Kilat
Vol 8 No 2 (2019): KILAT

Perencanaan Pembangkit Listrik Tenaga Surya Di Pos Pengamatan Gunung Soputan

Novi Gusti Pahiyanti (Sekolah Tinggi Teknik PLN)
Sigit Sumakajati (Unknown)
Axl Brian Androcles Tangkilisan (Unknown)



Article Info

Publish Date
06 Oct 2019

Abstract

This planning is carried out on the basis to meet the electricity needs that must continuously deliver electricity at the observation point of Mount Soputan, this is because electricity needs are very important in seeing the movement of the volcano. This plan with a planned load of 18.04 kWh. For such loading, 20 solar panels with 200 Wp capacity are used, and 2 solar panels controllers (SCC) are used, with each SCC used for 10 solar panels. As for the batteries used as many as 3 pieces with each battery having an energy of 2.4 kWh, then for the inverter using an inverter with a power of 2650 W.

Copyrights © 2019






Journal Info

Abbrev

kilat

Publisher

Subject

Automotive Engineering Civil Engineering, Building, Construction & Architecture Computer Science & IT Electrical & Electronics Engineering Energy

Description

KILAT Journal is a scientific journal published by STT-PLN. KILAT Journal is published twice in one year in April and October and contains the results of research in the fields of Mechanical Engineering, Electrical Engineering, Civil Engineering and Information Engineering, Law and Economics related ...