Jurnal Ilmiah Teknik Industri
Vol. 18, No. 1, Juni 2019

Pengembangan Algoritma Hybrid Flowshop Three-Stage Dengan Mempertimbangkan Waktu Setup

Utama, Dana Marsetiya (Unknown)
Garside, Annisa Kesy (Unknown)
Wicaksono, Wahyu (Unknown)



Article Info

Publish Date
01 Jul 2019

Abstract

Hybrid flow shop scheduling is one topic that is often reviewed by researchers at this time. Hybrid flow shop scheduling is the development of problems from pure flow shop. Flow shop problems have one machine at each stage. In this problem, each stage of operation has a machine that is arranged in parallel. This article aims to discuss the issue of hybrid flow shop scheduling at three stage to minimize makespan. Some previous studies discussed scheduling problems by considering setup time. However, such research is generally for the problem of pure flow shop. Therefore, a new algorithm is proposed to solve the problem. The proposed algorithm is developed from the Pour heuristic algorithm. Several experiments were conducted to determine the performance of the proposed algorithm. This study uses ten numerical experiments. This experiment uses the number of jobs varying from 5 jobs to 50 jobs. The results of numerical experiments show that the proposed algorithm has better performance compared to some other algorithms. The proposed method produces an effective solution if it is used to solve problems with a large number of jobs..

Copyrights © 2019






Journal Info

Abbrev

jiti

Publisher

Subject

Industrial & Manufacturing Engineering

Description

Jurnal Ilmiah Teknik Industri is a scientific journal that aims to participate in developing the scientific field of Industrial Engineering, contains the results of research and theoretical study from lecturers, researchers and industry practitioners. Jurnal Ilmiah Teknik Industri is administered by ...