Claim Missing Document
Check
Articles

Found 1 Documents
Search
Journal : eProceedings of Engineering

Analisis Perencanaan Jaringan Lte Femtocell Di Gedung Tamansari Parama Office Park Pt Wika Realty Ahsanul Gibran; Kris Sujatmoko; Uke Kurniawan Usman
eProceedings of Engineering Vol 6, No 2 (2019): Agustus 2019
Publisher : eProceedings of Engineering

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Abstrak Ketersediaan layanan berkualitas di setiap tempat merupakan hal penting bagi pelanggan. Salah satunya di dalam Gedung Tamansari Parama, kebutuhan akses layanan data berkecepatan tinggi dibutuhkan melihat gedung tersebut merupakan gedung perkantoran. Femtocell menjadi solusi yang dapat digunakan untuk coverage area dan memberikan akses layanan kepada pelanggan di dalam Gedung Tamansari Parama. Perancangan jaringan LTE ini di simulasikan menggunakan software RPS untuk simulasi coverage dan SIR. Digunakan juga metode Distributed Antenna System (DAS) untuk mengetahui detail peletakan dari antenna. Dari hasil perancangan, dibutuhkan yaitu 34 FAP yang perlu dipasang pada Gedung Tamansari. Kemudian dari simulasi untuk lantai Basement sampai lantai 16 memiliki rata-rata hasil RSL pada persentase terendah yaitu 95.09% dan tertinggi yaitu 99.18% sehingga telah sesuai standar KPI yaitu diatas 90% untuk masing-masing lantainya. Begitupun dengan SIR, masing-masing lantai telah memenuhi standar KPI diatas 90%, dimana memiliki ratarata SIR terendah yaitu dengan 96.76% dan tertinggi yaitu 98.24%. Abstract The availability of quality services in every place is important for customers. Such as in Tamansari Parama Building, access to high-speed data services is needed because the building as an office building. Femtocell is a solution that can be used for coverage areas and provides access to services customers in Parama Tamansari Building. The design of this LTE network is simulated using RPS software for coverage simulation and SIR. Also used is the Distributed Antenna System (DAS) method to find out the details of the placement of the antenna. From the results of the design it is needed that is 49 FAP which needs to be installed in the Tamansari Building. Then from the simulation for the Basement floor to the 16th floor, the average RSL results at the lowest percentage is 95.09% and the highest is 99.18% so that it meets the KPI standard which is above 90% for each floor. Likewise with SIR, each floor that has met the KPI standard above 90%, which has an average SIR which is the lowest with 96.76% and the highest is 98.24%.. Keywords: Femtocell, SIR, RSL, RPS, DAS