlukan untuk meningkatkan pelayanan angkutan umum di tengah masyarakat. Penataan jaringan trayek dilakukan terbagi dua, yaitu: pertama, jaringan trayek cabang yang melayani jalur utama perkotaan Jember menggunakan konsep angkutan umum berbasis jalan dengan armada bus sedang; kedua, jaringan trayek ranting yang melayani jaringan jalan kabupaten di kawasan perkotaan yang semakin berkembang. Formulasi dalam kebijakan publik dilakukan melalui empat tahapan, yaitu: perumusan masalah, agenda kebijakan, pemilihan alternatif kebijakan untuk memecahkan masalah, dan penetapan kebijakan dilakukan untuk mengurangi resistensi dua model kelompok (pro dan kontra). Kata kunci: perumusan kebijakan, agenda kebijakan, pemecahan masalah, penetapan kebijakan
EVALUASI KINERJA BONGKAR MUAT DI PELABUHAN UMUM GRESIK M. Rum Raekhan; Ludfi Djakfar; Alwafi Pujiraharjo
Jurnal Transportasi Vol. 17 No. 2 (2017)
Publisher : Forum Studi Transportasi antar Perguruan Tinggi (FSTPT)

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (698.717 KB) | DOI: 10.26593/jtrans.v17i2.2726.%p

Abstract

Abstract This study aims to determine the performance of the ship loading and unloading in the Port of Gresik especially on Pier 265, Bulk Dry Pier and Pier 70. The analysis method used in this research is descriptive analysis method, Importance Performance Analysis and Quality Function Deployment. Based on the results of descriptive analysis is known that the problems that cause idle time are: waiting trucks, loading and unloading equipment failures, labor disputes, waiting for a load and due to the weather. Based on the Importance Performance Analysis, there are variables deemed important but the performance is still low are: the speed of loading and unloading process, readiness of truck, stacking yard capacity, the cleanliness of the harbor and lighting problems. Based on the analysis of QFD there are several priority issues handling the loading and unloading of which ensure the readiness of cargo to be loaded, the use of warehouses in an optimal, ensuring readiness of loading and unloading equipment, providing fresh gang in order to operate 24 hours, expansion of the yard, speeding up the transport of goods in yard, the ship that will carry out loading and unloading must determine transportation management services, add lighting and improve the cleanliness of the harbor area. Keywords: loading and unloading, performance, IPA, QFD  Abstrak Penelitian ini bertujuan untuk mengetahui kinerja bongkar-muat di Pelabuhan Umum Gresik khususnya pada Dermaga 265, Dermaga Curah Kering, dan Dermaga 70. Metode analisis yang digunakan dalam penelitian ini adalah metode analisis deskriptif, Importance Performance Analysis (IPA) dan Quality Function Deployment (QFD). Dari hasil analisis, kinerja bongkar-muat diketahui bahwa produktivitas bongkar-muat rata-rata baik sedangkan ET:BT (efektif time:berthing time) masih kurang baik. Selain itu, masalah yang banyak menyebabkan idle time diantaranya: penting namun kinerjanya masih rendah, yaitu kecepatan dalam proses bongkar-muat, kesiapan truck, kapasitas lapangan penumpukan, kebersihan area pelabuhan dan masalah penerangan. Berdasarkan hasil analisis QFD ada beberapa prioritas dan urutan prioritas dalam penanganan permasalahan bongkar-muat diantaranya memastikan kesiapan muatan yang akan dimuat, penggunaan gudang secara optimal, memastikan kesiapan alat bongkar-muat, penyediaan fresh gang untuk tenaga bongkar-muat agar bisa beroperasi 24 jam, perluasan lapangan penumpukan, mempercepat pengangkutan barang yang ada di lapangan penumpukan, kapal yang akan melakukan bongkar-muat harus menentukan jasa pengurusan transportasi dengan jumlah truk yang cukup, menambah lampu penerangan, dan meningkatkan kebersihan area pelabuhan. Kata-kata kunci: bongkar-muat, kinerja, IPA, QFD
POLA PERGERAKAN PENUMPANG FERRY DI WILAYAH KEPULAUAN Andi Kumalawati; Ludfi Djakfar; Harnen Sulistio; Achmad Wicaksono
Jurnal Transportasi Vol. 18 No. 1 (2018)
Publisher : Forum Studi Transportasi antar Perguruan Tinggi (FSTPT)

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (484.563 KB) | DOI: 10.26593/jtrans.v18i1.2968.1-10

Abstract

Abstract East Nusa Tenggara is an archipelago with a low population density and uneven distribution. Therefore, the identification of movement pattern characteristics for ferry passengers is very important to capture the initial step of supporting data used in planning of interisland transportation infrastructure. By using the method of Correspondence Analysis, the analysis shows that: (1) most passengers in Alor Island had a nearer distance from home to the port compared to those on Flores, Sumba, and Timor islands; (2) travel costs from home to the ports were categorized expensive; (3) travel time from home to the port was influenced by the distance between home and the port, the port location, and transport to the port type; (4) most passengers did not transfer from one ship to another during the trip from port of origin to port of destination; (5) the waiting time of ship in the ports is affected by delays due to weather and wave height; (6) the journey time of ship is affected by the length of track, weather conditions, and high waves. Keywords: ferry passenger, travel time, travel cost, waiting time  Abstrak Nusa Tenggara Timur merupakan wilayah kepulauan dengan kepadatan penduduk rendah dan sebaran tidak merata. Karena itu, identifikasi karakteristik pola pergerakan bagi penumpang ferry sangat penting untuk langkah awal menjaring data pendukung yang digunakan dalam perencanaan sarana dan prasarana transportasi penyeberangan. Dengan menggunakan Metode Correspondence Analysis, hasil analisis menunjukkan bahwa: (1) sebagian besar penumpang di Pulau Alor memiliki jarak dari rumah ke pelabuhan yang lebih dekat dibandingkan dengan penumpang di Pulau Flores, Pulau Sumba, dan Pulau Timor; (2) biaya perjalanan dari rumah ke pelabuhan dikategorikan mahal; (3) waktu perjalanan dari rumah ke pelabuhan, dipengaruhi oleh jarak dari rumah ke pelabuhan, lokasi pelabuhan, dan jenis angkutan yang digunakan ke pelabuhan; (4) sebagian besar penumpang mengatakan tidak pernah berpindah kapal selama perjalanan dari pelabuhan asal ke pelabuhan tujuan; (5) waktu tunggu kapal di pelabuhan, dipengaruhi oleh keterlambatan kapal akibat cuaca dan tinggi gelombang; dan (6) waktu tempuh kapal dipengaruhi oleh panjang lintasan, kondisi cuaca, dan gelombang yang tinggi. Kata-kata kunci: penumpang ferry, waktu perjalanan, biaya perjalanan, waktu tunggu
PENGARUH KADAR KAPUR PADAM SEBAGAI BAHAN PENGISI CAMPURAN COLD PAVING HOT MIX ASBUTON Ludfi Djakfar; Yogi Kurnia Wiyanta; Hendi Bowoputro; Havizh Lukman Baisa
Jurnal Transportasi Vol. 18 No. 1 (2018)
Publisher : Forum Studi Transportasi antar Perguruan Tinggi (FSTPT)

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (286.111 KB) | DOI: 10.26593/jtrans.v18i1.2970.21-28

Abstract

Abstract The purpose of this study was to determine the effect of using hydrated lime as a filler of Marshall Parameters on a mixture of Lawelle Granular Asphalt, which was produced from Asphalt Buton, using local aggregates. For this purpose, 45 specimens were prepared with variations in Lawelle Granular Asphalt levels and filler percentages. Variations of Lawelle Granular Asphalt levels are 25%, 30%, 35% whereas the filler variations are 0/100, 25/100, 50/50, 75/25, 100/0, between stone ash and hydrated lime. The analysis results show that the optimum level of Lawelle Granular Asphalt level was 29% and the optimum filler content was 60% stone ash and 40% hydrated lime. This means that the hydrated lime can be used as fillers in the Lawelle Granular Asphalt mixture. Keywords: buton asphalt, filler, hydrated lime, Marshall Parameters  Abstrak Tujuan penelitian ini adalah untuk menentukan pengaruh penggunaan kapur padam sebagai bahan pengisi  terhadap Parameter Marshall pada campuran beraspal Lawelle Granular Asphalt, yang diproduksi dari Aspal Buton, dengan menggunakan agregat lokal. Untuk maksud tersebut, dibuatlah 45 benda uji dengan variasi pada kadar Lawelle Granular Asphalt dan persentase bahan pengisi. Variasi kadar Lawelle Granular Asphalt adalah 25%, 30%, 35% sedangkan variasi bahan pengisi adalah 0/100, 25/100, 50/50, 75/25, 100/0, antara abu batu dan kapur padam. Dari hasil analisis didapat bahwa kadar Lawelle Granular Asphalt optimum sebesar 29% dan komposisi optimum bahan pengisi adalah 60% abu batu dan 40% kapur padam. Hal ini berarti bahwa kapur padam dapat digunakan sebagai bahan pengisi pada campuran Lawelle Granular Asphalt. Kata-kata kunci: aspal buton, bahan pengisi, kapur padam, Parameter Marshall
ROAD RECONSTRUCTION WORK ZONE MANAGEMENT TOWARD A GREEN CONSTRUCTION CONCEPT Dewa Ketut Sudarsana; Achmad Wicaksono; Harnen Sulistio; Ludfi Djakfar
Jurnal HPJI (Himpunan Pengembangan Jalan Indonesia) Vol. 1 No. 1 (2015)
Publisher : Himpunan Pengembangan Jalan Indonesia (HPJI)

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.26593/jh.v1i1.1430.%p

Abstract

Abstract During road reconstruction period, a negative impact was imposed on road users and the surrounding environment. These impacts are the result of the work zone which is used as working space and road reconstruction. This work zone is potential to influence the drivers' stress and to decrease road traffic performance such as travel delays, congestions and road accidents. Guidelines for green (environmentally friendly) infrastructure defined in New Road Construction Concept (NR2C) in European infrastructure vision 2040 concept, can be used to mitigate this negative impact. Twenty projects of Balai V National Roads Improvement in East Java, and Balai VIII in Bali for fiscal year 2013 is used as a case study. Descriptive method used for the discussion of case studies. Management traffic safety in work zones assessed the suitability of the setting up of signs, markings and guardrail. Shift arrangements work during the day (peak hours) or night (off peak hour), is used as an indicator of the negative impact of road users and the environment. The analysis showed that the work zone management in the implementation of national road reconstruction projects toward green (environmentally friendly) construction concept. It is shown from the implementation of safety attributes average 68%, and the implementation of the reconstruction in the off peak hours by 55% of the projects. Keywords: road reconstruction, work zone, negative impact, green construction  Abstrak Pada saat pelaksanaan rekonstruksi jalan, dampak negatif akan  terjadi pada pengguna jalan dan lingkungan sekitarnya. Dampak ini akibat zona pekerjaan yang digunakan untuk pekerjaan rekonstruksi. Zona pekerjaan ini berpotensi membuat pengemudi strees dan menurunnya kinerja lalulintas seperti tundaan perjalanan, kemacetan dan kecelakaan lalulintas. Pedoman untuk infrastruktur hijau (ramah lingkungan) menetapkan konsep konstruksi jalan baru (NR2C) dalam Visi Infrastruktur Eropa 2040. Konsep ini dapat memitigasi dampak negatif ini. Dua puluh proyek pada Balai V Jalan Nasional di Jawa Timur dan Bali VIII di Bali pada tahun fiscal 2013 digunakan untuk kasus studi. Metode deskriptif digunakan untuk  dalam diskusi kasus studi. Manajemen keselamatan lalulintas di lokasi kerja dinilai terhadap keberlanjutan penempatan rambu, marka dan pagar pelindung. Pengaturan  perubahan kerja pada siang hari (jam sibuk) atau malam hari (jam tidak sibuk) digunakan untuk indikator dampak negative pada pengguna jalan dan lingkungan. Dari analisis menunjukan manajemen zona kerja pada implementasi proyek-proyek rekonstruksi jalan nasional menuju konsep konstruksi hijau (ramah lingkungan). Terlihat dalam implementasi atribut keselamatan rata-rata 68% dan implementasi pada jam tidak sibuk hanya 55%. Kata-kata kunci: konstruksi jalan, zona kerja, dampak negatif, konstruksi hijau.